A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

오브젝트-파라미터기반 건축마감공사비 개산견적 모델 (Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings)

  • 구교진;박성호;박성철;송종관
    • 한국건설관리학회논문집
    • /
    • 제9권6호
    • /
    • pp.175-184
    • /
    • 2008
  • 건설 프로젝트의 수익성 및 타당성을 판단하기 위한 기준으로 설계초기단계에 활용되는 개산견적은 설계의사결정 업무와 밀접한 연계성을 가지고 수행되어야 할 뿐만 아니라, 정확하고 신뢰성 있는 견적결과를 도출해야 한다. 설계초기단계에서 설계자의 의사결정 지원과 설계변경에 대한 즉각적인 대처를 위해 프로토타입기반 개산견적 시스템이 개발되었지만, 파라미터에 의해 산정되는 공사항목 및 사용자에 의한 추가공사에 대한 공사비 고려가 미흡하였다. 따라서 본 연구에서는 견적의 정확도를 향상시키기 위해 실제 고층 오피스 빌딩 프로젝트의 실적자료 분석을 통해 기본설계단계에서 오브젝트-파라미터기반 건축마감공사비 산정 모델(Object & Parameter based Schematic Estimation Model, OPSEM)을 개발하였다. 모델 개발을 위해 공사비 내역서, 도면으로부터 얻은 작업항목에 대한 정보를 분석 및 분류하고, 각 작업항목 속성에 맞는 공사비 산정 방식을 제안하였다. 본 연구의 실무 효용성 검증을 위해 유사 사례 프로젝트를 바탕으로 기존의 견적방식과 제시된 모델을 활용한 견적방식의 오차율을 분석하여 정확도 비교를 실시하였다.

유스케이스 점수 기반 소프트웨어 비용 추정 (Software Cost Estimation Based on Use Case Points)

  • 박주석
    • 정보처리학회논문지D
    • /
    • 제12D권1호
    • /
    • pp.103-110
    • /
    • 2005
  • 소프트웨어 개발은 구조적기법에서 객체지향기법으로 전환되고 있다. 객체지향 소프트웨어 개발은 폭포수 프로세스가 아닌 반본적 프로세스 적용을 보다 선호하고 있으며, 유스케이스에 기반하여 요구사항을 도출하고, 이에 기반하여 분석, 설계와 코딩이 이루어지고 있다. 따라서, 유스케이스에 기반하여 개발될 소프트웨어의 규모가 추정되고 이에 기반한 개발노력, 비용과 개발기간이 추정되어야만 프로젝트 성공을 위한 관리가 가능해진다. 기존의 유스케이스 점수 관련 개발노력 추정 모델들은 겉형과 비선형 모델들이 제안되었지만 유스케이스 점수의 규모에 따른 개발노력을 적절히 추정할 수 있는 모델이 없는 실정이다. 본 논문은 성장곡선을 적용해 유스케이스 점수에 대한 개발노력을 추정하는 모델을 적용한 결과 기존의 통계적 모델들보다 월등한 성능향상을 보였다. 따라서, 본 모델을 적용하여 개발노력을 추정함으로서 프로젝트 개발관리를 적절히 수행할 수 있을 것이다.

Development of a Cost-benefit Model for the Management of Structural Risk on Oil Facilities in Mexico

  • Leon, David-De;Alfredo H-S. Ang
    • Computational Structural Engineering : An International Journal
    • /
    • 제2권1호
    • /
    • pp.19-23
    • /
    • 2002
  • A reliability-based cost-benefit model for the risk management of oil platforms in the formulation of optimal decisions based on life-cycle consideration is proposed. The model is based on structural risk assessments and the integration of social issues and economics into the management decision process. Structural risks result from the platform's exposure to the random environmental loading associated with the offshore site where it is located. Several alternative designs of a typical platform are proposed and assessed from the cost-effectiveness viewpoint. This assessment is performed through the generation of cost/benefit relationships that are used, later on, to select the optimal design.

  • PDF

Prediction of duration and construction cost of road tunnels using Gaussian process regression

  • Mahmoodzadeh, Arsalan;Mohammadi, Mokhtar;Abdulhamid, Sazan Nariman;Ibrahim, Hawkar Hashim;Ali, Hunar Farid Hama;Nejati, Hamid Reza;Rashidi, Shima
    • Geomechanics and Engineering
    • /
    • 제28권1호
    • /
    • pp.65-75
    • /
    • 2022
  • Time and cost of construction are key factors in decision-making during a tunnel project's planning and design phase. Estimations of time and cost of tunnel construction projects are subject to significant uncertainties caused by uncertain geotechnical and geological conditions. The Gaussian Process Regression (GPR) technique for predicting ground condition and construction time and cost of mountain tunnel projects is used in this work. The GPR model is trained with data from past mountain tunnel projects. The model is applied to a case study in which the predicted time and cost of tunnel construction using the GPR model are compared with the actual construction time and cost for model validation and reducing the uncertainty for the future projects. In addition, the results obtained from the GPR have been compared with to other models of artificial neural network (ANN) and support vector regression (SVR) that the GPR model provides more accurate results.

