• Title/Summary/Keyword: Development Cost

Search Result 8,032, Processing Time 0.046 seconds

KSLV-II Cost Estimate using TRANS COST 7.1 (TRANSCOST 7.1을 적용한 실용위성 발사체 비용추정)

  • Seo, Yun-Kyoung;Oh, Bum-Seok
    • Aerospace Engineering and Technology
    • /
    • v.6 no.2
    • /
    • pp.119-125
    • /
    • 2007
  • Space launch vehicle development needs many kinds of technologies synthetically. Nowadays, KARI (Korea Aerospace Research Institute) has developed a space launch vehicle, KSLV-I (Korea Space Launch Vehicle-I), that is able to load with an 100kg payload. After that it plans to develop Korean Space Launch Vehicle. As space launch vehicle becomes more complicate and larger, it needs a scientific and analytic development cost estimation. In this paper a cost estimation for KSLV-II using TRANSCOST 7.1 was studied.

  • PDF

Estimation of the Expected Socio-economic Benefits of the Largescale Comprehensive Agricultural Development Project and Jointcost Allocation -In the Case of Kumgang Project Area- (대단위 농업종합개발사업의 사회경제적 기대편익 추정과 결합비용의 배분 -금강지구를 중심으로-)

  • Lim, Jae Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.23 no.1
    • /
    • pp.159-176
    • /
    • 1996
  • This study is aimed at reviewing the methods of joint cost allocation and allocating the joint cost of estuary dam with specially repect to Kumgang Large-scale Agricultural Comprehensive Development Project. Apart from the water resource development project propelled by Water Resource Development Corporation in connection with Law of Multipurpose Dam Development, the Largescale Comprehensive Agricultural Development Projects couldn't ins-titutionally be carried out cost allocation of common facilities, even though it were concerned with irrigation, municipal and industrical water supply, flood control, sightseeing and industrial zone development components. To decrease farmer's burden of the project costs and, operation and maintenance costs, the joint costs of common facilities like estuary dam included in agricultural development projects have to be allocated by suitable method as alternative cost-remaining benefit method and the analytical activity should be supported by revising the concerned laws as Rural Development and Promotion and, Rural Rearrangement conpatible with the law for multipurpose dam development. Kumgang Agricultural Comprehensive Development Project was selected as a case study for the estimation of socio-economic benefits by project components and joint cost allocation of the estuary dam. The main results of the study are as follows; Joint cost allocation and unit charges by components 1. The project area will be 25,554ha with total project cost of 624,860 million won including the estuary dam cost of 120,843 million won. The project costs were ex-pressed by 1994 constant price. 2. Total quantity of water was estimated 365 million tons which were consisted of 245 million tons for irrigation, 73 million tons for municipal water and 47 million tons for industrial water. 3. The rates of joint cost allocation were amounted to 34.2% for agriculture, 2.5% for sightseeing, 45.7% for transportation, 11.8% for M & I water supply and 5.8% for flood control respectively. 4. The unit financial charges by project components were estimated at 7.88 won per ton for irrigation, 16.11won for M & I water, 1,686won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The financial charges using straitline method for depreciation were estimated at 7.88won per ton for irrigation, 9.12won per ton for M & I water, 624won per vehicle one pass for transportation and 331won per Pyeong for sightseeing area. 5. The unit economic charges by project components were estimated at 21.1 won per ton for irrigation, 15.2won for M & I water, 977won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The economic charges using straitline method for depreciation were estimated at 11.72won per ton for irrigation, 8.61won per ton for M & I water, 331won per vehicle one pass for transportation. Policy recommendation 1. The unit operation and maintenance costs for irrigation water in the paddy field couldn't be imposed as the water resource cost untreated. 2. The dam costs including investment cost and O & M cost, as a joint cost, had to be allocated by each benefited components as transportation, M & I water supply, flood control, irrigation and drainage, and sightseeing. But the agricultural comprehensive project have been dealt as an irrigation project without any appraisal socio-economic benefits and any allocating the joint cost of estuary dam. 3. All the associated project benefits and costs must be evaluated based on accounting principle and rent recovery rate of the project costs and O & M costs should be regulated by the laws concerned. 4. The rural development and promotion law and rural rearrangement law have to be revised comprising joint cost allocation considering free rider problems. 5. The government subsidy for the agricultural base development project has to be covered all the project costs. In case of common facilities representing joint cost allocation problems, all the allocated casts for other purposes like transportation and M & I water supply etc. should be recovered for formation in investment fund for agricultural base development and to procure O & M costs for irrigation facilities.

