• Title/Summary/Keyword: Distribution Facility

Search Result 806, Processing Time 0.024 seconds

Development of Short-circuit Testing Facility for Distribution Transformers (배전용 변압기 단락강도 시험설비 개발)

  • Park, Ji-Hun;Min, Yun-Hong;Kang, Young-Hak;You, Ho-Keun;Ahn, Kyu-Sun;Ham, Gil-Ho;Oh, Chang-Ju
    • Proceedings of the KIEE Conference
    • /
    • 2002.04a
    • /
    • pp.64-67
    • /
    • 2002
  • To increase the short-circuit testing capacity of distribution transformers, testing facility has been installed for KEPCO in Vi-wang. The power supply of testing facility is directly supplied from the network substation located closely. Testing can be performed up to 300 kVA for single-phase transformers, 500 kVA for three-phase transformers. Operating with this facility, the distribution company is able to maintain the reliable supply of electricity. Also the critical quality of transformers from manufacturers can be verified by short-circuit testing. This paper describes the design concept and specification of newly developed equipment and the procedure of short-circuit test.

  • PDF

Prediction of Air Movement and Temperature Distribution at Different Store Methods Using 3-D CFD Simulation in Forced-Air Cooling Facility

  • Yang, G.M.;Koh, H.K.
    • Agricultural and Biosystems Engineering
    • /
    • v.3 no.2
    • /
    • pp.65-72
    • /
    • 2002
  • Temperature is the most influential environment parameter which affects the quality change of agricultural products in cold storage. Therefore, it is essential to keep the uniform temperature distribution in the storage room. This study was performed to analyze the air movement and temperature distribution in the forced recirculating cold storage facility and to simulate optimum storage method of green groceries using 3-D CFD(three dimensional computational fluid dynamics) computer simulation which applied the standard $textsc{k}$-$\varepsilon$ turbulence model and FVM(finite volume method). The simulation was validated by the experimental results for onion storage and the simulation model was used to simulate the temperature and velocity distribution in the storage room with reference to the change of storage method such as location of storage, no stores, bulk storage, and pallet storage. In case of no stores, internal airflow was circulated without stagnation and consequently air movement and temperature distribution were uniform. In case of bulk storage, air movement was stagnated so much and temperature distribution of onion was not uniform. Furthermore, the inner temperature of onion roses more than the initial temperature of storage. In case of pallet storage, air movement and temperature distribution of onion were so uniform that the danger of quality change was decreased.

  • PDF

A FLOW AND PRESSURE DISTRIBUTION OF APR+ REACTOR UNDER THE 4-PUMP RUNNING CONDITIONS WITH A BALANCED FLOW RATE

  • Euh, D.J.;Kim, K.H.;Youn, Y.J.;Bae, J.H.;Chu, I.C.;Kim, J.T.;Kang, H.S.;Choi, H.S.;Lee, S.T.;Kwon, T.S.
    • Nuclear Engineering and Technology
    • /
    • v.44 no.7
    • /
    • pp.735-744
    • /
    • 2012
  • In order to quantify the flow distribution characteristics of APR+ reactor, a test was performed on a test facility, ACOP ($\underline{A}$PR+ $\underline{C}$ore Flow & $\underline{P}$ressure Test Facility), having a length scale of 1/5 referring to the prototype plant. The major parameters are core inlet flow and outlet pressure distribution and sectional pressure drops along the major flow path inside reactor vessel. To preserve the flow characteristics of prototype plant, the test facility was designed based on a preservation of major flow path geometry. An Euler number is considered as primary dimensionless parameter, which is conserved with a 1/40.9 of Reynolds number scaling ratio. ACOP simplifies each fuel assembly into a hydraulic simulator having the same axial flow resistance and lateral cross flow characteristics. In order to supply boundary condition to estimate thermal margins of the reactor, the distribution of inlet core flow and core exit pressure were measured in each of 257 fuel assembly simulators. In total, 584 points of static pressure and differential pressures were measured with a limited number of differential pressure transmitters by developing a sequential operation system of valves. In the current study, reactor flow characteristics under the balanced four-cold leg flow conditions at each of the cold legs were quantified, which is a part of the test matrix composing the APR+ flow distribution test program. The final identification of the reactor flow distribution was obtained by ensemble averaging 15 independent test data. The details of the design of the test facility, experiment, and data analysis are included in the current paper.

