• Title/Summary/Keyword: Dispute Settlement System

Search Result 119, Processing Time 0.024 seconds

Cardiac Intracoronary Stenting vs CABG: Prevention of Medical Accident (심장 스텐트 시술과 의료사고 예방)

  • Kim, Kyoung Reay;Park, Kook Yang
    • The Korean Society of Law and Medicine
    • /
    • v.18 no.2
    • /
    • pp.163-194
    • /
    • 2017
  • Coronary artery disease has increased in Korea as the country enters the aged society. It is well known that the incidence of coronary artery disease is related to aging, hypertension, diabetes, hyperlipidemia, and dietary habit. For effective treatment of significant coronary stenosis, close coordination between cardiac surgery and cardiology team is essential. Especially cardiologists' decision whether to do the stent placement or CABG is very important because the cardiologists usually start to consult the patients for their treatment. Recently, non-surgical interventions(that is stent placement) in cardiology field have dramatically increased as the national insurance system removed the limitation of the number of stents deployed. However, accidents are often caused by inappropriate use of stents, especially in patients with triple coronary disease or left main disease with heavy coronary calcifications. Another aspect of stent placement is to cope with an emergency case in the event of coronary rupture or pericardial tamponade during coronary interventions without cardiac surgeons. In the past two years, the Korea Consumer Agency (Consumer Dispute Coordination Committee) analyzed eight cases of medical dispute settlement. Only two hospitals were manned with both cardiologists and cardiac surgeons. Seven patients died of procedures of stenting and five patients died on the day of the procedure. Among the 8 cases, 5 cases showed 3 vessel disease and the rest of the cases had either severe calcification, complete occlusion or poor coronary antomies for stenting According to a 2017 national data registry of coronary stenting, less than 3 drug-eluting stents were implanted in 98% of all patients. In 2015, the number of stent procedures was 38,922, and approximately in 800 (2%) cases, more than four stents were used per patient. We emphasize that it is necessary to seriously consider the cost-benefit analysis between stent and CABG. The patient has the right to choose the right procedure by asking the liability of 'instruction explanation obligation'. He should be well informed of the pros and cons of both procedures to avoid overuse of stent. It can be solved by intimate discussion of individual cases with the cardiac surgeon and the patient. Unilateral dialogue with the patient, forceful restriction on the number of stenting, lack of surgeon's backup in difficult cases should all be avoided. It is also necessary to solve the problem not only at the hospital level, such as multidisciplinary integrated medical care, but also a nationwide solution such as expanding cardiac surgeons as essential personnel to public officials.

  • PDF

A Study on the Substantial impact of US high rate tariff policy on the Korean companies -Based on analysis of Article 301 of the US Trade Law -

  • Nam, Seon Mo
    • International Journal of Advanced Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.63-68
    • /
    • 2019
  • Recently, the United States and China have declared a 25% retaliatory tariff for the partner country products of 50 billion dollar scale. "Trade war" is getting full swing. Such conflicts between economic powers may spread to Japan like the domino phenomenon following the EU (European Union) and become bigger in the global trade war. As a result, Korea has an economic system with a high degree of external dependence, and there is an expert's analysis that it will become the largest victim of the global trade war. If the WTO Dispute Settlement Authority approves this US 301 retaliation measure in the same way as the past case (US-EU hormone-treated beef imports), the United States will not import any Chinese imported products Chinese products) can be imposed. If the US launches a special 301 or super 301, which is stronger than the regular 301, then China is very likely to enforce US retaliation against it, and the trade war between the two countries could become a reality. This phenomenon is likely to have a negative impact on Korean companies. In particular, Korea, which is highly reliant on intermediate goods exports to China, is expected to suffer a great deal of damage. Therefore, Korea needs flexible response at home and abroad, it is necessary to enhance the autonomy of companies and protect export industries. Adjusting corporate tax rate as well as domestic industry height will be one way. The long-term (21 months) trade war between the United States and China has resulted in economic uncertainty. The resulting damage must be compensated. It is necessary to prepare the compensation through the economic council between countries. In the future, the punitive damage compensation system should be introduced.