  • PDF

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Cost-Benefit Analysis of the Farmer's Health Center Project (FHCP) in Rural Korea (농업인건강관리실 사업의 비용편익 분석)

  • Hwang, Dae-Yong;Kang, Kyeong-Ha;Lee, Soon-Sung;Ko, Jeong-Sook;Oh, Seung-Young
    • Journal of Agricultural Extension & Community Development
    • /
    • v.13 no.2
    • /
    • pp.313-327
    • /
    • 2006
  • This study aims to examine the operating status of the Farmer's Health Center Project and the validity of its business using the benefit-cost analysis. As the pilot project of the Rural Development Adminstration from 1996, a total of 884 Farmer's Health Centers were established until 2004. Internal information of the RDA management unit was used for the analysis. A questionnaire with an interview was also performed with 70 over 468 Centers that had been established from 2001 to 2004. Results were as follows. 1) The Center was mainly used by elderly over 60 years, which took 71.4%. Winter was the most popular season for visiting. 2) Approximately 71% of the manager of the Center pointed out the deficiency of fuel cost as the most difficulty in operating the Center. 3) Users were moderately satisfied with facility and the effect of its use, which took 3.5 point over 5 scale. 4) For the cost-benefit analysis on the Centers, both 5% of social discount rate and 15 years of use term were assumed. Subsequently, the Net Present Value was 3,134 million won, which certified the validity of the business.

  • PDF

A Study on Awareness to Effectiveness of the Cost Estimation Guidelines for e-Learning Content Development in Era of Convergence (융합시대의 이러닝 콘텐츠 개발대가 산정 가이드라인의 실효성에 관한 인식 연구)

  • Noh, Kyoo-Sung
    • Journal of Digital Convergence
    • /
    • v.13 no.11
    • /
    • pp.7-14
    • /
    • 2015
  • The purpose of this study is to present the base for activation policy for cost estimation guidelines of e-Learning content development. To achieve this purpose, this study investigates the effectiveness of cost estimation guidelines of e-Learning content development through a survey about executives and employees in the e-Learning industry and analyses them statistically. According to an analysis, companies(which abandoned order because the amount of money (cost) of e-Learning contents ordering is low and suffered a loss after acquiring e-Learning contents project order) have a relatively negative awareness about the effectiveness of cost estimation guidelines of e-Learning contents. On the other hand, contents focused companies have a relatively positive awareness about the effectiveness of cost estimation guidelines of e-Learning contents. In conclusion, this study suggests that government should recommend and enact announce the use of cost estimation criteria(guidelines) of e-Learning content development and provide the institutional tools soon as possible.

A Study on the Factors of the Hardware Cost Estimation for Service Robot Development (서비스 로봇 개발의 하드웨어 비용추정을 위한 항목 도출에 관한 연구)

  • Lee, Jungsoo;Sohn, Dongseop;Choi, Yeon-Seo;Park, Myeongjun;Min, Jeongtack
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.5
    • /
    • pp.35-44
    • /
    • 2018
  • The purpose of this study was to derive the factors that affect the development cost and the priority/weight of effectiveness in the pre-development stage of a service robot to estimate the development cost. In particular, the functions of service robots vary according to the field of application, and their prices are not only different but most of them are small-scale production; hence, a cost estimation is necessary. In this research, the factors affecting the service robot development cost in the process of service robot development and adding functions are classified as a functional factor while the factors that affect the entire development cost due to environmental causes, in which the service robot is operated or in the development process, are classified as an adjustment factor. The FGI was conducted to derive the factors and a Delphi survey was conducted among 84 domestic experts to determine the weights of the factors. As a result of the analysis, six functional factors (41 detailed criteria) and five adjustment factors (17 criteria) were derived, the cost weight and rank of the factors were suggested. This study suggests that the development cost of the service robot can be used as a decision-making strategy to select the operation functions in the development process, and can be utilized as an essential tool for the service robot development.

