• Title/Summary/Keyword: Discharge-duration curve

Search Result 58, Processing Time 0.025 seconds

Assessment of the Water Quality of Jungnang Stream by Flow Conditions Using Load Duration Curve (부하지속곡선을 이용한 중랑천의 유량 조건별 수질특성 평가)

  • Choi, Kyung-Wan;Shin, Kyung-Yong;Lee, Hyung-Jin;Jun, Sang-Ho
    • Journal of Environmental Health Sciences
    • /
    • v.38 no.5
    • /
    • pp.438-447
    • /
    • 2012
  • Objective: The objective of this study was to suggest a method through which load duration curve was used to assess the achievement of water quality targets in accordance with the criteria for pollutant load depending on flow rate variation. Methods: The stage-discharge curve and flow duration curve of Jungnang Stream were deduced. Using water quality targets and measurement of the stream, the flow duration curve was also drawn. Based on these, the feasibility of achievement of water quality targets in respect to flow rate was assessed. Results: In terms of the load duration curve of the stream, it was observed that excess of criteria for concentrations of $BOD_5$, $COD_{Mn}$ and SS frequently occurred. On the other hand, when the flow rate was low, the concentrations of T-N and T-P exceeded the criteria. Conclusions: Through the load duration curve, the overall water quality of Jungnang Stream was understood. When the flow rate is high, management of point source of $BOD_5$, $COD_{Mn}$ and SS is needed to achieve water quality targets for Jungnang Stream. On the other hand, when the flow rate is low, the management of non-point source T-N and T-P is necessary to attain the water quality goal.

Assessment of Pollution Levels in the Jangsungcheon Watershed Using Load Duration Curves and Analysis of the Causes

  • Cho, Sohyun;Bak, Jonghun;Lee, Yeong Jae;Kim, Kyunghyun;Jung, Kang Young
    • Journal of Environmental Science International
    • /
    • v.28 no.10
    • /
    • pp.873-885
    • /
    • 2019
  • In this study, a load duration curve was applied to the Jangseongcheon, one of the tributaries of the Yeongsan River, to assess whether the target water quality was achieved. In addition, pollution of the water body was investigated to develop and suggest the optimal management time with respect to polluted flow sections and monthly conditions. The average flow rates of sections JS1 and JS2 were $0.25m^3/s$ and $1.08m^3/s$, respectively. The BOD and T-P for water-quality standards at JS1 were rated at II, whereas the COD and TOC were rated at III, thus indicating a fair level of water quality. By contrast, the BOD at JS2 was rated at III, the T-P at IV, and the TOC at V, indicating poor water quality in this section. The load duration curve was plotted using the actual flow data measured in eight-day intervals for eight years from 2011 to 2018 at locations JS1 and JS2 in the Jangsungcheon Basin. In an assessment using the load duration curve on whether the target water quality was met at location JS1, all of the water quality parameters (BOD, COD, TOC, T-N, T-P, and SS) satisfied the target water quality. By contrast, at location JS2, parameters COD, TOC, T-N, and T-P exceeded target values by more than 50%, indicating the target water quality was not met. The discharge loads of locations JS1 and JS2 were analyzed to identify the reasons the target water quality was exceeded. Results revealed that the land system contributed considerably. Furthermore, the discharge load of JS2 accounted for more than 80% of the load on the entire basin, excluding that of JS1. Therefore, the best method for restraining the inflow of pollutants into the stream near location JS2 must be applied to manage the water quality of the Jangsungcheon.

Pollutant Load Delivery Ratio for Flow Duration at the Chooryeong-cheon Watershed (추령천 유역의 유황별 유달율 계산)

  • Kim, Young-Joo;Yoon, Kwang-Sik;Son, Jae-Gwon;Choi, Jin-Kyu;Chang, Nam-Ik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.4
    • /
    • pp.19-26
    • /
    • 2010
  • To provide the basic information for the water quality management of the Sumjin River Basin, delivery ratios for flow duration were studied. Using the day-interval data set of discharge and water quality observed from the Chooryeong-cheon watershed, the flow-duration and discharge-load relation curves for the watershed were established, then the load-duration curve was constructed. Delivery ratios for flow duration were also developed. Delivery ratios showed wide variation according to flow conditions. In general, delivery ratio of high flow condition showed higher value reflecting nonpoint source pollution contribution from the forest dominating watershed. To resolve this problem, a regression model explaining the relation between flow rate and delivery ratio was suggested. The delivery ratios for different flow regime could be used for pollutant load estimation and TMDL (Total maximum daily load) development.