Interpretation of the Umbrella Clause in Investment Treaties (국제투자조약상 포괄적 보호조항(Umbrella Clauses)의 해석에 관한 연구)

  • Jo, Hee-Moon
    • Journal of Arbitration Studies
    • /
    • v.19 no.2
    • /
    • pp.95-126
    • /
    • 2009
  • One of the controversial issues in investor-state investment arbitration is the interpretation of "umbrella clause" that is found in most BIT and FTAs. This treaty clause requires on Contracting State of treaty to observe all investment obligations entered into with foreign investors from the other Contracting State. This clause did not receive in-depth attention until SGS v. Pakistan and SGS v. Philippines cases produced starkly different conclusions on the relations about treaty-based jurisdiction and contract-based jurisdiction. More recent decisions by other arbitral tribunals continue to show different approaches in their interpretation of umbrella clauses. Following the SGS v. Philippines decision, some recent decisions understand that all contracts are covered by umbrella clause, for example, in Siemens A.G. v. Argentina, LG&E Energy Corp. v. Argentina, Sempra Energy Int'l v. Argentina and Enron Corp. V. Argentina. However, other recent decisions have found a different approach that only certain kinds of public contracts are covered by umbrella clauses, for example, in El Paso Energy Int'l Co. v. Argentina, Pan American Energy LLC v. Argentina and CMS Gas Transmission Co. v. Argentina. With relation to the exhaustion of domestic remedies, most of tribunals have the position that the contractual remedy should not affect the jurisdiction of BIT tribunal. Even some tribunals considered that there is no need to exhaust contract remedies before bringing BIT arbitration, provoking suspicion of the validity of sanctity of contract in front of treaty obligation. The decision of the Annulment Committee In CMS case in 2007 was an extraordinarily surprising one and poured oil on the debate. The Committee composed of the three respected international lawyers, Gilbert Guillaume and Nabil Elaraby, both from the ICJ, and professor James Crawford, the Rapportuer of the International Law Commission on the Draft Articles on the Responsibility of States for Internationally Wrongful Acts, observed that the arbitral tribunal made critical errors of law, however, noting that it has limited power to review and overturn the award. The position of the Committee was a direct attack on ICSID system showing as an internal recognition of ICSID itself that the current system of investor-state arbitration is problematic. States are coming to limit the scope of umbrella clauses. For example, the 2004 U.S. Model BIT detailed definition of the type of contracts for which breach of contract claims may be submitted to arbitration, to increase certainty and predictability. Latin American countries, in particular, Argentina, are feeling collectively victims of these pro-investor interpretations of the ICSID tribunals. In fact, BIT between developed and developing countries are negotiated to protect foreign investment from developing countries. This general characteristic of BIT reflects naturally on the provisions making them extremely protective for foreign investors. Naturally, developing countries seek to interpret restrictively BIT provisions, whereas developed countries try to interpret more expansively. As most of cases arising out of alleged violation of BIT are administered in the ICSID, a forum under the auspices of the World Bank, these Latin American countries have been raising the legitimacy deficit of the ICSID. The Argentine cases have been provoking many legal issues of international law, predicting crisis almost coming in actual investor-state arbitration system. Some Latin American countries, such as Bolivia, Venezuela, Ecuador, Argentina, already showed their dissatisfaction with the ICSID system considering withdrawing from it to minimize the eventual investor-state dispute. Thus the disagreement over umbrella clauses in their interpretation is becoming interpreted as an historical reflection on the continued tension between developing and developed countries on foreign investment. There is an academic and political discussion on the possible return of the Calvo Doctrine in Latin America. The paper will comment on these problems related to the interpretation of umbrella clause. The paper analyses ICSID cases involving principally Latin American countries to identify the critical legal issues arising between developing and developed countries. And the paper discusses alternatives in improving actual investor-State investment arbitration; inter alia, the introduction of an appellate system and treaty interpretation rules.

