• 제목/요약/키워드: Development of Estimation Model

검색결과 1,439건 처리시간 0.031초

기능점수를 이용한 소프트웨어 규모추정 실증연구 (An Empirical Study of SW Size Estimation by using Function Point)

  • 김승권;이종무;박호인
    • 디지털산업정보학회논문지
    • /
    • 제7권2호
    • /
    • pp.115-125
    • /
    • 2011
  • An accurate estimation of software development size is an important factor in calculating reasonable cost of project development and determining its success. In this study, we propose estimation models, using function point based on the functional correlation between software, with empirical data. Three models($FP_{est}(I)$, $FP_{est}(II)$, $FP_{est}(III)$) are developed with correlation and regression analysis. The validity of the models is evaluated by the significance test by comparing values of Mean Magnitude of Relative Error (MMRE) and predictions of each model at level n%. Model $FP_{est}(III)$ proved to be superior to other models such as IFPC(Indicative Function Point Count), EFPC(Estimated Function Point Count), EPFS(Early Prediction of Function Size), $FP_{est}(I)$, and $FP_{est}(II)$. As a result, the accuracy of the model appears to be very high to determine the usefulness of the model to finally overcome weakness of other estimation models. The model can be efficiently used to estimate project development size including software size or manpower allocation.

기능점수를 이용한 소프트웨어 개발노력 추정 (Software Development Effort Estimation Using Function Point)

  • 이상운;강정호;박중양
    • 정보처리학회논문지D
    • /
    • 제9D권4호
    • /
    • pp.603-612
    • /
    • 2002
  • 소프트웨어공학에서 소프트웨어 측정분야는 30년 이상 수많은 연구가 있어 왔으나 아직까지 구체적인 소프트웨어 개발노력과 비용 추정 모델이 거의 없는 실정이다. 만약 소프트웨어 개발노력과 비용을 측정하려면 소프트웨어 규모를 추정해야 한다. 소프트웨어의 규모를 측정하기 위한 많은 소프트웨어 척도가 개발되었지만 가장 일반적인 척도가 LOC(line of code)와 FPA(Function Point Analysis)이다. FPA는 소프트웨어 규모를 측정하는데 LOC를 사용할 때의 단점을 극복할 수 있는 기법이다. 본 논문은 FP(Function Point)로 측정된 소프트웨어 규모로 소프트웨어 개발노력을 추정하는 단순회귀모델을 제안한다. 실험에 사용된 데이터들은 다양한 개발환경과 개발방법을 적용한 최근의 789개 소프트웨어 개발 프로젝트들이다. 실험 데이타들에 대한 산점도를 그려 개발노력과 FP의 적합한 관계로부터 단순회귀분석 모델을 유도하였다. 또한, 다양한 소프트웨어 개발환경과 개발방법 등을 고려해 개발된 최근의 대용량 프로젝트에 대해 제안된 단순회귀분석 모델이 기존의 회귀분석 모델들보다 개발노력 추정 정확성이 월등히 좋음을 보였다.

소프트웨어 개발형태 기반 개발기간 추정 연구 (A Study of Development Schedule Estimation Based on Development Type)

  • 박석규;김운용
    • 한국컴퓨터산업학회논문지
    • /
    • 제7권3호
    • /
    • pp.191-198
    • /
    • 2006
  • 소프트웨어 측정분야는 30년 이상 수많은 연구가 있어 왔으나 아직까지 구체적인 소프트웨어 개발노력, 개발기간과 비용 추정 모델이 없는 실정이다. 소프트웨어 개발기간을 추정하기 위한 기존의 모델들은 사용된 데이터 크기가 적고 과거 프로젝트들을 대상으로 하고 있어 현재의 복잡하고 다양한 개발환경에 적용하는데 제약이 따른다. 따라서, Oligny et al.은 ISBSG Benchmark Release 4의 396개 프로젝트에 대해 개발기간이 개발플랫폼에 영향을 받음을 제기하여 각 개발플랫폼에 따른 개발기간 추정 모델을 제시하였다. 본 논문은 Oligny et al. 모델들을 ISBSG Benchmark Release 6의 534개 프로젝트에 대해 적용한 결과 개발기간이 개발플랫폼에 영향을 적게 받음을 밝혔다. 따라서, 개발기간에 보다 영향을 미치는 개발형태를 채택해, 개발형태에 따른 개발기간 추정 모델을 제시하였다. 제안된 모델들은 개발 플랫폼의 영향보다 개발기간 추정에 보다 많은 영향을 미침을 밝혔으며, 개발기간 추정시 개발형태별로 추정하는 모델 적용이 보다 타당함을 알 수 있다.

