• Title/Summary/Keyword: Development of a Measuring Instrument

Search Result 206, Processing Time 0.022 seconds

A Study on Research and Development Strategies for Measuring Instrument (계측기기 연구개발 전략에 관한 연구)

  • 최만용
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.6 no.1
    • /
    • pp.109-114
    • /
    • 1997
  • In the past few decades, the measuring instrument industries have made rapid progress with increase on the demand in industries such as precision instrument, chemistry, electronics, industrial measurement and automobile. Thus, development strategy and technical advancement are required for both securing the competitiveness on products in the world market and industrial development. Intensifying competitiveness of measuring instrument is needed in the world market. It can be achieved by development of measuring instrument holding comparative priority. A development strategy should be drawn up in the long-term point of view for coping with the increasing demand of measuring instrument and securing competitiveness in the world market.

  • PDF

A Development of Measuring Instrument of Portable Partial Discharge for Diagnosis of GIS Installation and Application (GIS 설비 진단을 위한 포터블 부분방전 측정장치 개발 및 응용)

  • Kim, Jong-Seo;Kim, Jin-Tea;Shin, Heung-Sik;Lee, Heung-Jea
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.2
    • /
    • pp.231-234
    • /
    • 2009
  • Recently, to the development of a highly information-oriented society to a large increase in dependence on power, Accordingly, it is need that active development and spread of preservation technology on accident prevention in operation electrical equipment. However, to lack of the use on maintenance technology of power equipment and to increase of power usage is growing deterioration of power equipment, this is a cause on casualties, property damage and the occurrence of disasters is a growing. GIS equipments which are operated from domestic except the equipment which manages from the big business are depend on a most visual inspection, and do inspection method or measuring instrument etc. a condition which is not supplied widely. Currently, many to measure instrument used in domestic is very expensive or foreign, it will be able to substitute this, the development necessity of the diagnosis technique and the measuring instrument is demanded.

Development of a Fizeau Interferometer System for Measuring the Profile of Large Optical Lens (대구경 렌즈의 형상 측정을 위한 Fizeau 간섭계 시스템 개발)

  • Bae, Kwang-Hwan;Lee, Eung-Suk;Lee, Ki-Am;Kim, Ok-Hyun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.30 no.12 s.255
    • /
    • pp.1649-1657
    • /
    • 2006
  • Fizeau interferometer is well known optical instrument for measuring the lens profile accurately. The object of this study is focused on the design and optical measuring techniques for large optical components, such as a reflection mirror for astronomical purpose. Measuring of large optical lens, the object could not be moved as small one but the measuring instrument must be moved for the alignment, because of the geometric conditions and the accuracy of the stage. Therefore, a five axis stage is designed to align the Interferometer instead of the measuring object. This instrument will be used for an on machine measuring system in polishing machine for large optical lens.

The development of tube voltage meter using the semiconductor (반도체소자를 이용한 관전압계의 개발)

  • Seon, Jong-Ryul;Shin, Dae-Chul
    • Journal of radiological science and technology
    • /
    • v.25 no.2
    • /
    • pp.71-75
    • /
    • 2002
  • According to this study, we can make the radiation check meter which have not supply because of high cost and import barrier and lengthen its life by means of repairing of radiation bomb and equipment. We can make better medical service. In my study, I used the photodiod, photoelectron, among semiconductor detectors which have a excellent detect capacity and are low cost and small size. I set up this equipment in June 1, 2002, used 640 mA remote operative fluorography equipment, which make the grade as capacity test. I used the standard measuring instrument which took proofs from a agency, now it was using in measuring agency. The comparative measuring instrument used in same condition. I took the standard which was gauged with a connecting measuring instrument. Using a existing unconnected measuring instrument, I compared the accuracy with new unconnected one. As a result, three score are within the standard. For the detailed analysis, I took the average of percentage average error. So standard instrument was -0.02, comparable was -0.22, and new one was -0.17. New one took a closer measured value with standard than comparable one. In more study, I think to take more accurate value. I expect that my study will be a base of measuring instrument, with low cost, supply of this instrument increase, I expect to decrease radiation bomb and maintain, repair and manager better.

  • PDF

The Study for Development on Earlier Evaluation Instrument of Strength of Concrete -Outline of Experiment and Investigation on Suitability of Instrument- (콘크리트 강도 조기 판정기의 개발에 관한 연구 (1) 실험 계획 및 실험기기의 적합성 검토)

  • 김화중;이도헌;윤상천;박정민
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1994.10a
    • /
    • pp.435-440
    • /
    • 1994
  • It is considered to pressing problem that the develpment of the rapid and simple method and measuring instrument, can evaluate for quality of concrete at early period. Accordingly in this paper proposed to earlier evaluation method on quality of concrete using resistance method and ultra-sonic pulse velocity test. It was found to the possibility of development on test method and instrument through a series of fundmental investigation.

