• 제목/요약/키워드: Dismantling Project

검색결과 29건 처리시간 0.022초

The Status of the KRR-l&2 Decommissioning Activities

  • Chung, Un-Soo;Park, Seung-Kook;Hong, Sang-Bum;Park, Jin-Ho
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2004년도 Proceedings of the 4th Korea-China Joint Workshop on Nuclear Waste Management
    • /
    • pp.96-105
    • /
    • 2004
  • The decommissioning project of the KRR 1 & 2 was started in January 1997. The actual decommissioning activity was started at the RI production facility and was finished at the end of 2002. The dismantling works of all components including the reactor structure of the KRR-2 was started in January, 2003 and will be carried out for 2 years till the end of 2004. The project schedule is estimated to delay for 4∼5 months beyond the original plan because of delaying on the cutting of thermal column nose and removal of the graphite bricks, but it may be caught up during the removal working of concrete from biological shielding structure. This paper summarizes the general status of the KRR 1 & 2 and decommissioning activities.

  • PDF

LCI DB를 활용한 해체공사 환경경제성 평가 (Evaluation of Environmental Economics on Dismantling Projects Using LCI DB)

  • 권석현;김경주;김병수;김상범
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.233-238
    • /
    • 2008
  • 우리나라는 경제규모에 비해 환경오염물질 배출량이 많으며, 이는 에너지 다소비업종의 비중 증가에 따른 것이다. 이에 따라 에너지 다소비업종 중 하나인 건설 관련 공사에 대한 효율적인 에너지 절약이 이루어지지 않는 문제점이 대두되고 있다. 뿐만 아니라 근래 노후화된 건축물의 해체공사가 빈번하며, 이러한 상황에서 좀 더 나은 에너지 절약효과를 갖기 위해서는 건설공사의 전과정(Life Cycle) 중 해체단계에서 발생하는 에너지소비량, 환경오염물질 배출량, 환경비용등에 관한 기본적인 DB 구축 및 활용방안 개발이 필요할 것이다. 이에 본 연구에서는 지식경제부와 환경부에서 제시하는 LCI DB를 활용하여 해체공사시 발생하는 환경오염물질 배출량을 산출하고 환경오염물질별 환경비용을 환산하여 건축물 해체공사에 대한 환경경제성을 평가하고자 하였다. 이를 위해 관련 자료조사, 기존 문헌연구 및 현장조사 등을 실시하였고 이들 수집자료의 분석결과를 바탕으로 사례대상인 건축물의 환경경제성을 평가하였다.

  • PDF

재실 리모델링 특성을 반영한 공정계획 기법 (Scheduling Technique for Remodeling Project of Inhabited Condition)

  • 백화숙;남욱진;김성한;김형진;최종수;김경환
    • 한국건설관리학회논문집
    • /
    • 제14권2호
    • /
    • pp.141-149
    • /
    • 2013
  • 임대시장의 경쟁이 점점 치열해지고 빌딩의 수익성을 고려하게 되면서, 높은 임대수익과 노후 건물의 이미지 개선 및 유지관리 측면을 동시에 충족할 수 있는 재실 리모델링에 대한 관심이 증가하고 있다. 특히 도심지에 위치한 노후화된 중/고층 오피스, 상가, 호텔, 병원 등의 건물은 지속적인 사용을 통한 시설물 가치 유지와 안정적인 임대수입 보장 및 시설물 운영의 필요성 등의 이유로 인하여, 거주자 재실상태의 리모델링이 전체 거주자 이주 후의 전체 공실 리모델링이나 재건축과 비교할 때 많은 장점을 가지고 있다. 그러나 재실 리모델링은 기존의 재건축, 전체 공실 리모델링과 비교하여 훨씬 더 제한된 시간과 공간의 작업환경 하에서, 거주자의 안전을 고려하며 거주자 민원 발생의 요인을 줄이는 방법으로 공사를 진행해야하는 어려움이 있다. 이에 본 연구에서는 재실 리모델링 공정관리에 대한 체계성 확보를 위하여 거주자 재실에 따른 복합적인 제약조건들을 해체, 신축, 재실, 이주 과정에 통합적으로 반영할 수 있는 공정계획 기법을 제안하고, 기존의 공정관리 시스템과의 연계성을 위하여 MS-Project로 공정표현 방법을 제시하였다.

TOPSIS-Based Decision-Making Model for Demolition Method Selection

  • Lee, Hyung Yong;Cho, Jae Ho;Son, Bo Sik;Chae, Myung Jin;Lim, Nam Gi;Chun, Jae Youl
    • Architectural research
    • /
    • 제23권4호
    • /
    • pp.67-73
    • /
    • 2021
  • An efficient demolition process requires the optimum method selection considering stability, economic feasibility, environment, and workability. In reality the construction cost and period are priority concerns, and safe construction methods are neglected. In addition, the choosing demolition method is often determined subjectively by experienced field engineers. This research paper presents a multi-criteria decision-making method using Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) to select the optimum demolition method. Three experienced demolition engineers' opinions were used to develop the TOPSIS model. The case study showed that the preferences of ten attribute measurements for demolition method selection. Authors suggested the most preferable demolition method for the case study project.

Development of the Selection of Optimal Conceptual Design for the Noise-reduced Aluminum System Form

  • Hong, Jong Hyun;Yeom, Dong Jun;Seo, Jung Hoon;Kim, Young Suk
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.708-709
    • /
    • 2015
  • In Korea, a series of noise-reduced aluminum forms are being recently used in apartment housing construction. However, their complicated and time-consuming work processes, and the noise which is still generated due to the inherent property of aluminum when especially installing and dismantling them are have been pointed out as a problem to be certainly solved for increasing their practical use in construction sites. The primary objectives of this study are to propose a conceptual design of a newly designed noise-reduced aluminum form in which the noise can be enormously decreased during form works. The conceptual design in this study improved problems of conventional system aluminum forms, and, later, a system aluminum form developed based on this conceptual design will be able to ensure noise-reduction and safety as well as excellent applicability.

