• Title/Summary/Keyword: Discharge planning

Search Result 173, Processing Time 0.022 seconds

Analysis and Comparison of Flow Rate Measurements Using Various Discharge Measuring Instrument and ADCP (다양한 유량 측정기기와 ADCP를 이용한 유량 비교 분석)

  • Ji, Ju-Yeon;Park, Seung-Yong;Lee, Gwang-Woo;Park, Gyeong-Min;Hwang, Soon-Hong;Kim, Dong-Ho;Lee, Young-Joon
    • Journal of Environmental Science International
    • /
    • v.22 no.2
    • /
    • pp.251-257
    • /
    • 2013
  • Discharge data examine the process of hydrologic cycle and used significantly in water resource planning and irrigation and flood control planning. It makes high quality discharge data, they carry out research on standard and method of discharge measurement, and equipment improvement. Now various flow meters are utilized to make discharge data in Korea. However, accuracy of equipment and exprerimental research data from measurement are not enough. ADCP(Acoustic Doppler Current Profiler) have been introduced and utilized for flow measurements since the end of 1980's. ADCP flow method is a formal method for flow measurement can easily applyd to relatively large rivers gradually recognized. This equipment can measure the non-contact three-dimensional velocity and water depth data very quickly and efficiently. Also, spatial and temporal resolution of the data is more accurate than any other flow measurement methods which measure flow rate by velocity - area measurement method. In this paper, the velocity is measured using various flow meter and verified the effectiveness by applying from the ADCP in Geum-river. Various flow meters which are med for discharge measurements are VALEPORT002, FLOW TRACKER, PRICE AA and ADCP. The average of five times flow measurement result by ADCP was $10.412m^3/s$, with a standard deviation of 0.68. The repeat test by ADCP and comparison between ADCP and other flow devices to verify the most import factor, flow measurement accuracy. In the result, repeat test of the ADCP showed similar values, flow values were similar to other velocity device results and the average error is 7.7%.

A Study on Derivation of Rating Curve for Yangsan River (양산천 수위-유량 관계곡선의 유도에 관한 연구)

  • Lee, Y.H.;Lee, S.B.
    • Journal of Korean Port Research
    • /
    • v.12 no.1
    • /
    • pp.131-143
    • /
    • 1998
  • This paper presents derivation of stage-discharge curve for Yangsan river. To derivate of stage-discharge lationship is one of the essential research areas in the water resource field. It provides reliable data a long term planning and hydrologic quantity on water resource development by quantitative analysis. The rating curve derivated through 15 discharge-observation on Yangsan river basin in 1997 has been estimated Q=1283.0262-1553.3158H+477.2702H2. According to the rating curve, the highest water level 2.6m, the limited water-level should be bound to the maximum of 2.6m. Before this research, stage-discharge curve of Yangsan river has not been developed, and only 15 discharge observation(hydrometry) has been carried out though this research. Therefore it seems necessary to collect observation data through a long term process to obtain a reliable rating curve equation.

  • PDF

The Study on Hydraulic Model Experiment of Discharge Channel and Spillway (여수토 방수로의 수리모형검시에 관한 연구)

  • 김시원
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.8 no.2
    • /
    • pp.1124-1140
    • /
    • 1966
  • 'This hydraulic experiment have been practised Juk an Reservoir spillway and discharge 'channel which the province Kyong Buk was constructed and designed U. hook, for seizing all state of hydraulic. As result of the experimellt planning and making the model test, it has gained the necessary data at the amendment, projection of the most rational and economical result. 1. Project (1) Experiment project....1/30 of the discharge (2) project flood....0.01945 $m^3$/sec (rapidly) 2. Design Experiment It were sighted the water level for the nine point (L. & R. sides of No. O, L. & R. of No.1, L. side of NO.2, NO.3, No. 4 and NO.5), but it appeared each other that the lowest water level was 0.63 m at spillway (No.5) and the highest water level 0.735m less than planning water level O.75 m at No. 0. It was regarded as the phenomena appearing the difference from the calculation of the rational formular and coefficient of discharge. 3. Experiment examine E. ${\circled1}$ As a table (2) it had not a difference in comparision with design and was some lower value than design experiment's. E ..${\circled2}$) !twas same table (3) in a consequence of Experiment contracted Rocky cutting. E.${\circled3}$. ${\circled4}$ It was done amend.ment Experiment by elevating G.H. in only control point, but was not sure result as a table (2)(3)(4), and so it was changed largely in ${\circled5}$ Experiment. E. ${\circled5}$ Increasing water level was understanded to be proportion to $V^2$ in consideration of centrifugal force in the curve part and showed velocity contracting in curve the effect order's being regular in consequence of 1/6 sloped extending G.H. attached from 5 No. 0 to 1. 50 m, to S No. 0+5m. (S; discharge channel number).

