• 제목/요약/키워드: Dipole-dipole resistivity survey

검색결과 78건 처리시간 0.024초

물리탐사자료를 이용한 수리지질구조 해석 -충청북도 청원지역 (An Interpretation of Hydrogeologic Structure Using Geophysical Data from Chungwon Area, Chungcheongbuk-Do)

  • 송성호;정형재;권병두
    • 자원환경지질
    • /
    • 제33권4호
    • /
    • pp.283-293
    • /
    • 2000
  • A set of geophysical survey results over an area in Bookil-myun, Chungwon-Gun, Chungcheongbuk-Do is presented; resistivity logging, d.c. sounding, dipole-dipole resistivity, and controlled-source magnetotelluric (CSMT) surveys. These surveys were chosen in this research for the estimation of the basement depth and the delineation of the hydrogeologic structure over the survey area. The results provide an optimal input to a hydrogeologic modeling analysis using the strategies built in GIS software. A total of 14 lines of dipole-dipole resistivity surveys, 25 stations of d.c. sounding and 6 stations of CSMT sounding were performed. In addition 10 boreholes were chosen for resistivity logging to correlate the logs to the surface data. A quantitative information on the hydrogeologic structure over the area is provided by synthesizing the results from various geophysical data and attribute layers are constructed by utilizing a GIS software Arc/ Info. The constructed layers match well to the hydrogeologic structures, which were outlined from the drilling data. The methodology tested and adopted in this study would be useful for providing a more reliable input to the hydrogeologic model setup.

  • PDF

2차원 전기비저항 탐사에 사용되는 ROLL-ALONG 기법에 대한 고찰 (A STUDY ON THE ROLL-ALONG TECHNIQUE USED IN 2D ELECTRICAL RESISTIVITY SURVEYS)

  • 한원석;윤종렬
    • 지구물리
    • /
    • 제6권3호
    • /
    • pp.155-164
    • /
    • 2003
  • 차원 전기비저항 탐사자료의 획득에 널리 사용되는 roll-along 기법의 타당성과 효율성을 현재 통용되고 있는 쌍극자-쌍극자 배열법(dipole-dipole array) 과 베너 슐럼버저 (Wenner-Schlumberger array)배열법 의 경우에 대하여 수치 모델링을 통해 분석하였다 천부 정보를 상대적으로 많이 포함하고 있는 가단면도 상부에 위치한 자료들은 기법에 의한 자료의 누락이 없으므로 천부의 전기비저항 이상대는 두 배열법에서 모두 성공적으로 영상화되었다 그러나 비교적 심부에 위치한 이상대는 roll-along기법으로 야기되는 자료의 누락으로 인해 왜곡된 형태로 나타날 수 있으며 이 현상은 자료획득의 수평 범위가 상대적으로 빈약한 베너 슐럼버저 배열법에서 더 크게 나타나는 것으로 확인되었다 또한 실제 탐사에서 쌍극자 쌍극자 배열법은 S/N비가 낮아 유한한 전극 개수로 구현할 수 있는 최대전극전개계수($n_max$) 까지 전극을 전개할 수 없는 경우가 많은 이유로 roll-along기법으로 인한 자료의 누락이 적게 나타나지만 베너 슐럼버저 배열법의 경우에는 S/N비가 높아 ($n_max$)까지 전극을 전개하게 되어 자 료의 누락이 커지므로 역산 단면의 왜곡이 야기될 수 있는 것으로 분석되었다 따라서 동일한 기본전극간격 ($a$)과($n$)을 사용하였을 때 쌍극자 쌍극자 배열법보다 깊은 median depth(Edwards, 1977)를 제공하는 베너 슐럼버저 배열 법의 경우 roll-along기법에 의한 자료의 왜곡을 줄이고 효율적인 현장 작업을 위하여 ($n_max$)보다는 자료의 누락이 무시될 수 있는 ($n_prob$)을 기준으로 가탐심도에 적합한 를 결정한 후 측선 중첩구간이 전체 측선 길이의 3/4이 되도록 전극을 전진 배치하는 전극배열 방식이 추천되며 이는 수치 모델링을 통해 확인되었다.