  • PDF

Features of Arbitration Rules of Chine se Arbitration Center Across the Straits and Implications of the Establishment of Arbitration Rules of South-North Commercial Arbitration Commission (중국 해협양안 중재센터(海峽兩岸仲裁中心) 중재규칙의 특징과 남북상사중재위원회 중재규칙 제정의 시사점)

  • Yang, Hyo-Ryoung
    • Journal of Arbitration Studies
    • /
    • v.28 no.2
    • /
    • pp.111-135
    • /
    • 2018
  • As the disputes in the investment and civil/commercial sectors of China and Taiwan have increased due to active cross-strait economic exchanges, the Chinese government is addressing cross-strait disputes through various dispute resolution methods. In recent years, the Arbitration Center Across the Straits (ACAS) has been established to resolve disputes between cross-strait parties, while ACAS Arbitration Rules have been enacted and enforced. ACAS Arbitration Rules are prepared by referring to the Arbitration Act of China and Taiwan, the relevant provisions and practices of the China International Economic and Trade Arbitration Commission (CIETAC) Arbitration Rules and the cross-strait practical affairs of the China International Economic and Trade Arbitration Commission, and the cross-strait practical affairs giving consideration to the specificity of the cross-strait relationship and the characteristics of economic and trade disputes. Therefore, this paper has compared the features and main contents of the ACAS Arbitration Rules with those of the CIETAC Arbitration Rules. This refers to arbitration proceedings such as form and effect of arbitration agreement, decision of place of arbitration, and organization of arbitral tribunal; the provision of consolidation of multiple contracts and arbitration, and the provision of joinder of arbitration parties, which are implementing the "principle of party autonomy" with streamlining arbitration proceedings and reducing costs; "common, simple, and small sum arbitration proceedings which require shorter arbitration proceedings depending on the size of the arbitration object; and regulations on the "interconnection of mediation and conciliation" which is characteristic of China's arbitration system. Based on the above-mentioned main contents of the ACAS Arbitration Rules in China, there are some implications to be considered in the establishment of the Arbitration Rules of the South-North Commercial Arbitration Commission which will be applied to solve commercial and investment disputes arising from the Inter-Korean Economic Cooperation process, suggesting implications such as the need for the rapid composition and operation of the South-North Commercial Arbitration Commission, requirements for selecting arbitrators, expansion of the object of arbitration, specification of concreteness in deciding the place of arbitration, need to create a variety of arbitration proceedings, and application plan of the International Center for Settlement of Investment Dispute (ICSID) or Third Power Arbitration Agency.

The Current Situation of Construction Arbitration and Suggestions to Increase its Use in Korea (우리나라의 건설중재 현황과 활성화 방안)

  • Chae Wan-Byung
    • Journal of Arbitration Studies
    • /
    • v.14 no.2
    • /
    • pp.243-279
    • /
    • 2004
  • The construction arbitration field has developed considerably since the latter half of the 1990s. Through analysis of construction arbitration cases taken up by KCAB, this paper intends to show the present condition and the improvement direction of construction arbitration in Korea. The number of construction arbitration cases filed at KCAB has been increasing rapidly after 1997, but recently the rate of increase has tended to decline. From 2000 to 2003 the number of arbitration cases increased 23% each year, on average, but in 2003 the increase was only 7.6%. In the very beginning, public construction claims made up the majority of all construction cases, however, civil construction claims are increasing gradually. The arbitration amount in the construction field is very high, owing to public construction claims. For example, the arbitration amount per case was 5 billion won, on average,. in the public construction field. It is shown that the claimants of arbitration are mostly constructors and the main reasons for making claims are to demand payment for construction and payment for additional work. KCAB investigated the performance status of arbitration awards. The voluntary performance rate for awards in construction arbitration is nearly 80% and in 11%, a suit was filed to appeal the arbitration award. In spite of the development of construction arbitration, some improvements are requested. There have been arguments about the effectiveness of selective arbitration agreement in the General Terms of Construction Contract. This has caused a decrease in arbitration cases, so improvements in this dispute settlement clause need to be made. Enforcement of arbitration awards is granted by the judgment of a court. Resulting from this, appeals for arbitration awards are not allowed, however, up to three appeals for the enforcement of awards are allowed in court. As such, the enforcement system for arbitration awards needs to be improved and simplified.

