• Title/Summary/Keyword: Detention Time

Search Result 105, Processing Time 0.044 seconds

NUMERICAL INVESTIGATION ON CAPTURE OF NANOPARTICLES IN ELECTROSTATIC PRECIPITATOR WITHOUT CORONA DISCHARGER (코로나 방전기가 없는 전기집진기의 나노입자 집진에 관한 수치해석)

  • Lee, J.W.;Jang, J.S.;Lee, S.H.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2010.05a
    • /
    • pp.103-108
    • /
    • 2010
  • This article presents computational fluid dynamics (CFD) simulations of nanoparticle movements and flow characteristics in laboratory-scale electrostatic precipitator (ESP) without corona discharge, and for simulation, it uses the commercial CFD program(CFD-ACE) including electrostatic theory and Lagrangian-based equation for nanoparticle movement. For validation of CFD results, a simple cylindrical type of ESP is simulated and numerical prediction shows fairly good agreement with the analytical solution. In particular, the present study investigates the effect of particle diameter, inlet flow rate, and applied electric potential on particle collection efficiency and compares the numerical prediction with the experimental data, showing good agreement. It is found that the particle collection efficiency decreases with increasing inlet flow rate because the particle detention time becomes shorter, whereas it decreases with the increase in nanoparticle diameter and with the decrease of applied electric voltage resulting from smaller terminal electrostatic velocity.

  • PDF

Development of a real time simulationg model considering water level of a detention (유수지 수위를 고려한 상류 침수유역의 실시간 모의기법 개발)

  • Lee, Yang-Jae;Lee, Jung-Ho;Jun, Hwan-Don;Joo, Jin-Gul;Kim, Joong-Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.199-203
    • /
    • 2007
  • 도시유역에서 강우에 의한 유출수는 하천으로 직접 방류되거나 유수지를 거쳐 방류된다. 특히 내수침수의 위험이 있는 지역은 유수지를 설치하여 펌프를 통하여 강제배제하는 방법을 선택하고 있다. 현재 유수지의 구조는 대부분 유입관거의 관저고는 유수지의 하단고와 일치하고 유수지의 관 상단고에 비해 유수지의 H.W.L(High Water Leverl)은 높게 설정되어 있다. 이는 유수지의 수위가 상승하는 경우에 배수효과에 의해 관거 내의 흐름에 만관의 흐름이 발생하고 이는 유수지로의 유입유량의 감소 및 내수침수 발생 가능성의 증가로 이어진다. 본 연구에서는 유수지 수위에 따른 상류의 침수유역의 크기와 침수량을 정량화 하였다. 또한 SWMM 5.0 DLL을 사용하여 실제 강우에 대하여 강우-유출 모의뿐만이 아니라 치수유역 분석까지 실시간으로 가능하게 하였다.

  • PDF

Control of Turbid Water Transport with Filamentous Mat in Lake (섬모상 매트에 의한 저수지와 댐에서 탁수확산차단 기술의 개발)

  • Yi, Qitao;Yu, Jianghua;Park, Sung-Soon;Kim, Young-Chul
    • Proceedings of the KAIS Fall Conference
    • /
    • 2009.05a
    • /
    • pp.888-890
    • /
    • 2009
  • This study presented a lab-scale apparatus for turbidity control in the lakes or reservoirs. Overall, the filamentous mat had a capture efficiency of 70~90% compared with the control group. Generally, the capture efficiency decreased with improved input turbidity flux. However, the attachment and sedimentation were thought to be the main processes for turbidity water retention and removal. Thus, the increase of hydraulic detention time in the mat zone is very important to improve the capture efficiency of the turbidity water.

  • PDF

Advanced Lake Water Treatment with Bipolar Packed Bed Electrode Cell(II) (3차원 전극(Bipolar Packed Bed Electrode)을 이용한 호소수 처리(II))

  • 장철현;박상우;최창수
    • Journal of Environmental Science International
    • /
    • v.11 no.4
    • /
    • pp.355-360
    • /
    • 2002
  • This study was to analyze the right of wrong of gray-water treatment by applying BPBE electrode cell to the effluence water in the terminal disposal plant of sewage. The results were as follows : The best result was obtained with applied voltage 40V and detention time 6 minutes for the BPBE electrode cell which has the graphite-plate in main electro-de, packing coconut activated carbon. The elimination rate of COD of Al-plate was higher than that of graphite-plate in main electrode. The result of electrolysis for 3 hour in parallel circuit showed the using possibility of gray-water according to each elimination rate : COD 59%, T-N 69 %, T-P 69%. The BPBE electrode cell with the Al-plate in main electrode made the best effect for the elimination of algae in lake water and algae were not occurred in electrolytic water.

