Oh, Sang-Ho;Lee, Kwang Soo;Lee, Dal Soo;Jang, Se-Chul
한국신재생에너지학회:학술대회논문집
/
2011.11a
/
pp.160.1-160.1
/
2011
In this study, the influence of methodology of assessing water levels on the discharge coefficient of sluice for tidal power generation was investigated. A physical experiment was performed in a planar open channel by installing 1/70 scale model of the sluice caisson in the planar open channel. In front of and behind the sluice model, sloping bathymetry was made to reproduce corresponding field condition. By analyzing the experimental results, it was found that the location of measuring water levels significantly affects the estimates of the discharge coefficient, due to the variability of the parameter according to the head difference between the measuring locations. Therefore, it is necessary to be careful in estimating and utilizing the discharge coefficient in the relevant study of a tidal power generation.
Proceedings of the Korean Geotechical Society Conference
/
2008.03a
/
pp.293-299
/
2008
If a conventional type of Plastic Board Drain (PBD) is installed to the deep clay deposit, it is subjected to a high lateral earth pressure. a flow channel of PBD may be reduced by the collapse of cores and clogged by the intrusion of filter into the space between cores which are made by lateral pressure. It could decrease the ability of initial discharge capacity and the reliability of long term discharge capacity. A cylindrical plastic board drain (C-PBD) considered in this study consists of cylindrical core and several supports so that it can prevent the reduction of area of flow channel from the higher lateral earth pressure effectively. The discharge capacity of C-PBD was compared to that of a conventional PBD through performing experiments using the composite discharge capacity apparatus which can consider in-situ condition such as penetration of drains, ground settlement and discharge capacity. As a result, C-PBD showed much better performance than PBD in the ability of discharge. It was observed that the C-PBD was folded whereas the conventional PBD was folded after the experiment.
This study was developed through the secondary battery module charging/discharger possible utilization in the production process equipment circuit. The developed module is ensuring construction of efficient and productive charging and discharger through this research a limit on the yield and the price of existing single -channel charge and discharger circuit as a 5V 70A grade secondary battery Formation charge and discharger for up to 1 board 4 channels. In order to improve the sensing accuracy, through a robust differential amplifier circuit described using 16bit Analog-Digital Converter and noise was secured 16bit resolution sensing. The configuration also made demands for property Rise / Fall Time. Data Acquisition, discharge efficiency and also to fit the sink circuit temperature level for mass production.
Flume experiments are conducted to describe channel adjustments at stream confluences and to examine some factors to which changes in channel characteristics are subject. There are different factors controlling channel size and shape; shereas the fomer is primarily controlled by water discharge alone, the latter including channel slope is influenced by sediment load as well as water discharge. The morphometric adjustments of confluent tributaries can be consequently classified into three types based upon changes in sediment concentration which are associated with the relative increasing rates of water discharge and sediment load at these sites. Flow is accelerated at stream confluences due to the convergence of confluent flows, causing an sharp increase in velocity. It restrains an increase in channel capacity, and furthers a decrease in channel slope, of a receiving stream. As a result, effects of slight increases in sediment concentration hardly appear on changes in channel characterisitics at stream confluences.
Proton exchange membrane fuel cell performance is changed by the complicated physical phenomenon. In this study, water discharge performance of proton exchange membrane fuel cell were performed numerically to compare serpentine channel flow fields of 5-pass 4-turn serpentine and 25 $cm^2$ reaction surface between with and without sub-channel at the rib. Through the supplement of sub channel flow field, it is shown from the results that water removal characteristic inside channel improves because the flow direction of under-rib convection is changed into the sub channel. Reacting gases supplied from entrance disperse into sub channel flow field and electrochemical reaction occurs uniformly over the reaction surface. The results obtained that total current density distributions become uniform because residence time of reacting gases traveling to sub-channel flow field is longer than to main channel.
Magazine of the Korean Society of Agricultural Engineers
/
v.14
no.3
/
pp.2716-2725
/
1972
Side channel spillways based on Hinds theory were tested. Surface water level at the beginning point of side channel is the same as the crest level of weir in the usual design. Here, side channel section were moved upwards $\frac{1}{2}$ of the total head on the crest and test(revised experiment) were made. In the revised experiments, coefficients of discharge for design flood (Q) were the same with that of original design experiments. In case of 1.2Q a little influence of submergence were appeared, coefficients of discharge were decreased to be about 97.6% of that of original design experiments, therefore, Reservoir flood water level become higher about 2-3cm than original case. So revised design can be used for actual purpose and it will brings much savings in construction cost of side channel spillway.