의료보험 의약품 관리원가의 정의 및 산정모형 개발 (Definition of Medical Drug Administration Cost and Development of Its Costing Model under the Korean Medical Insurance Fee-for-Service System)

  • 황인경
    • 보건행정학회지
    • /
    • 제9권1호
    • /
    • pp.1-29
    • /
    • 1999
  • The Government has recently planned to improve the medical insurance drug price systems by removing the drug margin occurring from the difference between the official and purchasing prices, and instead by setting prices through adding drug administration casts calculated to the purchasing costs. In the circumstances, the major policy and implementing issues are how to define the drug administrance cost and how to calculate them. This study attempts to provide for the conceptional and operational definitions and thereby develop a costing model for the cost. The relationship between the current systems of medical services costs and prices were reviewed to define the concept of the costs. The study defined the costs from the narrow and wide prospective of meaning, and three operational definitions were provided. The costing model was developed applying the departmental costing principles. Finally, several prerequisites that have to be considered for the implementation of the definition and the model from the practical viewpoint.

우주발사체 개발사업의 비용 추정 현황 및 사례 (Application of Cost Estimation to Space Launch Vehicle Development Program)

  • 유일상;서윤경;이준호;오범석
    • 산업경영시스템학회지
    • /
    • 제30권3호
    • /
    • pp.165-173
    • /
    • 2007
  • A space launch vehicle system represents a typical example of large-scale multi-disciplinary systems, consisting of subsystems such as mechanical structure, electronics, control, telecommunication, propulsion, material engineering etc. A lot of cost is required to develop the launch vehicle system. A precise planning of R&D cost is very essential to make a success of the launch vehicle development program. Especially in the early development phase of a new space launch vehicle system, cost estimation techniques and analogy from past similar development data are very useful methods to estimate a development cost of the launch vehicle system. Now Korea Aerospace Research Institute is in charge of the KSLV-I (Korea Space Launch Vehicle-I) Program that is a part of Korea National Space program. KSLV-I Program is a national undertaking to develop launch capabilities to deliver science satellites of a 100kg-class into a low earth orbit. It is hereafter, going to plan to develop a new korean space launch vehicle. In this paper, first the development costs of well-known launch vehicles in the world are presented to provide a reference to make a development plan of a new launch vehicle. Second this paper introduces the present status of cost estimation applications at NASA. Finally this paper presents the results from application of a TRANSCOST, a parametric cost model, to derive a cost estimate of a new launch vehicle development, as an example.

공공업무시설의 수선비 조사를 통한 연차별 비용변화 패턴 및 수선비 항목별 발생빈도와 평균비용 분석 (A Study on cost expenditure characteristics and importance level of each maintenance item of public office buildings by conducting cost surveys)

  • 최석규;김갑열
    • KIEAE Journal
    • /
    • 제8권1호
    • /
    • pp.111-118
    • /
    • 2008
  • To maintain the public office buildings, the related government employee uses cost under the limited budget. it is difficult to execute the budget as is assigned to maintenance items with contemplating the characteristics such as frequency, cost/item, weighting factor, and etc. As a precedent study about this cost-efficiency model, this study is intended to show the expenditure trends, frequencies, and cost distributions of maintenance items for the development of cost-efficiency model by analyzing time series data from the surveys on maintenance costs of the selected public office buildings.

Lean SCM에서의 모듈생산의 적용에 따른 모델개발과 원가분석 (The Development of Model and Cost Analysis to the Application of Modular Production System in Lean Supply Chain Management)

  • 김태호;양광모;권정휘;강경식
    • 대한안전경영과학회지
    • /
    • 제4권4호
    • /
    • pp.73-85
    • /
    • 2002
  • The supply chain not only includes the manufacturer and suppliers, but also transporters, warehouses, retailers, and customers themselves. Within each organization, such as manufacturer, the supply chain includes all functions involved in filling a customer request. these functions include, but are not limited to, new product development, marketing, operation, distribution, finance, and customer service. Lean Supply chain coordination improves if all supplier of chain take actions that together increase total supply chain profits. To design of Modularity by the grouping supplier, the proposed method is to develop the most appropriate production system models in the Supply Chain Management which is necessity of the times and its importance. The objects of this study is development of model and cost analysis to the modular production system in Lean SCM. Introduction of modular production system in Lean SCM is effective in reducing the cost in processing, manufacturing, inventory holding, ordering, etc.

A STUDY ON RISK WEIGHT USING FUZZY IN REAL ESTATE DEVELOPMENT PROJECTS

  • Sung Cho;Kyung-ha Lee ;Yong Cho ;Joon-Hong Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1176-1182
    • /
    • 2009
  • Due to recession in real estate market, interest of risk analysis is increasing. Feasibility study in the first stage takes a great role in a project. There are not objectified tools which are able to cope with uncertainty of project, and feasibility study based on selected method of determinism does not include liquidity of weight risk. Also, shortage of consideration for subjective and atypical external factors causes inappropriate results. Therefore, this study proposes feasibility study model focused on risk factor influences in construction cost and sales cost. Considering effective level of cost based on objective risk factors and probable weight of risk by this model, real workers are able to bring correct and scientific decisions better than former method based on selective analysis of real estate development.

  • PDF