Study on a Optimal Inspection Cycle of Electrical facility of Railroad (철도전기설비의 최적점검주기에 관한 기초연구)

  • Chu, Cheol-Min;Kim, Jae-Chul;Lee, Tae-Hee;An, Jae-Min;Moon, Jong-Fil
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2007.05a
    • /
    • pp.224-228
    • /
    • 2007
  • It is focused on a methodology to establish a optimal inspection cycle of electrical facility of railroad Decision method of optimal inspection cycle is a process which establishes maintenance plan for facilities' immanent function as using reliability theory in operation term In order to ensure normal operation in a given condition, the decision method is logical for selecting effective maintenance plan to consider characteristic of system In estimation of failure rate, critical facility is selected firstly. After that, proper distribution function on each facility is decided to investigate distribution function for extraction of failure rate. Next, cost produced by the case that facility's failure is occurred is surveyed. Finally, maintenance method developed until now is investigated, before suitable model for the facility applying maintenance method is developed, and that maintenance decision is made. Therefore, this process is the method to find optimal inspection cycle for reasonable cost and effective reliability on facility.

  • PDF

The Analysis of Flow Distribution in the Core Channel of the HANARO Flow Simulated Test Facility (하나로 유동모의 시험설비의 노심채널 유동분포 해석)

  • Park Y C.;Kim K. R.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2004.10a
    • /
    • pp.151-154
    • /
    • 2004
  • The HANARO, a multi-purpose research reactor of 30 MWth open-tank-in-pool type, has been under normal operation since its initial criticality in February, 1995. Many experiments should be safely performed to activate the utilization of the HANARO. A flow simulated test facility has been developed for the verification of structural integrity of those experimental facilities prior to loading In the HANARO. This test facility is composed of three major parts; a half-core structure assembly, flow circulation system and support system. The half-core structure assembly is composed of plenum, grid plate, core channel with flow tubes, chimney and dummy pool. The flow channels are to be filled with flow orifices to simulate similar flow characteristics to the HANARO. This paper describes an analysis of the flow distribution of the cote channel and compares with the test results. As results, the analysis showed similar flow characteristics compared with those in the test results.

  • PDF

A Risk Evaluation Model of Power Distribution Line Using Bayesian Rule -Overhead Distribution System- (베이즈 규칙을 활용한 배전선로 위험도 평가모델 -가공배전분야-)

  • Joung, Jong-Man;Park, Yong-Woo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.6
    • /
    • pp.870-875
    • /
    • 2013
  • After introducing diagnosis equipment power failure prevention activities for distribution system have become more active. To do facility diagnosis and maintenance work more efficiently we need to evaluate reliability for the system and should determine the priority line with appropriate criteria. Thus, to calculate risk factor for the power distribution line that are composed of many component facilities its historical failure events for the last 5 years are collected and analysed. The failure statics show that more than 60% of various failures are related to environment factors randomly and about 20% of the failures are refer to the aging. As a strategic evaluation system reflecting these environmental influence is needed, a system on the basis of the probabilistic approach related statical variables in terms of failure rate and failure probability of electrical components is proposed. The figures for the evaluation are derived from the field failure DB. With adopting Bayesian rule we can calculate easily about conditional probability query. The proposed evaluation system is demonstrated with model system and the calculated indices representing the properties of the model line are discussed.

An Analysis of the Egg Distribution Industry in Korea and Developed Countries in the Post COVID-19

  • Yoon Doo KIM;Sue Ho CHAE
    • Journal of Distribution Science
    • /
    • v.21 no.7
    • /
    • pp.83-90
    • /
    • 2023
  • Purpose: This study aims to set desirable directions for Korea's egg industry by comparing and analyzing the egg distribution structure and policies between Korea and other countries. Research design, data and methodology: We analyzed the current state of egg distribution in Korea, and based on this analysis, we derived problems. In addition, by comprehensively analyzing the egg distribution structure and policy issues in the US, EU, and Japan. Results: As a result of the analysis of the egg distribution status and policy in the country to be analyzed, it was found that for the development of the egg industry in Korea, it is necessary to unify the distribution system for transparent and stable management of the egg distribution process. It was found that detailed and clear information creation and management of egg production and distribution processes were required. Conclusions: We need to establish a regional egg distribution facility base and stipulate that eggs produced in Korea must be compulsorily traded through the regional facility base. Seemingly, scaling-up of the industry is the priority, but the government is promoting various policies to expand small and medium-sized egg joint markets, with limitations in improving the problems of the existing egg distribution structure.

