• 제목/요약/키워드: Distribution System Operation

검색결과 1,401건 처리시간 0.023초

Optimal Capacity and Allocation of Distributed Generation by Minimum Operation Cost in Distribution Systems

  • Shim Hun;Park Jung-Hoon;Bae In-Su;Kim Jin-O
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권1호
    • /
    • pp.9-15
    • /
    • 2005
  • In the operation of distribution systems, DGs (Distributed Generations) are installed as an alternative to extension and the establishment of substations, transmission and distribution lines according to the increasing power demand. In the operation planning of DGs, determining optimal capacity and allocation achieves economical profitability and improves the reliability of power distribution systems. This paper proposes a determining method for the optimal number, size and allocation of DGs in order to minimize the operation costs of distribution systems. Capacity and allocation of DGs for economical operation planning duration are determined to minimize total cost composed with power buying cost, operation cost of DGs, loss cost and outage cost using the GA (Genetic Algorithm).

배전자동화 계통의 루프 운전시 보호협조에 관한 연구 (A Study on the Protective Coordination of Distribution Automation System under Loop Operation)

  • 이희태;문종필;김재철
    • 전기학회논문지
    • /
    • 제58권7호
    • /
    • pp.1281-1286
    • /
    • 2009
  • As a general radial configuration of power distribution system, the various researches have being studied to change a radial configuration to network one such as smart, intelligent and micro grid for loop operation. If a radial configuration changes to network, protective coordination comes to the biggest problem. When a typical protective algorithm is applied to loop distribution system protection, the interrupted section is expanded, therefore, reliability grows worse. This paper presents the new protective method being able to apply to loop distribution system with Distribution Automation System (DAS) which separate the minimal faulted section. Through contingency analysis of the sustained and momentary fault, we analyzed the influence for radial configuration and loop configuration using interrupted area and proved the effectiveness of proposed method.

SCADA가 통합된 배전자동화 시스템의 변전소 사고 시 복구 자동화 알고리즘 (A Restoration Automation Algorithm on a Fault in Substation of SCADA-coordinated Distribution Automation System)

  • 홍준호;임일형;이승재;김태완;최면송;하복남;이성우
    • 전기학회논문지
    • /
    • 제58권11호
    • /
    • pp.2107-2114
    • /
    • 2009
  • It is impossible to take the instant action in the distribution system When fault occures in a substation because operation of the substation and the distribution system are separated. However the power system automation has been studying about unity operation and co-operation between SCADA and DAS(Distribution Automation System). In this paper proposes a new algorithm of efficiency restoration using a outage load switching to a healthy MTR a fault occurrence at a MTR in united system between DAS and SCADA. In addtion, proposed algorithm includes a outage restoration method which keeps MTR optimal capacity with reorganization of distribution network in case it can not restore outage state loads caused by shortage of healthy MTR remain capacity. In case that proposed sequence still can not complete restoration, this paper suggests a efficiency outage restoration with objective function included priority in outage loads. In the case studies, the proposed algorithm have been verified in 2 MTR and 3 MTR substation

배전계통에 전력용 변압기 병렬운전시 22.9 kV SFCL Bus Tie 적용방안에 관한 연구 (A Study on the Application of SFCL on 22.9 kV Bus Tie for Parallel Operation of Power Main Transformers in a Power Distribution System)

  • 온민귀;김명후;김진석;유일경;임성훈;김재철
    • 전기학회논문지
    • /
    • 제60권1호
    • /
    • pp.20-25
    • /
    • 2011
  • This paper analyzed the application of Superconducting Fault Current Limiter (SFCL) on 22.9 [kV] bus tie in a power distribution system. Commonly, the parallel operations of power main transformers offer a lot of merits. However, when a fault occurs in the parallel operation of power main transformer, the fault currents might exceed the interruption capacity of existing protective devices. To resolve this problem, thus, the SFCL has been studied as the fascinating device. In case that, Particularly, the SFCL could be installed to parallel operation of various power main transformers in power distribution system of the Korea Electric Power Corporation (KEPCO) on 22.9 [kV] bus tie, the effect of the resistance of SFCL could reduce the increased fault currents and meet the interruption capacity of existing protective devices by them. Therefore, we analyzed the effect of application and proposed the proper impedance of the R-type SFCL on 22.9 [kV] bus tie in a power distribution system using PSCAD/EMTDC.

이산형 동적 물류시스템에서 물류센터의 위치 (Location of the Distribution Centers in a Discrete Dynamic Distribution System)

  • 장석화
    • 산업경영시스템학회지
    • /
    • 제31권2호
    • /
    • pp.19-27
    • /
    • 2008
  • This paper addresses determining the location of the distribution centers in a discrete dynamic distribution system. In discrete and finite time horizon, the demands of retailers are dynamic for the periods. Some locations among the retailers can be chosen for the role of the distribution centers at the beginning of each period. The distribution centers have to be located at the location of minimizing logistics cost. Logistics cost factors are the operation cost and the fixed cost of distribution center, and the transportation cost. The distribution centers of minimizing sum of operation cost, fixed cost and transportation cost are determined among retailers in each period for the planning period. A mathematical model was formulated and a dynamic programming based algorithm was developed. A numerical example was shown to explain our problem.