  • PDF

RISK ASSESSMENT USING BIM BASED SAFETY MANAGEMENT SYSTEM

  • Hongseob Ahn;Hyunjoo Kim;Wooyoung Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.107-110
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, falsework (temporary structures) in construction projects is fundamentally important. However, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. It is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop the safety assessment system, this research utilizes the BIM technology and collects important information by importing data from BIM models and use it in the planning stage.

  • PDF

원전 차폐 콘크리트 구조물 제염해체공사 리스크 분류체계 구축: 구조적 / 작업 리스크를 중심으로 (Development of Risk Breakdown Structure of Nuclear Power Plant Decommissioning Project: Focusing on Structural Damage / Work Process Risks)

  • 김별;이주성;안용한
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제22권3호
    • /
    • pp.38-45
    • /
    • 2018
  • 건설해체공사와 유사한 특성을 갖는 원전 제염해체공사에서 구조적 리스크 관리는 매우 중요하다(DOE). 하지만 제염해체작업 중 발생할 수 있는 구조적 재난재해 및 위험요소는 크게 고려하지 않고 있다. 이로 인해, 구조적 재난 및 재해에 의해 발생할 수 있는 작업자 리스크 역시 체계적으로 정립되어 있지 않다. 또한, 재난 및 재해 그리고 리스크 분류체계는 작업의 특성(작업프로세스, 활용장비, 작업 위치 등)별로 분류되어 있지 않아 실제 해체공사를 위한 매뉴얼로 활용하기에 무리가 있다. 따라서 차폐 콘크리트 구조물 제염해체공사의 건설해체공사와의 유사성을 기반으로 작업의 특성별로 분류한 리스크를 도출하는 것은 원자력 발전소 해체공사 리스크 관리에 필수적으로 판단한다.

갱폼 공사 중대재해 사고 예방을 위한 체크리스트 개발 (Checklist Development for Preventing of Major Accidents of Formwork Using Gang-form)

  • 정경태;김시유;오정은;이동훈
    • 한국건설안전학회 논문집
    • /
    • 제5권1호
    • /
    • pp.9-16
    • /
    • 2023
  • 본 연구에서는 갱폼 건설현장의 안전사고에 대한 유해 위험방지와 안전대책을 위해 갱폼 공사 중대재해 사고 예방을 위한 체크리스트를 개발하였다. 연구 방법은 갱폼 공사 건설현장의 체크리스트 항목을 도출하기 위하여 국내 건설현장에서 발생했던 1명 이상의 사망사고가 발생한 중대재해 사례를 분석하였다. 국내 건설현장에서의 중대재해 사례 36건을 분석하여 총 20개의 위험요인을 도출하였으며, 위험요인을 사전에 점검하기 위한 안전관리 항목 총 43가지 항목을 도출하였다. 도출된 안전관리 항목의 중요도와 체크리스트 형식에 대한 적합성을 평가하기 위해 안전관리전문가 37명을 대상으로 설문조사를 진행하였다. 본 연구의 결과로 체크리스트를 도출하였으며, 갱폼 공정순서인 조립, 설치, 해체/인양, 기타를 기준으로 체크항목을 중요도 순서로 배치하여 작업자 스스로가 갱폼의 작업순서와 안전수칙을 준수할 수 있도록 체크리스트를 구성하였다. 본 연구의 결과가 갱폼 건설현장에서의 사망자와 재해자가 줄어들 수 있기를 기대한다.

AHP 분석을 통한 종합병원 리모델링 공사의 리스크 요인 우선순위 평가 (An Evaluation of the Importance of Risk Factors for the General Hospital Remodeling Approached by Analytic Hierarchy Process (AHP))

  • 문성주;고성석
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제30권3호
    • /
    • pp.45-56
    • /
    • 2024
  • Purpose: It is important to note that the relative importance of risk factors should be identified to successfully complete the remodeling project of general hospital. Approached by analytic hierarchy process (AHP), the present study aimed to systematically evaluate the risk factors for remodeling of general hospital. Methods: The present work classified the risk factors of general hospital remodeling into four major categories including the requirements survey stage, planning and design stage, dismantling and construction stage, and maintenance stage. In addition, four sub-categories were derived from each major category factor. Furthermore, five major categories and four subcategories were selected to be considered from the perspectives of two stakeholders of contractor and constructor. The relative importance of the major and sub-categories factors was calculated using the AHP technique on the survey data collected from 49 respondents who participated in the survey study. Results: The results indicate that, the risk factor of requirements survey stage was found to be the most important risk factor to consider among the four major categories of factors. Also, insufficient preliminary investigation, design inconsistencies in architecture/mechanics/electricity, occurrence of safety accidents, and insufficient review of various equipment capacities and performances were found to have the highest priorities of each subcategory factor group included in the four major categories. From the perspective of contractor, the error in predicting the construction period was found to be the most important risk factor. The occurrence of safety accidents during construction was found to be the most important risk factor to be considered by constructor. Implications: The result of the current work should provide important insights and guidelines for the risk management activity that contributes to controlling the project time, cost, and scope required for general hospital remodeling.

3-D Temporary Facility Visualization Using BIM(Building Information Modeling) Technology

  • Kim, Hyun-Joo;Ahn, Hong-Seob;Kim, Woo-Young
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권2호
    • /
    • pp.37-42
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. Therefore, it is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop a safety identification system of temporary facilities, this research utilizes the BIM technology in retrieving important information by importing data from BIM models and use it in the safety planning stage.