  • PDF

ESTIMATION OF DAM DISCHARGE FOR THE DOWN STREAM WATER QUALITY

  • Ha, Jin-Kyu;Hong, Il-Pyo
    • Water for future
    • /
    • v.35 no.5
    • /
    • pp.51-59
    • /
    • 2002
  • In recent years the human impact on the environment becomes increasing lift threatening, calls for the better management of resources. In field of water quality of river flow, the best way to conserve water quality is specific efforts to control the pollutant loadings and treat the loadings in the basin to reduce the discharge of pollutant loadings to river. But in general the water quality influenced by the dam discharge. Especially in dry season, it is more dominant way to improve the water quality which contaminated with the pollutant loadings from the basin. The dam discharge amounts of the 2 dams in the Keum River that maintain the down stream water quality were estimated for the year of 1999, 2001, 2006, 2011, in case of irrigation and non-irrigation seasons. The pollutant loadings for the basin are estimated with the planning of treatment plants construction schedule for every sub-basins. The river flow rates were considered low flow as 2.33 year low flow and 10 year low flow. The QUAL2E model was used as a tool of simulation.

  • PDF

Discharge Estimation Using Non-dimensional Velocity Distribution and Index-Velocity Method in Natural Rivers (자연하천에서 무차원 유속분포-지표유속법을 이용한 유량산정)

  • Kim, Chang-Wan;Lee, Min-Ho;Jung, Sung-Won;Yoo, Dong-Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.855-859
    • /
    • 2007
  • It is essential to obtain accurate and highly reliable streamflow data for water resources planning, evaluation and management as well as design of hydraulic structures. A new discharge estimation method, which is named 'non-dimensional velocity distribution and index-velocity method,' was proposed in this research. This method showed very close channel discharges which were calculated with the exiting velocity-area method. When velocity-area method is used to estimate channel discharge, it is required to observe point velocities at every desired point and vertical using a current meter like Price-AA. However 'non-dimensional velocity distribution and index-velocity method' is used, it become optional to observe point velocities at every desired point and vertical. But this method can not be applied for the cases of very complex and strongly asymmetric channel cross-sections because non-dimensional velocity distribution by entropy concept may be quite biased from that of natural rivers.

  • PDF

Development of dam inflow simulation technique coupled with rainfall simulation and rainfall-runoff model (강우모의기법과 강우-유출 모형을 연계한 댐 유입량 자료 생성기법 개발)

  • Kim, Tae-Jeong;So, Byung-Jin;Ryou, Min-Suk;Kwon, Hyun-Han
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.4
    • /
    • pp.315-325
    • /
    • 2016
  • Generally, a natural river discharge is highly regulated by the hydraulic structures, and the regulated flow is substantially different from natural inflow characteristics for the use of water resources planning. The natural inflow data are necessarily required for hydrologic analysis and water resources planning. This study aimed to develop an integrated model for more reliable simulation of daily dam inflow. First, a piecewise Kernel-Pareto distribution was used for rainfall simulation model, which can more effectively reproduce the low order moments (e.g. mean and median) as well as the extremes. Second, a Bayesian Markov Chain Monte Carlo scheme was applied for the SAC-SMA rainfall-runoff model that is able to quantitatively assess uncertainties associated with model parameters. It was confirmed that the proposed modeling scheme is capable of reproducing the underlying statistical properties of discharge, and can be further used to provide a set of plausible scenarios for water budget analysis in water resources planning.

Discharge Assessment Tool in Stroke and Elderly Patients: A Systematic Review (뇌졸중 및 노인 환자의 퇴원 평가도구에 대한 체계적 고찰)

  • Hwang, Na-Kyoung;Yoo, Eun-Young
    • Therapeutic Science for Rehabilitation
    • /
    • v.9 no.3
    • /
    • pp.7-21
    • /
    • 2020
  • Objective : The aim of this systematic review is to analyze the assessment items and tools used for the discharge of stroke and elderly patients and to help select appropriate assessment tools for discharge planning. Methods : The studies included in this review were collected from the PubMed, Medline Complete (EBSCOhost), and Scopus databases from January 2009 to December 2018. A total 22 studies were selected. The research types, the areas and sub-areas of assessment, as well as the assessment tools according to the areas were analyzed. Results : Descriptive research (59.2%) was the most frequent type of research. The 12 main areas of assessment were medical condition, activities of daily living, swallowing function, sensation, mobility, cognition and perception, communication, emotion, home environment, patient knowledge and readiness for discharge, social support, and well-being. Among the assessment tools, the most frequently used tools were Bathel Index; Functional Independence Measure, to assess activities of daily living; Short-Form Health Survey, to assess well-being, and Timed Up and Go test, to assess mobility. Conclusion : This study will help select the assessment areas and tools to be considered at discharge of stroke patients and serve a basis for the development of comprehensive assessment tools for discharge planning.