  • PDF

공법 기반 견적 시스템 개발 전략 (A Development Strategy for Construction method based Estimation System)

  • 김성아;강명구;윤수원;박영진;진상윤;최철호
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.341-345
    • /
    • 2007
  • The objective of this paper is to introduce a project on developing construction method based estimation system. It means a 3D product model based estimation system to effectively and efficiently manage estimation process during the project life-cycle. This paper describes a outline and method for 3D based estimation system. Normally, it is not easy to take-off the quantity from 3D CAD model, because of all different depths of the quantity take off in each design development stage and nation. This study shows how to keep the balance of its depths in each design development stage such as schematic design, detail design, shop drawing, and so forth.

  • PDF

단지공사의 공사비 예측모형 개발 - 토공사를 중심으로 - (A Development for Construction Cost Prediction Model of Site Development Project)

  • 이원용;이태식;박종현;배건
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.419-422
    • /
    • 2002
  • 현대 건설산업의 특징은 전문화, 복잡화, 대형화 등으로 다각적으로 변하고 있다. 따라서, 전통적인 공사비 관리체계로는 증가하는 건설공사의 불확실성을 감당할 수 없는 것이 현실이다. 이로 인하여 수많은 공사에서 공사비 증가현상이 발생하면서 건설사업의 성공적인 수행에 영향을 주고 있다. 따라서, 공사비 증가 현상을 방지하고, 효과적인 공사비 관리를 위해서는 정확한 견적을 통하여 관리 목표를 설정하고, 목표를 달성하기 위한 활동들이 필요하다. 본 연구에서는 효율적 공사비 관리를 위하여 기존에 사용된 공사비 모형을 분석하고, 단지조성 공사의 공사비 모형 구축에 필요한 표준 분석체계를 구축하여, 실제 단지조성 공사 사례 분석을 통하여 계획 및 설계단계에서 이용할 수 있는 공사비 모형을 제시하고자 한다.

  • PDF

지식정보 구축 대가의 개발 : 국가직무표준(National Competency Standards)과의 통합 방안을 중심으로 (A Development of a Framework Cost Estimation Model for the Digital Document Database Construction Projects)

  • 김소정;서용원;손영호
    • 한국IT서비스학회지
    • /
    • 제16권3호
    • /
    • pp.47-65
    • /
    • 2017
  • The reference guide for the cost of establishing the digital documents has been used as a basis for establishing the budget for the construction of the knowledge information resource. However, due to the abolition of the nominal unit price notification in terms of IT projects, it is necessary to conduct research to convert the standard of the current labor force grade standard to the national incompetency standard (NCS). In this study, we investigate and revise the system and contents of the current knowledge information cost estimation model. In specific, i) we conducted gap analysis of cost estimation model and existing NCS model. As the contents conforming for the construction of the knowledge information resource were not adoptable, we define the description of the construction of the knowledge information resource and to identify the core elements of NCS prior to the improvement of the cost model. ⅱ) then we proposed improve the cost model considering integration with newly proposed NCS model for knowledge information construction job. In order to ensure the validity of the application of NCS development and cost estimation model, the experts reviewed relevant contents and made plans for improvement by using experts from supply and demand groups of various fields of national knowledge informatization projects.

재해연보 자료를 이용한 지역 단위 수해폐기물 발생량 예측 모형 개발: 울산광역시 사례 연구 (Development of Regional Flood Debris Estimation Model Utilizing Data of Disaster Annual Report: Case Study on Ulsan City)

  • 박만호;김호남;주문솔;김희종;김재영
    • 한국폐기물자원순환학회지
    • /
    • 제35권8호
    • /
    • pp.777-784
    • /
    • 2018
  • Since climate change increases the risk of extreme rainfall events, concerns on flood management have also increased. In order to rapidly recover from flood damages and prevent secondary damages, fast collection and treatment of flood debris are necessary. Therefore, a quick and precise estimation of flood debris generation is a crucial procedure in disaster management. Despite the importance of debris estimation, methodologies have not been well established. Given the intrinsic heterogeneity of flood debris from local conditions, a regional-scale model can increase the accuracy of the estimation. The objectives of this study are 1) to identify significant damage variables to predict the flood debris generation, 2) to ascertain the difference in the coefficients, and 3) to evaluate the accuracy of the debris estimation model. The scope of this work is flood events in Ulsan city region during 2008-2016. According to the correlation test and multicollinearity test, the number of damaged buildings, area of damaged cropland, and length of damaged roads were derived as significant parameters. Key parameters seems to be strongly dependent on regional conditions and not only selected parameters but also coefficients in this study were different from those in previous studies. The debris estimation in this study has better accuracy than previous models in nationwide scale. It can be said that the development of a regional-scale flood debris estimation model will enhance the accuracy of the prediction.