Optimizing Zone-dependent Two-level Facility Location Problem (Zone을 고려한 2단계 시설배치 계획 최적화)

  • Lim, Sung-Hoon;Sung, Chang-Sup;Song, Sang-Hwa
    • IE interfaces
    • /
    • v.24 no.4
    • /
    • pp.341-350
    • /
    • 2011
  • This paper considers a problem of locating both distribution centers and retailers in a zone-dependent two-level distribution network where either a distribution center or a retailer should be located in each zone. Customer demands of each zone should be satisfied directly from either its own distribution center or its own retailer being supplied from a distribution center of another zone. The objective of the proposed problem is to minimize total cost being composed of distribution center/retailer setup costs and transportation costs. In the analysis, the problem is proved to be NP-hard, so that a branch-and-bound algorithm is derived for the problem. Numerical experiments show that the proposed branch-and-bound algorithm provides the optimal solution efficiently for some small problems.

Facility Location Problem for Blood Logistics Center (혈액 물류센터 위치 선정 문제)

  • Lee, Sang-Un
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.12 no.2
    • /
    • pp.135-143
    • /
    • 2012
  • This paper suggests the optimal blood distribution center algorithm that satisfies the minimum total transportation cost and within the allowable distribution time $T^*$. Zhang and Yang proposes shifting the location of each point that has less than the average distance of two maximum distance points from each point. But they cannot decide the correct facility location because they miscompute the shortest distance. This algorithm computes the shortest distance $l_{ij}$ from one area to another areas. Then we select the $v_i$ area to thecandidate distribution center location such that $_{max}l_{ij}{\leq}L^*$ and the $v_i$ such that $l_{ij}-L^*$ area that locates in ($v_i,v_k$) and ($v_j,v_l$) from $P_{ij}=v_i,v_k,{\cdots},v_l,v_j$ path and satisfies the $_{max}l_{ij}{\leq}L^*$ condition. Finally, we decide the candidate distribution area that has minimum transportation cost to optimal distribution area.

Characteristics Analysis on Budget Distribution of Master Plan for Comprehensive Development Projects of Rural Villages (농촌마을종합개발사업의 기본계획 사업비 특성분석)

  • Kim, Dae-Sik;Lee, Seung-Han
    • Journal of Korean Society of Rural Planning
    • /
    • v.17 no.1
    • /
    • pp.13-27
    • /
    • 2011
  • This study analyzed the budget investment plans for the unit-project items(UPI) of 176 project districts for the rural village comprehensive development projects (RVCDP). This study classified the master plan reports of 176 project districts into 88 unit project items in aspect of project management, in order to analyze characteristics of distribution of budget in each project item. Most of all unit project items have similar types of uniform distribution with plus skewness in frequency pattern analysis except the total budget of the project district. This study analyzed the characteristics of budget distribution per province, year, and geographical types of region. Furthermore this paper also analyzed ratio of budget in unit project items to find out distribution pattern of each budget between project items over time. The hierarchical system for UPI of RVCDP consisted of three steps, which are 4 items of the first step on Strength of Rural-urban Exchange & Regional Capability (RURC), Green-income Infrastructure & Facility (GIF), Culture- health-welfare Facility, and Eco-environment & Landscape facility (ELF), 13 items for the second one, and 52 items for the third project items. From the results of the budget investment analysis for 5 years from 2004 to 2008, the budget investment ratios of RURC and ELF have steady state for every year, while GIF in decreasing and ELF in increasing over time. The ratios of UPI on infrastructure were decreased, whereas those on culture, health, and welfare were increased. Portion of tow project items among 52 items, which are community centers for village residents and rural experimental study facility, has 30% of total budget investment. Futhermore, the budget ratios of seven project items showed 50% of total budget. Average value of project budgets for five years was optimized as a type of exponential function in the case of decent array for ranking order.