  • PDF

Development and Performance Evaluation of Hybrid Measuring Instrument (하이브리드 측정기의 개발 및 성능평가)

  • Lee, Young-Ho;Park, Gi-Bum;Cho, Young-Tae;Lee, Eung-Suk;Jung, Yoon-Gyo
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.16 no.3
    • /
    • pp.69-75
    • /
    • 2017
  • There are two types of expensive measuring instruments currently on the market shape measurement and roundness measurement instruments. As they are very expensive, from tens of millions to more than 200 million won, buying them is economically burdensome for small companies or individuals. Therefore, in order to integrate the shape and roundness measurements into a single transfer device, this study aimed to reduce the trial and error by 3D modeling and simulation, and we confirmed the feasibility of operation. Based on these outcomes, a prototype hybrid measuring instrument was fabricated. As a result of performance evaluation and comparative evaluation, we verified the feasibility of implementation and application of the hybrid measuring instrument.

A Current Collection Performance On-line Test Plan in Korea High Speed Train Development Project (고속전철 기술개발사업 본선 시운전 집전시험계획)

  • 조용현;최강윤;백광선
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.156-162
    • /
    • 2001
  • Current collection performance on-line tests for a Korean High Speed Train being developed in G7 project is scheduled to start in June, 2002. In this paper, preparatory efforts for measuring contact forces which is regarded as one of major measuring items in the test are introduced. Specifically speaking, review of frequencies related with contact force fluctuations, brief of contact force measuring algorithm, review of measuring instrument specifications and development of a data acquisition program are presented.

  • PDF

Development of an Instrument to Measure the Readiness of an Organization for Knowledge Management (조직의 지식경영 준비도(Readiness) 측정도구 개발에 관한 연구)

  • Kim, Hyogun;Kwon, Hee-Young;Jeong, Seong-Hwi
    • Knowledge Management Research
    • /
    • v.2 no.1
    • /
    • pp.45-63
    • /
    • 2001
  • The role of knowledge as the key source of potential advantage for organizations and economies has become a hotly debated topic. Some studies found that organizations had their own knowledge management styles. Knowledge Management draws form existing resources that organizations may already have in place. Checking the organization's infrastructures for Knowledge Management is the first step for Knowledge Management. Although the as- is analysis of organizations before knowledge management is important, but there is no study on the readiness for Knowledge Management. This study reports on the development of an instrument designed to measure the readiness of an organization for knowledge Management. Starting with the literature, 4 dimensions - strategy, process, culture/people, and technology - and 18 factors were identified. Then, a questionnaire for measuring readiness was created. Finally, the instrument was pilot tested to prove its reliability and validity. Following the pilot test, the factors all demonstrated acceptable levels of reliability. The result is 19 factors instrument comprising 4 dimensions which provide a useful tool for measuring the readiness for Knowledge Management.

  • PDF

Ideal Topographic Simulations for Null Measurement Data

  • Su, Yan-Jen;Tung, Chi-Hong;Chang, Leh-Rong;Chen, Jin-Liang;Chang, Calvin
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.9 no.4
    • /
    • pp.79-82
    • /
    • 2008
  • A method is described for ideally reconstructing the profile from a surface profiling measurement containing a reasonable amount of null measurement data. The proposed method can conjecture lost information and rectify irregular data that result due to bad measuring environments, signal transmission noise, or instrument-induced errors, The method adopts the concept of computer graphics and consists of several processing steps. First, a search for valid data in the neighborhood of the null data is performed. The valid data are then grouped and their contours are extracted. By analyzing these contours, a bounding box can be obtained and the general distribution of the entire area encompassing the valid and null data is determined Finally, an ideal surface model is overlaid onto the measurement results based on the bounding box, generating a complete reconstruction of the calculations, A surface-profiling task on a liquid crystal display photo spacer is used to verify the proposed method. The results are compared to those obtained through the use of a scanning electron microscope to demonstrate the accuracy of the proposed method.

The Development of Visual Inspection for Length Measurement of Injection Product Using Vision System (Vision System을 이용한 사출제품의 길이 측정용 시각검사 System 개발)

  • J.Y. Kim;B.S. Oh;S. You
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.14 no.11
    • /
    • pp.126-134
    • /
    • 1997
  • In this study, We made visual inspection system using Vision Board. It is consist of an illuminator (a fluorescent lamp), image input device (CCD (Charge-Coupled Device) camera), image processing system(Vision Board(FARAMVB-02)), image output device (video monitor, printer), and a measuring instrument(TELMN1000). Length measurement by visual inspection system make use of 100mm guage block(instead of calculating distance between a camera and a object). It measured horizontal and vertical length factor from 400mm to 650mm by increasing 50mm. In this place, measured horizontal and vertical length factor made use of length measure- ment of a injection. A measuring instrument used to ompare a measured length of a injection visual inspection system with it. In conclusion, length measurement of a injection compared a measuring instrument with visual inspecion system using length factor of 100mm gauge block. We find that maximum error of length is 0.55mm when it compar with the measuring value of two devices(FARAMVB-02, TELMN1000). Program of visual inspection system is made up Borland C++3.1.

  • PDF