Regionalization of Daily Flow Characteristics Using Flow Duration Curve and Spatial Interpolation Algorithm (유황곡선과 공간 내삽 알고리즘을 이용한 일유출량 특성의 지역화)

  • Yun, Yong-Nam;Kim, Jae-Seong;Lee, Dong-Ryul
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.6
    • /
    • pp.671-679
    • /
    • 2000
  • Regionalization technique using flow duration curve and spatial interpolation algorithm is developed for the purpose of estimating daily flow time series at ungauged station. In this study, we assumed a part of 8 gauging stations of Nakdong River basin as ungauged stations. Then, we generated flow duration curves and daily flow hydrographs by regionalization technique at ungauged stations. And we compared generated and observed hydrographs. The simulation results showed that the observed flows were well simulated by the proposed method and that the general patterns of the observed flows were satisfactorily reproduced by the regionalization technique. From these results, it is possible that we obtain daily flow information without application of labour intensive and time consuming deterministic models, which require complicating quantification of model parameter values. And we compared the regionalization techniques with the specific discharge method which is the most general approach in hydrological practice in Korea. The results showed that the regionalization technique was superior to specific discharge method.method.

  • PDF

A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River (낙동강수계 수질오염총량관리를 위한 시범소유역 유황별 유달율 산정방법 연구)

  • Shon, Tae-Seok;Park, Jae-Bum;Shin, Hyun-Suk
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.5
    • /
    • pp.792-802
    • /
    • 2009
  • The objective of this study is to construct the watershed management system with link of the non-point sources model and to estimate delivery ratio duration curves for various pollutants. For the total water pollution load management system, non-point source model should be performed with the study of the characteristic about non-point sources and loadings of non-point source and the allotment of pollutant in each area. In this study, daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator and SWAT model. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. As a result, the SWAT simulation results show good agreements in terms of discharge, BOD, TN, TP but for more exact simulation should be kept studying about variables and parameters which are needed for simulation. And as a result of the characteristic discharges, pollutants loading with the runoff and delivery ratios, non-point sources effects were higher than point sources effects in the small-scale test bed of Nakdong river basin.

Application Load Duration Curve for Evaluation of Impaired Watershed at TMDL Unit Watershed in Korea (수질오염총량 단위유역의 유량조건별 수체 손상 평가를 위한 부하지속곡선 적용성 연구)

  • Hwang, Ha-Sun;Yoon, Chun-Gyeong;Kim, Ji-Tae
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.6
    • /
    • pp.903-909
    • /
    • 2010
  • The purpose of this study was evaluated on the applicability of Load Duration Curve Method (LDC Method) using HSPF watershed model and sampling data for efficient TMDLs in Korea. The LDC Method was used for assessment pollutant characteristics in watershed and water quality variation in each water flow level. Load Duration Curve is applied for judge the level of impaired water-body and can be estimated the impaired level by pollutant, such as BOD, T-N, and T-P in this study depending on variation of stream flow. As a result, BOD, T-P was usually exceed the standard value at low flow and dry hydrologic period. Improvement of effluent concentration from WWTP and riparian buffer protection zone are effective to improve the water quality. T-N showed the worst condition at mid-range hydrologic period and moist hydrologic period. Therefore, soil erosion control program and BMPs for non-point source pollution control is effective for recovery the water quality, which can be useful method for management of water quality in the plan of recovery water quality spontaneously. Applicability of LDC Method was evaluated in the Nakbon A watershed. However, we need to consider more detailed and accumulated data set such as accurate GIS data and detail pollution data, and WWTP discharge water quality data for accurate evaluation of watershed. Overall, The LDC Method is adequate for evaluation of watersheds characteristics, and its application is recommended for watershed management and TMDL Implementation.