  • PDF

전기비저항 탐사를 이용한 노은매립장 침출수 분포에 관한 연구 (A Study on Electrical Resistivity Geophysical Surveys of the Noen Landfill Site)

  • 김준경;홍상표;김광렬;조용진
    • 환경영향평가
    • /
    • 제13권5호
    • /
    • pp.223-230
    • /
    • 2004
  • The electrical resistivity prospecting method with dipole-dipole array were applied in order to survey 3-D structure characteristics of the Noen landfill site. For the electrical resistivity prospecting, 3 line of measurements were established parallel to the main boundary of the Noen landfill site and additional 2 lines were also established perpendicular to the existing 3 lines for the effective investigation of the landfill site. The results showed that the uppermost layer of the landfill site is believed to be stabilized generally based on the characteristics of electrical resistivity distribution. Lowest layer was partially polluted by the leachate.

전기비저항 탐사법을 이용한 지하 천부 파쇄대 조사 (Dipole-Dipole Array Geoelectric Survey for Gracture Zone Detection)

  • 김건영;이정모;장태우
    • 지구물리
    • /
    • 제2권3호
    • /
    • pp.217-224
    • /
    • 1999
  • 단층은 지질조사에 의하여 쉽게 발견될 수 있지만, 그 연장선은 지표에서 잘 발견되지 않기 때문에 전통적인 지질조사 방법에 의해 쉽게 파악하기가 어렵다. 단층 및 파쇄대의 경우 점토광물 및 지하수가 많이 함유되어 있어 주위보다 상대적으로 전기비저항이 낮게 나타나므로, 지표에서 발견되지 않는 단층 및 파쇄대 조사에 전기비저항 탐사가 효율적이다. 동래단층에 인접한 경상남도 양산시 웅상읍 용당리 지역과, 울산단층에 인접하고 또 근처 산 사면에서 아직 논란의 대상이 되는 제 4기 단층이 보고된 경상북도 경주시 외동읍 말방리 지역 두 곳에서 2차원적인 지하구조를 알 수 있는 쌍극자 배열 전기비저항 탐사를 실시하였고, 분석해를 이용하여 그 신뢰도를 검토한 역산 프로그램을 이용하여 전기비저항 단면도를 구하였다. 역산 결과 용당리 지역에서는 하나의 저비저항대(low resistivity zone)를, 말방리 지역에서는 2개의 저비저항대를 발견할 수 있었으며, 이들은 거의 수직에 가까운 선상으로 발달하며 그 폭은 15∼20 m 정도로 나타났다. 이들 저비저항대(<100 Ωm)는 그 주변지역에 비해 상대적으로 매우 낮은 비저항을 보이므로 이는 단층작용에 의해 생성된 파쇄대에 의한 경과로 사료된다. 최종 판단은 시추나 트렌치에 의하여 이루어지겠지만 주위에 평행한 전기비저항 탐사 측선들을 추가하여 3차원적 해석을 시도하거나 다른 물리탐사 방법을 추가함으로 해석결과에 대한 신뢰도를 ?상시킬 수 있다.

  • PDF

2차원 전기비저항 탐사를 위한 변형된 전극배열법에 관한 연구 (A Study on the Modified Electrode Arrays in Two-Dimensional Resistivity Survey)

  • 김정호;이명종;송윤호;정승환
    • 지구물리와물리탐사
    • /
    • 제4권3호
    • /
    • pp.59-69
    • /
    • 2001
  • 2차원 전기비저항 탐사에 일반적으로 사용되는 전극배열들의 단점을 보완하기 위해 단극과 쌍극자를 사용하는 기존의 전극배열로부터 5 종류의 변형된 전극배열법을 제안하였다. 변형된 단극 배열법은 원거리 접지전극이 필요한 단극 배열법의 비효율성을 보완하기 위한 전극배열법이다. 4 종류의 쌍극자를 이용하는 변형된 전극배열법은 쌍극자 또는 단극-쌍극자 배열이 갖는 문제점, 즉 낮은 측정값에 의한 낮은 신호대 잡음비를 개선하여 높은 측정값의 획득이 가능하도록 설계하였다. 수치 모델링과 2차원 역산을 이용한 수치 실험을 수행하였으며, 전기적 잡음에 의한 영향과 분해능에 대하여 고찰하여 본 논문에서 제안된 전극배열의 효용성을 입증하였다.