The Nutrients Removal in Aerobic High Rate Ponds Through the Lighting Period (빛의 조사기간으로 본 호기성 고율 안정조 프로세스의 영양물질 제거)

  • 공석기
    • Journal of environmental and Sanitary engineering
    • /
    • v.11 no.1
    • /
    • pp.83-91
    • /
    • 1996
  • It is not too much to say that the territorial inhabitants' concerns are wholly c concentrated on the environmental preservation-problem and development-problem in Korea given effect to the local self-government system. At a time like this I was studied the effect on nutrients removal through lighting period in aerobic high rate pond and we know that waste stabilization pond method is the most economical and energy saving wastewater treatment technology than others. At the results which was studied through operating the reactor-l artifically main-tained at a temperature, $25^{\circ}C$, a light intensity, 3000lux, and a lighting period, 24hrs and the reactor-2 artifically maintained at a tern야rature, $25^{\circ}C$ and a light intensity 3000lux, and a lighting period period, 12hrs, It has appeared for 24hrs.-lighting period -reactor-1 to be prior to the reactor-2. The attained results are that 1. reactor-1 is prior to reactor-2 on oxygen-generation 2. reactor-1 is prior to reactor-2 on algal production 3. COD removal efficiency, 90.76%, T-N removal efficiency, 80%, T-P removal e efficiency, 74.47 % in reactor-2, in reactor-1 COD removal efficiency, 94.85 %, T-N removal efficiency, 98.07%, T-P removal efficiency, 72.13% are, so the treatment efficiency of reactor-1 is more excellent than things of reactor-2 4. it appeared that the detention time is 8, 9days.

  • PDF

A Study on the Design Factors of the Cylinder-Shaped Filter for Improving Reservoir Water Quality (호소수질 개선을 위한 원통형 여과장치의 설계요소 연구)

  • Lee, Sun-Ho;Kim, Seung-Hyun
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.31 no.8
    • /
    • pp.655-662
    • /
    • 2009
  • In order to obtain knowledge on the design and operation of practical?scale Cylinder-Shaped Filters, pilot experiments were conducted to observe the effects of stepwise augmentation of production rate on water quality and clogging. A production rate increase from 0.8 L/min to 2.4 L/min did not appear to affect the removal efficiencies of BOD(Biochemical Oxygen Demand), SS(Suspended Solids), and turbidity, as the values were maintained around 80%, over 95%, and over 90% respectively;however, COD(Chemical Oxygen Demand) removal decreased from 44% to 29%. In addition, results indicated an inverse relationship between production rate and detention time required to remove unit contaminant concentration, the observed detention time in the filter to remove 1 mg-COD/L being 83 minutes for the production rate of 0.8 L/min and 45 minutes for the production rate of 2.4 L/min, suggesting that a relatively higher production rate is likely to be more advantageous in the purification of reservoir water when compared to a lower production rate. Clogging was observed to originate from the surface and advance to the center of the filter, and although clogging seemed to increase as the production rate increased, this did not cause any difficulties in normal functioning of the filter for more than 2 years of operation, suggesting that this filter system can be used effectively in the purification of reservoir water.

STUDIES ON THE MATHEMATICAL KINETICS FOR THE REMOVABLE MOVING SCREEN MEDIA-ACTIVATED SLUDGE PROCESS (회전형 반고정망 활성슬럿지 공법의 수학적 해법에 관한 연구 1. 유기물 제거속도에 대하여)

  • HAN Ung-Jun;HAN Yeong-Ho
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.12 no.3
    • /
    • pp.167-173
    • /
    • 1979
  • It is preented the removable moving screen media-activated sludge (REMSMAS) process by using the biological fixed-film systems. The substrate removal kinetic difference between the aeration-only completed mixing activated sludge (CMAS) process and REMSMAS process were observed. The substrate removal kinetics were developed based on the attached and suspended microbial growths. The units of the aeration-only CMAS process were continously operated with the normal detention time of 4.5, 6, 9.5 and 12 flours studies after steady-state condition and the operating of the REMSMAS units conducted with the normal detention time of 6 and 12 hours studies in nonsteady-state condition. The feed solution was diluted 18 times to the raw starch wastewater in of order to maintain the proper COD (950mg/l) and BOD (450mg/l) concentration. Design parameters related to the suspended microbial growths were caculated by the equations used in the aeration-only CMAS model and these parameters used to evalute the kinetic constants in the REMSMAS process. The kinetic constant values of $Y_2,\;K_d,(\mu_{max})_s\;and\;K_s$ from Monod equations were respectively 0.78, 0.027/hr, 1.1/hr and 95mg/l in the aeration-only CMAS process. The value of the aera capacity (F) appeared to be $9.1\;mg/cm^2-day$ and the mean value of the saturation constant $(K_g)$ appeared to be 53.5 mg/l in the REMSMAs process. Also, the substrate removal .ate of the REMSMAS process was higher than that of the normal activated sludge process when this system was operated in steady-state condition. However, the rate was reduced as the critical operating day was approached.