Journal of the Korean Society of Hazard Mitigation
/
v.8
no.5
/
pp.137-145
/
2008
In this study, to reduce the flood damage caused by flood discharge exceeding project flood, the primary technology was applied to determining the optimal location and size for underground sluiceway. The Jungrang Stream was selected for this study because the stream was overflowed and the embankment section of the stream was destroyed owing to localized torrential rainfall in 1998 and 2001. Considering 200-year frequency storm, the inlets of the underground discharge channel were located at Seoul City limits, the confluence of Danghyun Stream, Wolgye 1-gyo, and the confluence of Mukdong Stream. The outlets were located at the estuary of Jungrang Stream and rightbank of Banpo Bridge in Han River. The transverse discharge according to the variation of overflow depth at the inlet of underground discharge channel was estimated and the effect of inundation reduction was analyzed. To examine the appropriate scale of the underground discharge channel, the 8 operation methods for the management of outlet discharge were compared considering four rules (only storage, the constant discharge rate, the constant discharge volume, and the mixture of the constant discharge rate and discharge volume). As a result, the effect of inundation reduction was most significantly improved when the inlet was located at the confluence of Danghyun Stream. The appropriate size of underground sluiceway for 200-year frequency storm was studied, and as a result, the appropriate diameters of the underground discharge channel were 12 m in case of only storage(Rule D), 9m in 50% of discharge(Rule E), 8 m in constant discharge volume(Rule F), and 7 m in mixture method(Rule G). This investigation process can be applied to design the underground discharge channel when the inundation damage is significant in coastal area due to embankment overflow. The underground discharge channel in Jungrang Stream can also be used as an underground road to link Seoul City to Uijeongbu City during dry season.
This study is runoff analysis of the recently urbanized San Bon basin. The relationships between peak discharge and total discharge were examined by applying the ILLUDAS runoff analysis model to the measured data. In urbanized streams, it is found that channel adjustment had the most significant effect on the increase of peak discharge. Significant increases in the peak discharge occurred as rainfall duration or return period increases 10% and 7~16% increases in peak discharge were observed when the roughness coefficient were 0.04 and 0.015, respectively. When the natural river channel with n=0.04 was converted into a sewerage system of n=0.015 the peak discharge was greatly increased by 51~158%, Generally, flood peak discharge was increased during heavy rain, but in the case of urbanized basin, river stage was reduced owing to an increase of flow velocity by the adjustment of drainage system.
In this study, the effects of upstream Froude number ($Fr_1$), weir height (h), weir length (L), weir width (W) and main channel width (B) on the discharge coefficient of broad crested side-weirs in a relatively wide rectangular open channel were investigated experimentally. Furthermore the relationship between discharge coefficients of sharp crested side weir and broad crested side weir was studied using the concept of De Marchi discharge coefficient. The effect of $Fr_1$ on the relationship between discharge coefficients of sharp crested side weir and broad crested side weir is decreased in wide open channel and the relative importance of other influential parameters like h/$y_1$, L/B, and W/($y_1-h$) are increased. New estimated equations for the discharge coefficients of broad crested side weir are suggested from regression analysis with the experiment data sets.
Journal of Korean Society of Environmental Engineers
/
v.30
no.5
/
pp.567-573
/
2008
Water quality in the longitudinal and cross section was measured and analyzed at Dal stream. The change of water quality was compared with the change of discharge at the important points. When discharge was increased by rainfall, the concentration of BOD was decreased and the concentrations of TN and TP were increased. The correlation coefficient of BOD, TN, TP showed large with the water velocity and depth in the Case 2 that discharge was increased. Rainfall had much influenced in water quality because of moving the nonpoint source to the channel. Water velocity was analyzed by numerical model(Surface water Modeling System). Velocity was comparatively fast in the upstream that had a steep slope and narrow channel. The characteristics of pollution transfer was simulated in 2-dimensional channel, the pollution diffused rapidly to the center of flow in the main channel. Flow had much influenced in diffusion of pollution.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.