  • PDF

An Overview of the Vietnam Commercial Arbitration Law in 2011 (2011년 베트남 상사중재법에 관한 소고)

  • Kim, Sun-Jeong
    • Journal of Arbitration Studies
    • /
    • v.23 no.4
    • /
    • pp.97-122
    • /
    • 2013
  • Vietnam has become an attractive destination for foreign investors, but confidence in the country's legal system to resolve commercial disputes remains low. Reasons include the lack of an independent judiciary, the lack of published court decisions, and a tendency to criminalize civil disputes, among others. As such, arbitration has become a preferred alternative to litigation. On June 17, 2010, the National Assembly of Vietnam passed a new act on commercial arbitration replacing the July 1, 2003 ordinance on commercial arbitration. The new act will take effect on January 1, 2011, and it is widely expected by the Vietnamese legal profession and lawmakers will create a favorable legal framework for the expansion of the arbitration service market in Vietnam. The new act is inspired by the UNCITRAL Model Arbitration Law of 1985 as are most new arbitration laws throughout the world. As opposed to the 2003 ordinance, the 2010 Act allows parties to request interim relief from the arbitrators. Also the new act eliminates the mandate that arbitrators be Vietnamese. The law has addressed the ordinance's shortcomings and reflects international standards. Commercial arbitration law is an important milestone in the improvement process of the laws on commercial arbitration in Vietnam. However, it is still too soon to affirm anything definitely because there remain many obstacles to the activation of arbitration. Rule of law and business cultural factors are important. The leading arbitral institution, VIAC, which is attached to the Vietnam Chamber of Commerce and Industry, is expected to play an important role for boosting the competitiveness of Vietnamese arbitration as an avenue to dispute settlement.

  • PDF

Is the U.S. Trade Expansion Act Section 232 Consistent with GATT/WTO Rules? (미국 무역확장법 제232조 조치는 GATT/WTO 규정에 타당한가?)

  • Yin, Zi-Hui;Choi, Chang-Hwan
    • Korea Trade Review
    • /
    • v.44 no.1
    • /
    • pp.177-191
    • /
    • 2019
  • Global trade protectionism has increased further and U.S. priorities and protectionism have strengthened since Trump took office in 2017. Trump administration is actively implementing tariff measures based on U.S. domestic trade laws rather than the WTO rules and regulations. In particular, the American government has recently been imposing high tariffs due to national security and imposing economic sanctions on other countries' imports. According to the U.S. Trade Expansion Act Section 232, the American government imposed additional tariffs on steel and aluminum imports to WTO member countries such as China, India, and EU etc. on march 15, 2018. Thus, this study aims to investigate whether the U.S. Trade Expansion Act Section 232 is consistent with GATT/WTO rules by comparing the legal basis of US / China / WTO regulations related to Section 232 of the U.S. Trade Expansion Act, and gives some suggestions for responding to the Section 232 measure. As the Section 232 measure exceeded the scope of GATT's Security Exceptions regulation and is very likely to be understood as a safeguard measure. If so, the American government is deemed to be in breach of WTO's regulations, such as the most-favored-nation treatment obligations and the duty reduction obligations. In addition, American government is deemed to be failed to meet the conditions of initiation of safeguard measure and violated the procedural requirements such as notification and consultation. In order to respond to these U.S. protection trade measures, all affected countries should actively use the WTO multilateral system to prevent unfair measures. Also, it is necessary to revise the standard jurisdiction of the dispute settlement body and to explore the balance of the WTO Exception clause so that it can be applied strictly. Finally, it would be necessary for Chinese exporters to take a counter-strategy under such trade pressure.