  • PDF

Biological Treatment of Raw Water for Organics Removal (생물학적(生物學的) 처리(處理)에 의한 원수(原水)의 유기물제거(有機物除去)에 관한 연구(研究))

  • Cho, Kwang Myeung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.6 no.1
    • /
    • pp.43-50
    • /
    • 1986
  • A research was performed to examine the applicability of aerobic fixed-biofilm reactors for removal of biodegradable organics in raw waters. Crushed briquette ashes or granite were utilized as media. Experiments were carried out by feeding packed bed reactors with a synthetic raw water prepared by dissolving phenol in tap water with other inorganic nutrients. Results of the research showed that the effluent TBOD concentrations were lower than 6 mg/l when the influent BOD concentrations were kept below 50 mg/l and a detention time of about 2.7 hours was provided. The SBOD concentrations of the treated waters should be less than 5 mg/l since the effluent SS could be removed by conventional water treatment methods such as coagulation and filtration. It was also found that most of the SS in the effluents were humic materials since the effluent SS caused little BOD. This means the biofilm in the reactor was in endogenous respiration phase due to low F/M ratio. According to the results of this study, it is recommended to pretreat any raw water contaminated with biodegradable organics in an aerobic fixed biofilm reactor with a detention time of 2 to 3 hours.

  • PDF

A Study on the Inflowing Pollution Load and Material Budgets in Hampyeong Bay (함평만의 유입오염부하량 및 물질수지에 관한 연구)

  • Kim, Jong-Gu;Jang, Hyo-Sang
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.22 no.1
    • /
    • pp.1-10
    • /
    • 2016
  • In this paper, an analysis of the inflowing pollution load of the rivers in Hampyeong bay showed the average organic matter pollution loads of BOD, COD, and TOC to be 79.7 kg-BOD/day, 144.06 kg-COD/day, and 93.0 kg-TOC/day, respectively. The inflowing organic matter pollution load was the heaviest in Sonbul dike, followed by Jupo bridge and Yangman complex. With regard to season, the load characteristics were outstanding in July, the rainy period in the summer. The average inflowing pollution loads of nutrients were 20.9 kg-DIN/day, 17.1 kg-DIP/day, 148 kg-TN/day, and 37.4 kg-TP/day A comparison of the inflowing nutrients loads for each river showed the load to be the heaviest in Yangman complex, followed by Baegok bridge and Jupo bridge. In the experiment on the material budgets of Hampyeong bridge conducted using a box model, the detention time of fresh water was found to be 52.4 days, with the bay displaying the characteristics of a so dissolved inorganic nitrogen (DIN) in the nutrients material budgets, ${\Delta}DIN$ values were found to be negative, indicating the tendency of consumption and open sea leak by photosynthesis to be higher than the nitrogen that flowed in. As for dissolved inorganic phosphorus (DIP), ${\Delta}DIP$ showed positive values, indicating a tendency for accumulation as the supply through organic matter decomposition, elution load of sediments, and inflowing load of the river turned out to be higher than the consumption by phytoplankton and outflow to open sea.

Post-Chlorination Process Control based on Flow Prediction by Time Series Neural Network in Water Treatment Plant

  • Lee, HoHyun;Shin, GangWook;Hong, SungTaek;Choi, JongWoong;Chun, MyungGeun
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • v.16 no.3
    • /
    • pp.197-207
    • /
    • 2016
  • It is very important to maintain a constant chlorine concentration in the post chlorination process, which is the final step in the water treatment process (hereafter WTP) before servicing water to citizens. Even though a flow meter between the filtration basin and clear well must be installed for the post chlorination process, it is not easy to install owing to poor installation conditions. In such a case, a raw water flow meter has been used as an alternative and has led to dosage errors due to detention time. Therefore, the inlet flow to the clear well is estimated by a time series neural network for the plant without a measurement value, a new residual chlorine meter is installed in the inlet of the clear well to decrease the control period, and the proposed modeling and controller to analyze the chlorine concentration change in the well is a neuro fuzzy algorithm and cascade method. The proposed algorithm led to post chlorination and chlorination improvements of 1.75 times and 1.96 times respectively when it was applied to an operating WTP. As a result, a hygienically safer drinking water is supplied with preemptive response for the time delay and inherent characteristics of the disinfection process.