• Title/Summary/Keyword: Digital Construction

Search Result 1,518, Processing Time 0.03 seconds

A Study on the Construction of Knowledge-based Digital Library Model in Korea University Library (지식기반 전자도서관 모형구축에 관한 연구 - 대학도서관을 중심으로 -)

  • Lee, Eung-Bong;Lu, Bum-Jong
    • Journal of the Korean Society for Library and Information Science
    • /
    • v.34 no.4
    • /
    • pp.49-67
    • /
    • 2000
  • The purpose of this study is to suggest knowledge-based digital library model that is applicable in korea university library. This paper provides brief accounts of research and development trends of digital library in referring some major digital library projects that are in progress, or just completed. There follows a suggestion of eight essential modules for knowledge-based digital library system, that are infrastructure development of dissertation presentation and database construction, management and service of collections, infrastructure construction of journal service, development of unified viewer, database conversion, distributed & integrated retrieval system, cyber campus(private work space), and database connection.

  • PDF

A Relation between Financing Conditions and Business Operation of a Construction Company (자금조달환경과 건설업체 경영상태 간의 관계성 분석 연구)

  • Seo, Jeong-Bum;Lee, Sang-Hyo;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.1
    • /
    • pp.61-70
    • /
    • 2012
  • A construction project is very costly and takes a long time to make investment and yield profit. For this reason, financial institutions are cautious about financing construction projects. Meanwhile, a construction company needs financing from financial institutions to cover a large expense of a construction project. Thus, there is likely to be a close correlation between financing conditions and business operation of a construction company. To examine the relationship, variables were identified that are related to insolvency of a construction company and changes in financing conditions. The analysis period is between the second quarter of 2001 and the fourth quarter of 2010. Data was retrieved from TS2000 established by Korea Listed Companies Association (KLCA), Statistics Office, and Construction Economy Research Institute of Korea (CERIK). In terms of methodology, VECM (Vector Error Correction Model) was used to analyze dynamic relationship between changes in financing conditions and insolvency of a construction company based on the identified variables. The hypothesis was that changes in financing conditions would significantly affect business of a construction company, but, the analysis did not find a close relation between the two factors. However, it was shown that poor business of a construction company affects financing conditions adversely.

BIM-based Design Automation Tool and Digital Twin Interoperability - Case of the Next Generation Noise Barrier Tunnel - (BIM 기반 설계 자동화 도구와 디지털 트윈의 상호운용성 - 차세대 방음터널의 사례를 중심으로 -)

  • Yang, Seung-Won;Kim, Seong-Jun;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.11 no.4
    • /
    • pp.31-41
    • /
    • 2021
  • Digital twins between "BIM Digital Model-Physical Prototype Model" will be built for Noise Barrier tunnel(NBT) that meet the definition of N.G smart city facilities derived from previous studies to build a data flow that connects data at each stage of design, construction, and operation. In this process, BIM design automation tools are created and utilized, and consistent transmission of member and attribute data is performed by converting them into IFC format. Through this, the purpose is to improve the labor-intensive environment required from the design stage of the NBT and to consistently maintain the information required for subsequent production and construction. This includes achieving changes in the construction industry based on digital transformation by unifying various data formats used differently for each industry from design to operation. In addition, it demonstrates that information exchange in the maintenance and management stages is possible based on the data exchange of the established digital twin and aims to improve the existing labor-intensive environment and expand operability between digital and physical information. As suggested in previous studies, the implementation of digital twins in these N.G smart city facilities includes the possibility of building an environment that adds to the possibility of high value-added product platforms as well as the function of big data platforms targeting existing smart cities.

Accuracy Analysis of Earthwork Volume Estimating for Photogrammetry, TLS, MMS (토공사 계측 방식(Photogrammetry, TLS, MMS)별 토공량 산정 정밀도 분석)

  • Park, Jae-Woo;Yeom, Dong-Jun;Kang, Tai-Kyung
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.4_2
    • /
    • pp.453-465
    • /
    • 2021
  • Recently, photogrammetry, TLS(Terrestrial Laser Scanner), MMS(Mobile Mapping System)-based techniques have been applied to estimate earthwork volume for construction management. The primary objective of this study is to analyze the accuracy of earthwork volume estimating between photogrammetry and TLS, MMS that improves the traditional surveying method in convenience, estimating accuracy. For this, the following research works are conducted sequentially; 1) literature review, 2) core algorithm analysis, 3) surveying data acquisition using photogrammetry, TLS, MMS, 4) estimated earthwork volume comparison according to surveying method. As a result of the experiment, it was analyzed that there were earthwork volume errors of 1,207.5m3 (14.03%) of UAV-based digital map, 391.5m3(4.55%) of UAV, TLS integrated digital map, and 294.9m3(3.43%) of UAV, MMS integrated digital map. It is expected that the result of this study will be enormous due to the availability of the analyzed data.