  • PDF

홍성 단층대에서의 전기, 전자 탐사 연구 (Electric and Electromagnetic Surveys of the Hongseong Fault Zone)

  • 권병두;이희순;박계순;오석훈;이춘기
    • 한국지구과학회지
    • /
    • 제24권4호
    • /
    • pp.361-368
    • /
    • 2003
  • 1978년에 규모 5.0의 지진이 발생한 홍성지역에 발달한 단층대의 전기, 전자적 특성을 조사하였다. 전기, 전자 탐사는 최근 토목공사현장에서 단층대 및 파쇄대 등의 연약지반을 확인하기 위한 수단으로 널리 쓰이고 있으며 이들 탐사로부터 얻어지는 전기비저항 구조는 연약대의 공간적 분포를 효과적으로 파악할 수 있는 정보를 제공한다. 홍성지역에 위치한 단층대를 가로질러 쌍극자배열 전기비저항탐사와 MT (Magnetotelluric) 탐사를 실시하였으며 역산을 통해 단층대의 전기비저항의 분포를 추정하였다. MT 탐사는 주단층대를 가로지르는 2.9 km의 측선상의 18측점에서 실시하였으며, 자기쌍극자를 인공 송신원으로 사용하였다 전기탐사는 단층대를 측선의 중앙으로 하여 전극간격이 50 m인 쌍극자배열전기비저항 탐사를 실시하였다. 두 탐사 결과는 예상단층선을 따라 좌우지역의 전기비저항이 서로 다른 양상으로 발달하고 있음을 보여주고 있으며, 특히 예상단층선을 따라서는 뚜렷한 저비저항대가 깊게 발달해 있음을 보여주고 있다. 홍성지역의 단층대에서 낮은 전기비저항분포를 보이는 부분이 수직으로 잘 발달해 있다는 것은 최근에 두 차례의 지진이 발생한 것처럼 이 지역 단층이 활동 중인 단층이라는 사실과 일치하는 결과를 보여주는 것이다. 본 연구 성과는 앞으로 홍성단층 뿐만이 아니라 우리나라에서 발생하는 지진들에 대한 연구에 기초 자료를 제공할 것이라 기대된다.

전기비저항 탐사시 지하매설물에 의한 간섭효과 연구 (Interference effect by underground utilities at electric resistivity Survey)

  • 김재홍;오병현;임은상;이종욱
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.961-965
    • /
    • 2009
  • Using much electric resistivity survey to design or preservation administration of facilities. However, By survey method that electric resistivity survey grasps special quality in base by potential difference creating artificial current in underground, Is influenced in electric resistance propensitys of various underground utilities in base. This Study selects dam 1 place that could grasp well underground situation and studied electricity interference effect by effect of underground utilities. Grasp underground utilities of dam interior, and control and observed accuracy with survey wave because various pole space. Through this Study, wish to present survey method of electric resistivity survey at design or survey of preservation administration dimension after with drawn result.

  • PDF

시험탐사 결과에 따른 전기비저항 탐사 분석 (Resistivity Protecting analysis due to test survey result)

  • 김재홍;홍원표;박철숙;임은상
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.1285-1289
    • /
    • 2008
  • Increasing the flood control capacity's link that is enforcing to existing dam by unusual change of weather, While build planing construction by exiting spillway of tunnel type to dam, could know that part bed rock is formed as is different with design. Grasped topography of research area and geology state to definite distribution aspect of different bed rock, Place that achieved Surface geological Survey and correct Survey is difficult in some section enforced Electrical resistivity dipole-dipole investigation. Grasped stratigraphy distribution confirmation and fracture or weathering zone making out siding 2D-Resistivity Electrical resistivity diagram and Reverse analysis diagram, examining closely soil weathered rock rock's distribution state, established stability countermeasure plan