Development of Design Alternative Analysis Program Considering RAM Parameter and Cost (RAM 파라미터와 비용을 고려한 설계대안 분석 프로그램 개발)

  • Kim, Han-sol;Choi, Seong-Dae;Hur, Jang-wook
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.18 no.6
    • /
    • pp.1-8
    • /
    • 2019
  • Modern weapon systems are multifunctional, with capabilities for executing complex missions. However, they are required to be highly reliable, which increases their total cost of ownership. Because it is necessary to produce the best results within a limited budget, there is an increasing interest in development, acquisition, and maintenance costs. Consequently, there is a need for tools that calculate the lifecycle costs of weapons systems development to facilitate decision making. In this study, we propose a cost calculation function based on the Markov process simulator-a reliability, availability, and maintainability analysis tool developed by applying the Markov-Monte Carlo method-as an alternative to these requirements to facilitate decision-making in systems development.

A Study on Policy for Actualizing the Development Cost Estimation Guidelines of e-Learning Contents in Era of Convergence (융합시대의 이러닝 콘텐츠 개발대가 산정기준의 실효성 제고 정책)

  • Noh, Kyoo-Sung;Han, Tae-In
    • Journal of Digital Convergence
    • /
    • v.13 no.9
    • /
    • pp.49-56
    • /
    • 2015
  • Korea government has established clear cost estimation standard based on a survey of e-learning contents development cost and presented 'e-Learning Contents Development Cost Estimation Guidelines' that reflect the characteristics of the e-learning industry. However, if there is no institutional support, this guideline and system fails to achieve the purposes and objectives. And it is likely to be facing a dead document. Therefore, the policy foundation is required. This study suggested the following policy; stepwise activation of cost estimation standard, enact announcement and periodically adjustment of cost estimation standard, installation and operation of cost estimation standard operational committee, conjunction with the e-learning industry survey, cultural diffusion of co-owned copyright, systematic monitoring of the e-learning contents development process, research on activating policy of cost estimation standard, conjunction with the standard contract for enhancing policy effectiveness.

Minimum Expected Life Cycle Cost Model for Optimal Seismic Design and Upgrading of Long Span PC Bridges (장대 PC교량의 최적 내진설계 및 성능개선을 위한 최소 기대 Life Cycle Cost 모델)

  • 조효남;임종권
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.04a
    • /
    • pp.305-312
    • /
    • 1999
  • This study is intended to propose a systematic and practical life cycle cost(LCC) model for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges. The LCC models consist of five cost functions such as initial cost, repair/replacement cost, human losses, road user cost, and indirect losses of regional economy. The proposed model Is successfully expressed in temrs of Park-Ang damage indices and life cycle damage probability obtained from SMART-DRAIN-2DX which is an existing algorithm for nonlinear time history analysis. The proposed LCC model is successfully applied to a viaduct constructed by PSM, in Seoul. Based on the observations, the proposed systematic procedure for the formulation of LCC model may be useful for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges.

  • PDF

The Optimal Release Time in Cost Model Using PCLS Model

  • Song, Kwang Yoon;Chang, In Hong;Choi, Min Su;Lee, Da Hye
    • Journal of Integrative Natural Science
    • /
    • v.9 no.3
    • /
    • pp.206-214
    • /
    • 2016
  • The basic goal of software development is to produce high quality software at low cost. Therefore, when to stop software testing and release the software product is a significant point in the software development. The software cost model is an effective tool used to help software developers control costs and determine the release time. In this paper, we discuss the cost model to apply all 6 models with consideration of time to remove errors, cost of removing each error and risk cost due to software failure. We show the impact of cost coefficients and parameter values on the expected total cost by changing the values and comparing the optimal release times.