Support Vector Regression을 이용한 소프트웨어 개발비 예측 (Estimating Software Development Cost using Support Vector Regression)

  • 박찬규
    • 경영과학
    • /
    • 제23권2호
    • /
    • pp.75-91
    • /
    • 2006
  • The purpose of this paper is to propose a new software development cost estimation method using SVR(Support Vector Regression) SVR, one of machine learning techniques, has been attracting much attention for its theoretic clearness and food performance over other machine learning techniques. This paper may be the first study in which SVR is applied to the field of software cost estimation. To derive the new method, we analyze historical cost data including both well-known overseas and domestic software projects, and define cost drivers affecting software cost. Then, the SVR model is trained using the historical data and its estimation accuracy is compared with that of the linear regression model. Experimental results show that the SVR model produces more accurate prediction than the linear regression model.

개략적 일정추정표 기반 소프트웨어 개발노력과 일정 추정 (Estimation of Software Development Efforts and Schedule Based on A Ballpark Schedule Estimation Table)

  • 박영목
    • 인터넷정보학회논문지
    • /
    • 제8권4호
    • /
    • pp.105-117
    • /
    • 2007
  • 프로젝트 관리자는 입찰 또는 개발을 성공하기 위해 비용과 일정을 프로젝트 초기 단계에서 보다 정확히 추정해야만 한다. 평균적으로 대부분의 프로젝트들이 수행하고 있는 명목상의 개발기간은 경험법칙, 선형함수 추정경험 또는 개략적 일정 추정표로부터 유도할 수 있다. 명목상 개발기간에는 다양한 경험법칙이 존재하며, 선형함수 모델은 충분한 정보를 제공하지 못하여 특정 규모의 프로젝트에 적합한 개발노력과 일정을 결정하기 어렵다. 본 논문은 개략적 일정 추정표로부터 개발노력과 일정을 유도하는 통계적 회귀분석 모델을 제시하였다. 먼저, 개략적 일정 추정표에서 제시하고 있는 최대 단축기간, 효율적 개발기간과 명목상 개발기간을 재정의 하였다. 다음으로 개발노력과 기간과의 관계를 고찰하고, 개략적 일정추정표에 제시되지 않은 특정 규모의 소프트웨어에 대한 개발노력 추정 모델과 개발노력에 따른 일정을 보다 정확히 추정할 수 있는 모델을 제시하였다. 제시된 회귀분석 모델은 기존의 방법들과 비교하여 상대오차를 최대 2%까지 줄이는 효과를 얻었다. 또한, 특정 규모의 소프트웨어에 대해서도 개발노력과 일정을 추정할 수 있었다.

  • PDF

오브젝트-파라미터기반 건축마감공사비 개산견적 모델 (Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings)

  • 구교진;박성호;박성철;송종관
    • 한국건설관리학회논문집
    • /
    • 제9권6호
    • /
    • pp.175-184
    • /
    • 2008
  • 건설 프로젝트의 수익성 및 타당성을 판단하기 위한 기준으로 설계초기단계에 활용되는 개산견적은 설계의사결정 업무와 밀접한 연계성을 가지고 수행되어야 할 뿐만 아니라, 정확하고 신뢰성 있는 견적결과를 도출해야 한다. 설계초기단계에서 설계자의 의사결정 지원과 설계변경에 대한 즉각적인 대처를 위해 프로토타입기반 개산견적 시스템이 개발되었지만, 파라미터에 의해 산정되는 공사항목 및 사용자에 의한 추가공사에 대한 공사비 고려가 미흡하였다. 따라서 본 연구에서는 견적의 정확도를 향상시키기 위해 실제 고층 오피스 빌딩 프로젝트의 실적자료 분석을 통해 기본설계단계에서 오브젝트-파라미터기반 건축마감공사비 산정 모델(Object & Parameter based Schematic Estimation Model, OPSEM)을 개발하였다. 모델 개발을 위해 공사비 내역서, 도면으로부터 얻은 작업항목에 대한 정보를 분석 및 분류하고, 각 작업항목 속성에 맞는 공사비 산정 방식을 제안하였다. 본 연구의 실무 효용성 검증을 위해 유사 사례 프로젝트를 바탕으로 기존의 견적방식과 제시된 모델을 활용한 견적방식의 오차율을 분석하여 정확도 비교를 실시하였다.