  • PDF

쉴드 TBM터널 상부 지반 연약대 전기탐사 (Electrical Resistivity Imaging for Upper Layer of Shield TBM Tunnel Ceiling)

  • 정현기;박철환
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.401-408
    • /
    • 2005
  • Recently shield TBM tunnellings are being applied to subway construction in Korean cities. Generally these kinds of tunnellings have the problems in the stability of ground such as subsidence because urban subway is constructed in the shallow depth. A sinkhole occurred on the road just above the tunnel during tunneling in Kwangju, so a survey for upper layer of the tunnel was needed. But conventional Ground Probing Radar can't be applicable due to the presence of steel-mesh screen in the shield segment, so no existent geophysical method is applicable in this site. Because the outer surface of each shield segment is electrically insulated, dipole-dipole resistivity method which is popular in engineering site investigation, was tried to this survey for the first time. Specially manufactured flexible ring-type electrodes were installed into the grouting holes at an interval of 2.4 m on the ceiling. The K-Ohm II system which has been developed by KIGAM and tested successfully in many sites, was used in this site. The system consists of 1000Volt-1Ampere constant-current transmitter, optically isolated 24 bit sigma-delta A/D conversion receiver - maximum 12 channel simultaneous measurements, and graphical automatic acquisition software for easy data quality check in real time. Borehole camera logging with circular white LED lighting was also done to investigate the state of the layer. Measured resistivity data lack of some stations due to failing opening lids of holes, shows general high-low trend well. The dipole-dipole resistivity inversion results discriminate (1) one approximately 4 meter diameter cavity (grouted but incompletely hardened, so low resistivity - less than $30{\Omega}m$), (2) weak zone (100-200${\Omega}m$), and (3) hard zone (high resistivity - more than 1000${\Omega}m$) very well for the distance of 320 meters. The 2-D inversion neglects slight absolute 3-D effect, but we can get satisfactory and useful information. Acquired resistivity section and video tapes by borehole camera logging will be reserved and reused if some problem occurs in this site in the future.

  • PDF

난지도에 인접한 한강변에서의 쌍극자-쌍극자 전기탐사 (Dipole-Dipole Resistivity Survey on the Side of Han River near Nanjido Landfill)

  • 이기화;권병두;오석훈;김차섭
    • 자원환경지질
    • /
    • 제29권3호
    • /
    • pp.335-343
    • /
    • 1996
  • The dipole-dipol electrical resistivity survey was conducted to investigate the probable contamination of the Han river by leachate from the near-by Nanjido Landfill. The survey line of 3 km was set along the unpaved road toward the Han river. For the convenience of the field work, the survey line was divided into four segments. The complete two-dimensional resistivity section was constructed by connecting the inversion result of each segment. Gravity survey was also carried out along the profile parallel to the resistivity line. Near surface resistivity generally appeared to be of very low value in most part of the survey area and the boundary between the alluvium layer and underlying basement rocks is well discriminated on the resistivity section. These results agree well with those of the preceding Schlumberger depth sounding made at adjacent area by Lee and fun (1995). The variation of thickness of the alluvium layer delineated by gravity anomaly profile also correlates well with the result of the resistivity survey on the qualitative basis. The problem of contamination by leachate from the Nanjido Landfill, where various waste materials have been dumped without any proper treatment facilities, has been remains unsolved yet. Therefore, we present the most probable passages of leachate flow based on the survey results and have briefly discussed about measure for contamination control. Considering the thickness of alluvium and the possible existence of fractured zone, the middle point between 1st and 2nd landfill and the midst of 1st landfill are the most hazardous regions to make leachates flow into the Han river. Since large amounts of leachates are observed from the test wells located on the lines extending from the border between the 1st and 2nd landfill and the middle of the lst landfill, contamination protection barriers are strongly recommended near these regions.

  • PDF