Utility of Korean Modified Barthel Index (K-MBI) to Predict the Length of Hospital Stay and the Discharge Destinations in People With Stroke (뇌졸중환자에서 재원기간과 퇴원장소 예측을 위한 K-MBI의 유용성)

  • Noh, Dong-Koog;Kim, Kyung-Ho;Kang, Dae-Hee;Lee, Ji-Sun;Nam, Kyung-Wan;Shin, Hyung-Ik
    • Physical Therapy Korea
    • /
    • v.14 no.3
    • /
    • pp.81-89
    • /
    • 2007
  • The purpose of this study was to utilize the K-MBI (Korean Modified Barthel Index) and subscales of K-MBI in predicting the length of hospital stay (LOS) and the discharge destinations for stroke patients. The study population consisted of 97 stroke patients (57 men and 40 women) admitted to the Seoul National University at the Bundang Hospital. All participants were assessed by K-MBI at admission and discharge after rehabilitation therapy and the information available was investigated at admission. The data were analyzed by using the Mann-Whitney U test, the stepwise multiple regression and the logistic regression. The median LOS was 30 days (mean, 32.8 days; range, 22 to 43 days). The K-MBI score at initiation of rehabilitation therapy (p<.001), the type of stroke and living habits before a stroke were the main explanatory indicators for LOS (p<.05). Within the parameters of K-MBI measured at initiation for rehabilitation, feeding and chair/bed transfer were the explanatory factors for LOS prediction (p<.01). Confidence in the prediction of LOS was 20%. Significant predictors of discharge destination in a logistic regression model were the discharge K-MBI score, sex and hemiplegic side. Dressing in items of discharge K-MBI was the significant predictor of discharge destination. The K-MBI score was the most important factor to predict LOS and discharge destination. Knowledge of these predictors can contribute to more appropriate treatment and discharge planning.

  • PDF

A Systematic Review on Nurse-Led Transitional Care Programs for Discharged Patients from Hospital to Home (퇴원환자를 위한 간호사 주도 전환 프로그램의 내용과 효과에 관한 체계적 문헌고찰)

  • Lee, Hyun Joo;Kim, Yukyung;Oh, Eui Geum
    • Journal of Korean Clinical Nursing Research
    • /
    • v.23 no.3
    • /
    • pp.376-387
    • /
    • 2017
  • Purpose: This study was to systematically review the contents and effects of nurse-led transitional care programs for discharged patients from hospital to home. Methods: Randomized controlled trials published between 2005 and 2015 were searched in Pubmed, Embase, Cochrane(Central Register of Controlled Trials) and CINAHL. Data were analyzed using Cochrane Review Manager(Revman) software 5.3. Results: Nine studies were selected and analyzed. Patient assessment, education and discharge planning were included in pre-discharge phase. Referring, communication and care planning were performed by nurses in transition phase. Home and phone visits, monitoring and multidisciplinary advices were included in post-discharge phase. Various outcome measures such as hospital utilization(30 days readmission and emergency department visit), quality of life, and cost were used to identify effectiveness of nurse-led transitional care programs. 30 days readmission(OR=.73, 95% CI 0.54, 0.98; p=.03) and emergency department visit(OR=.67, 95% CI 0.50, 0.88; p=.005) were statistically significant in meta-analysis. However, participant blinding was not done in seven studies which put at the risk of performance bias. Conclusion: The results indicated that nurse-led transitional care program is effective in reducing unnecessary hospital utilization. Nevertheless, small sample size and risk at performance bias are the limitation of this study. Thus, we suggest that well-designed randomized controlled trials need to be conducted.

Yard Planning Considering the Load Profile of Resources in Container Terminals (컨테이너 터미널의 자원 부하를 고려한 최적 장치계획 모형)

  • Won, Seung-Hwan;Kim, Kap-Hwan
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.1
    • /
    • pp.58-72
    • /
    • 2009
  • The main activities of container terminals are to load container freights to vessels, discharge them from vessels, and store them in the storage yard. Container terminals make many operational plans to execute these functions effectively. If the plans do not consider enough the loads of related resources, they may have low actualities. This study discusses the optimal yard planning model which considers various resources, such as the storage yard, yard cranes, internal vehicles, and travel lanes, in container terminals. The model determines the groups and amounts of containers which are stored in each storage block by using the resource profile. The yard planning problem is represented to the multi-commodity minimal cost flow problem and is formulated to the linear programming model. In order to explain the application of the mathematical model, the numerical examples are presented. Additionally, the relationship between the average load ratio and the relocation ratio is discussed.