Improvement of Contract Change Order System for the Fairness of Subcontracting in Public Construction Projects (공공건설공사의 하도급 거래 공정화를 위한 계약변경 제도개선 방향)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.3-10
    • /
    • 2020
  • Subcontracting of construction is essential to carry out public construction projects. Subcontractor of the construction work shall enter into a contract with the original contractor without directly entering into a contract with the owner. Subcontracts are therefore greatly affected by the original contract with the owner. To protect subcontractors, the Fair Trade Act is enacted and the construction company's standard subcontracting contract is in operation. However, subcontracts are not properly reflected in the Government contract system, which deals with the relationships between the owner and the original contractor. In particular, the subcontractor may complain of difficulties at the public construction site as such procedures are not properly reflected in the construction work standard subcontract, although various procedures shall be carried out depending on the amount when change order occurs in subcontracts. Thus, the direction of improvement of subcontracting systems was proposed in the case of change order at public construction project sites as follows: First, the rights of subcontractors should be strengthened. Second, in order to resolve the information non-identity, subcontractors should have access to information related to subcontracts. Third, the status of subcontractor shall be guaranteed by reflecting the characteristics of the subcontract when the original contract for public works is concluded. Fourth, the dispute settlement method should be prioritized over litigation in order to fair subcontracting.

Legal Issues of "Zeroing" Practice Based on the Article 2.4.2 of the WTO Anti-Dumping Agreement (WTO 반덤핑협정 제2.4.2조에 의거한 네거티브 덤핑마진 산정 방식("제로잉")의 법적 문제)

  • Chae, Hyung-Bok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.38
    • /
    • pp.265-302
    • /
    • 2008
  • This paper intends to analyse some legal issues on "Zeroing" which is based on the article 2.4.2 under the WTO Anti-dumping Agreement. "Zeroing" stands for a specific methodology in calculating a general dumping margin for a product in question under which negative individual dumping margins are treated as zero (thus "zeroed") before aggregating all individual dumping margins. The article 2.4.2 of the Anti-dumping Agreement regulates three types of calculating methodology on dumping margin as first symmetrical method(average-to-average: A-A), second symmetrical method(individual-to-individual: I-I) and asymmetrical method(average-to-individual: A-I). However, this article does not have any provisions about the "Zeroing" practice. In their anti-dumping practices, the EC and the United-States calculated dumping margin based on the "Zeroing", but this methodology has been disputed in the Dispute Settlement Body(DSB) of the WTO. This paper analysed their legal problems with some WTO cases in particular concerning EC-Bed Linen, U.S.-Softwood Lumber Zeroing, U.S.-Zeroing(EC) and U.S.-Sunset Review(Japan) cases. On the basis of theses analysis, we can therefore ask some questions as follows; To begin with, although the article 2.4.2 of the WTO Anti-dumping Agreement does not clearly refer to the "Zeroing", how do some developing countries, as the U.S.A and the E.U. calculate dumping margin as the "Zeroing"? Secondly, what is the relationship between the symmetrical method and asymmetrical method to the dumping margin? And if we adopt the zeroing method, what is the different rate to anti-dumping margin? Thirdly, although the Panel decided that the zeroing methodology of dumping margin used by th U.S.A in administrative review between the U.S.A and the E.U, why does the Appellate Body made the decision that the american methodology is incompatible with the WTO Anti-dumping Agreement? Lastly, what will be affected the upper decision taken by the Appellate Body to the DDA negotiation of anti-dumping matters? Even though the WTO Appellate made a decision that the zeroing method is incompatible with the principles of the WTO law, this methodology contains a lot of problems. Some members of the WTO as the U.S.A and the E.U did not officially declare this methodology to abandon, and the debate concerned is arguing. Therefore this paper tried to present the adequate solution in order to promote the zeroing methodology in the international anti-dumping system and practices.

  • PDF