Case study in application of DVR system for field data collection and analysis (DVR(Digital Video Recorder)을 활용한 현장정보 수집 및 분석에 관한 사례연구)

  • Shin Bong-Soo;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.486-489
    • /
    • 2002
  • Construction management has been a target of the result and the index which were decided by whether the resourecs(time, cost and progress...etc) were used. but this has been serious problems in time and cost because of the shortage of storage space, the incident, lowering of efficiency for works, working impossible of between work categories and the demage of finished products. Therefore I noticed that more correct and more objective establish of data collecting system was necessary. it was through the diversification of information for exchange and communication between the construction site and participants. DVR(Digital Video Recorder) and internet technology were suggested for a solution to this problem. the collected information by DVR was divided to 3 steps as how long it used and how much it processed for improving efficiency of using and storage of information. and then it was verified through applying to cases at construction site.

  • PDF

A Proposal of a Shape Matching and Geo-referencing method for Building Features in Construction CAD Data to Digital Map using a Vertex Attributed String Matching algorithm (VASM 알고리즘을 이용한 건축물 CAD 자료의 수치지도 건물 객체와의 형상 정합 및 지도좌표 부여 방법의 제안)

  • Huh, Yong;Yu, Ki-Yun;Kim, Hyung-Tae
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.4
    • /
    • pp.387-396
    • /
    • 2008
  • An integration between construction CAD data and GIS data needs geo-referencing processes of construction CAD data whose coordinate systems are their own native or even unknown. Generally, these processes are based on manually detected conjugate-vertices. In this study, we proposed an semi-automated conjugate -vertices detection method for building features between construction CAD data and a digital map using a vertex attributed string matching algorithm. A geo-referencing function for construction CAD data based on the similarity transform could be derived with those conjugate-vertices. Using our proposed method, we overlaid geo-referenced CAD data to a digital map of the College of Engineering, Seoul National University and evaluated our method.

A Study on the development of Construction Field Management Model based on BIM (BIM기반 건설현장 관리모델 개발에 관한 연구)

  • Jun, Young-Woong;Lee, Myoung-Sik
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.9 no.3
    • /
    • pp.69-76
    • /
    • 2009
  • The importance of efficient construction site management has been growing as the amount of construction information increases which is used in the growing construction site. Accordingly in this study, we are trying to find out the application situation and possibility of BIM through theoretical examination and domestic & overseas case study of BIM and we are trying to suggest the way of efficient construction site management formulation through implementation phase-oriented and cooperation entity-oriented analysis in the construction site. We found out that it was possible to minimize time loss and financial loss by visualizing 2D drawings through 3D modeling of target building by applying BIM and that it was possible to improve accuracy of budget planning with quantitative information of 3D model, to plan construction process with more confidence due to accurate architectural information of drawings and quantitative information, and to manage cost and quality through process management based on construction information acquired by BIM including object information by part. It is concluded that we can improve efficiency of construction management between field and each cooperating entity by integrating and linking BIM information through this process.

  • PDF

The Design and Implementation of Project Management Information System based on 4CM (4CM기반의 건설사업관리 시스템 개발 및 구현)

  • Choi, Sung Youn;Kim, Jae Soo
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.2
    • /
    • pp.101-113
    • /
    • 2011
  • As information and communication technology advances driving the rapid evolution of e-commerce and e-business becomes on effective marketing means for both business and institutions, the industry deals with these changes and has a profound, positive impact on production and operations management. But the construction industry falls behind compared with other industries in productivity, informationalization, automatization and globalization. Especially even though the informationalization is inevitable in any developing society, a number of construction industries can hardly cope with it properly. As the construction industry gets informationalized and advanced, the introduction of PMIS (Project Management Information System) is making progress actively for the effective construction project control and productivity improvement in construction. With the government officials' political promotion and the rising desire for construction informationalization of enterprises, many are attempting to develop integrated systems or to replace a previous system with a more advanced alternative. Construction Industry, however, has the peculiar properties that the period for the completion of construction is limited and on top of that, most of its data processing systems are seen as being an early stage in the design of management information systems. As a result, there are extremely few applications in the construction industry. In this paper, we propose the PMIS system based on new model 4CM that improves on previous models.

A Case Study on Construction Management in Nuritkum Square Project (누리꿈스퀘어 프로젝트의 건설사업관리 사례)

  • Lim, Hyun-Yong;Yoo, Seung-Kon;Seo, Joon-Oh
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.25-31
    • /
    • 2007
  • Nuritkum Square Project is a IT Complex which is being constructed in Digital Media City. The project consists of several buildings and is a Design-build, so that the systematic construction management from design to construction stage is more important for a successful project. This study introduces the practical tasks of construction management during the project and analyze some of main tasks to increase understanding construction management in the design-build project. Based on experience of construction management in this project, we examine managerial problems which frequently occur in this kind of project, and suggest how to improve construction management in Korea.

  • PDF