빌딩용 DC 배전 시스템의 병렬 운전 시 발생하는 순환전류를 저감시키기 위한 제어 기법 (Control Method for Reducing Circulating Current in Parallel Operation of DC Distribution System for Building Applications)

  • 김학성;신수철;이희준;정철호;한동우;원충연
    • 전력전자학회논문지
    • /
    • 제18권3호
    • /
    • pp.256-262
    • /
    • 2013
  • In the large system such DC distribution for building, the method that a number of modules converters operation in parallel is commonly used. When parallel operation, circulating current is directly related to the loss of the entire system. Accordingly, each module to share the same current is the most important for the safety of the power system. In this paper, control method for reducing circulating current in parallel operation is proposed. furthermore response and operation of steady-state with parallel system was verified by simulation and experiment results.

Software Functional Requirements and Architectures of Microgrid Energy Management System

  • Sohn, Jin-Man;Yun, Sang-Yun
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제2권2호
    • /
    • pp.269-272
    • /
    • 2016
  • Distribution management system or microgrid energy management system plays an important role in monitoring, operation and control of electrical distribution systems by utilizing IT infrastructure. Nowadays, the rapid increase of the distributed resources makes the conventional management system have some additional functionality for the reliable operation due to intermittent renewables and the efficient operation on the economical purpose. In this paper, the brief standard software functional requirements of microgrid energy management system are provided through survey of the recent commercial products of the major vendors, and furthermore the architectures of microgrid energy management system are provided in comparison with major suppliers' microgrid energy management system. The summary of investigation will be able to make the developers and researchers focus on the specific functionality in the real world.

배전계통 운영의 중요요소들을 고려한 상시연계점 선정 종합 최적화 알고리즘 (Synthetically Optimal Tie Switches Selection Algorithm Considering Important Elements in Distribution Power System)

  • 김준호;임희택;유남철;임일형;최면송;이승재;하복남
    • 전기학회논문지
    • /
    • 제58권11호
    • /
    • pp.2079-2088
    • /
    • 2009
  • The optimal operation in distribution system is to select tie switches considering important elements(Load balance, Loss minimization, Voltage drop, Restoration index..) in distribution system. Optimal Tie Switches Selection is very important in operation of distribution system because that is closely related with efficiency and reliability. In this paper, a new algorithm considering important elements is proposed to find optimal location of tie switches. In the case study, the proposed algorithm has been testified using real distribution network of KEPCO for verifying algorithm and complex network for applying future distribution network.

전기고장접수 처리 자동화장치 개발운용 (COMPUTERIZED CALL RESPONSE SYSTEM DEVELOPMENT AND OPERATION FOR DISTRIBUTION SERVICES)

  • 이용해
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1989년도 하계종합학술대회 논문집
    • /
    • pp.265-269
    • /
    • 1989
  • Computerized to techniques have been applied to outage call processing system for rapid restoration of power to customers. This paper presents computer aided outage call processing system called '123' system, which has been in operation since 1987. And, also describes its origins, design conception to be considered and its operation effects. From a positive point of view, it shows the functions needs to be added and some problems to be improved. Additionally, it describes the integrated system which has functions of detecting distribution failure, locating failure position by logical computer processing, and although ADS (Automatic Distribution System) has yet to be built up, the primary purpose of the system is to improve service to the customer by means of rapid restoration of electricity outage.

  • PDF

FRTU 시뮬레이터를 이용한 차세대 배전지능화시스템 네트워크 성능검증 (Network Performance Verification for Next-Generation Power Distribution Management System Using FRTU Simulator)

  • 여상욱;손성용
    • 한국정보전자통신기술학회논문지
    • /
    • 제13권6호
    • /
    • pp.523-529
    • /
    • 2020
  • 배전선로계통의 효율적인 관리와 운영을 위해서 배전지능화시스템은 필수적이다. 배전지능화시스템은 IT를 기반으로 배전망을 통합관리하는 시스템으로 전력산업의 발전과 더불어 진화해 오고 있다. 현재의 배전지능화시스템은 주장치 단위의 독립운전을 기준으로 상대적으로 낮은 네트워크 전송속도로 운영되도록 설계되어있다. 하지만 최근 급속히 보급이 증가하고 있는 태양광이나 에너지 저장장치와 같은 분산자원으로 인하여 미래 배전환경의 운영은 보다 복잡해 지고 있으며 다양한 정보의 실시간 수집이 필요하다. 본 연구에서는 기존의 배전지능화의 한계를 극복하기 위해 차세대 배전지능화 시스템의 요구사항을 도출하였으며, 이를 기반으로 배전계통에 필요한 통신네트워크 체계와 성능요건을 정의하였다. 배전지능화시스템과 같은 대규모 시스템의 현장 도입에는 과도한 시간과 비용이 소요되므로 설계된 시스템의 성능 검증을 위하여 소프트웨어 기반의 단말장치 시뮬레이터를 개발하였다. 시뮬레이터를 활용하여 실제 운영과 유사한 시험환경을 구축하고, 단말장치를 1,000대 까지 증가시켰을 때 제시된 시스템의 네트워크 점유는 최대 10% 이하로 차세대 배전지능화시스템의 기능을 지원하기 위한 네트워크 요구사항을 충족함을 보였다.