TMDL Evaluation of Nakdong River Basin Using Load Duration Curve and Streamflow-Load Rating Curve (부하지속곡선과 유량-부하량 상관곡선을 이용한 낙동강 유역의 오염총량평가)

  • Shon, Tae Seok;Joo, Jae Seung;Park, Jae Beom;Shin, Hyun Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5B
    • /
    • pp.475-481
    • /
    • 2011
  • The TMDL standard flow as applying watershed management regime uses the average low flow of past 10 years. Moreover, the TMDL implementation assessment has been enforced through management of pollutant load satisfied objective water quality. Even though the present allocation and management through averaged low flow are still convenient, they are not enough to solve ultimate goals of watershed management to keep up recovery of water body. To maintain the same water quality concentration, the standard flow is required to consider total discharge in management plan which helps to keep healthy ecosystem. In view of this, it would be possible to approach reasonable assessment by reflecting variably changeable discharge from precipitation-streamflow relation and the TMDL standard establishment considering artificial regulated flow. Therefore, this study attempts to develop the TMDL method using Load Duration Curve (LDC) and Streamflow-Load Rating Curve (QLRC) considering total discharge and finds drawbacks with solutions as applying on Nakdong river TMDL unit watershed. Finally, this research evaluates possibility of application on pollutant load allocating and implementation assessment in Korea.

Effective Method of determining the Water Discharge of a Pondage I considering Operating Constraint (수력기 운전제약을 고려한 저수지식댐의 효과적인 사용수량 결정에 관한 연구)

  • Jeon, Dong-Hoon;Nam, Jae-Hyun;Park, Si-Woo
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.784-786
    • /
    • 1997
  • In this Paper, the effective method of determining the water discharge of a pondage hydro-unit for hydro dispatch is proposed. The water discharge of a pondage hydro-unit can be determined subtracting the spillage discharge from summation of the inflow and the pondage according to variation of the water level of the reservoir. Proposed method calculates the inflow using the duration curve, the water level from initial level on January 1, and the spillage discharge from the water discharge.

  • PDF

A Forecasting Model for the Flood Peak Stage and Flood Travel Time by Hydraulic Flood Routing

  • Yoon, Yong-Nam;Park, Moo-Jong
    • Korean Journal of Hydrosciences
    • /
    • v.4
    • /
    • pp.11-19
    • /
    • 1993
  • The peak flood discharge at a downstream station and the flood travel time between a pair of dams due to a specific flood release from the upper reservoir are computed using a hydraulic river channel routing method. The study covered the whole large reservoir system in the Han River, Korea. The computed flood discharges and the travel times between dams were correlated with the duration and the magnitude of flood release rate at the upstream reservoir, and hence a multiple regression model is proposed for each river reach between a pair of dams. The peak flood discharge at a downstream location can be converted to the peak flood stage by a rating curve. Hence, the proposed regression model could be used to forecast the peak flood stage at a downstream location and the flood travel time between dams using the information on the flood travel time, release rate and duration from the upper dam.

  • PDF

A study on the characteristics of operating limits of High-Pressure discharge lamps during Voltage Sag (Voltage Sag에 의한 고압 방전등의 운전한계 특성 연구)

  • Jeong, Sung-Won;Hwang, Keon-Ho;Lee, Hyun-Chul;Lee, Geun-Joon;Gim, Jae-Hyeon
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.37-40
    • /
    • 2008
  • This paper presents the results of a simulation to analyze the effects of voltage sag on high-pressure discharge lamp(400[W]). In this paper, voltage sag is considered a reduction between 0 and 0.9[p.u] in nominal voltage magnitude, with duration between 0.01 and 90cycle. The simulation results depict the characteristics of the lamp about operating limits during voltage sag by the magnitude and duration of sag in CBEMA curve.

  • PDF