• Title/Summary/Keyword: Detailed Performance Procedures

Search Result 75, Processing Time 0.028 seconds

Comparative numerical analysis for cost and embodied carbon optimisation of steel building structures

  • Eleftheriadis, Stathis;Dunant, Cyrille F.;Drewniok, Michal P.;Rogers-Tizard, William;Kyprianou, Constantinos
    • Advances in Computational Design
    • /
    • v.3 no.4
    • /
    • pp.385-404
    • /
    • 2018
  • The study investigated an area of sustainable structural design that is often overlooked in practical engineering applications. Specifically, a novel method to simultaneously optimise the cost and embodied carbon performance of steel building structures was explored in this paper. To achieve this, a parametric design model was developed to analyse code compliant structural configurations based on project specific constraints and rigorous testing of various steel beam sections, floor construction typologies (precast or composite) and column layouts that could not be performed manually by engineering practitioners. Detailed objective functions were embedded in the model to compute the cost and life cycle carbon emissions of the different material types used in the structure. Results from a comparative numerical analysis of a real case study illustrated that the proposed optimisation approach could guide structural engineers towards areas of the solution space with realistic design configurations, enabling them to effectively evaluate trade-offs between cost and carbon performance. This significant contribution implied that the optimisation model could reduce the time required for the design and analysis of multiple structural configurations especially during the early stages of a project. Overall, the paper suggested that the deployment of automated design procedures can enhance the quality as well as the efficiency of the optimisation analysis.

Comparison of Cooling-Energy Performance Depending on the Economizer-Control Methods in an Office Building (이코노마이저 제어 방법에 따른 사무소 건물의 냉방 에너지 성능 비교)

  • Son, Jeong-Eun;Hyun, In-Tak;Lee, Jea-Ho;Lee, Kwang Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.27 no.8
    • /
    • pp.432-439
    • /
    • 2015
  • Current building procedures seek to minimize external air supplies to reduce the energy consumption of air conditioning, resulting in a high dependency on mechanical ventilation. We therefore studied an economizer-cycle system, whereby the introduction of external air saves energy. We analyzed different economizer-control methods, addressing mixed-air temperatures and outdoor-air fractions according to outdoor-air temperatures; also, we analyzed the energy consumption of the three economizer-cycle control types using detailed EnergyPlus simulation modeling. A differential enthalpy control method showed a lower energy consumption range from 5.8% to 6.2% than that of other methods during the simulated period. A differential dry-bulb control method showed a 12.7% lower energy consumption than the no-economizer method in the intermediate period, but also showed 7.1% more energy consumption during the summer period. When latent heat was not removed due to high summer humidity, we found a significant level of resultant energy consumption.

Study on icebreaking performance of the Korea icebreaker ARAON in the arctic sea

  • Kim, Hyun-Soo;Lee, Chun-Ju;Choi, Kyung-Sik;Kim, Moon-Chan
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.3 no.3
    • /
    • pp.208-215
    • /
    • 2011
  • A full-scale field trial in ice-covered sea is one of the most important tasks in the design of icebreaking ships. The first Korean icebreaking research vessel 'ARAON', after her delivery in late 2009, had a sea ice field trial in the Arctic Sea during July-August, 2010. This paper describes the test procedures and data analysis on the icebreaking performance of the IBRV ARAON. The data gathered from the icebreaking performance test in the Chukchi Sea and the Beaufort Sea during the Arctic voyage of ARAON includes the speed and engine power of the ship as well as sea ice thickness and strength data. The air temperature, wind speed and heading of the ship were also measured during each sea ice trial. The ARAON was designed to break 1 m thick level ice with a flexural strength of 630kPa at a continuous speed of 3knots. She is registered as a KR POLAR 10 class ship. The principal dimensions of ARAON are 110 m, 19 m and 6.8 m in length, breadth and draft respectively. She is equipped with four 3,500kW diesel-electric main engines and two Azipod type propulsion motors. Four sea ice trials were carried out to understand the relationship between the engine power and the ship speed, given the Arctic ice condition. The analysis shows that the ARAON was able to operate at 1.5knots in a 2.5m thick medium ice floe condition with the engine power of 5MW, and the speed reached 3.1 knots at the same ice floe condition when the power increased to 6.6MW. She showed a good performance of speed in medium ice floe compared to the speed performance in level ice. More detailed analysis is summarized in this paper.

Peliminary Performance Test for MIRIS, the Main Payload of STSAT-3

  • Han, Won-Yong;Lee, Dae-Hee;Park, Young-Sik;Nam, Uk-Won;Jeong, Woong-Seob;Ree, Chang-Hee;Moon, Bong-Kon;Park, Sung-Joon;Cha, Sang-Mok;Lee, Duk-Hang;Park, Jang-Hyun;Ka, Nung-Hyun;Seon, Kwang-Il;Yang, Sun-Choel;Park, Jong-Oh;Rhee, Seung-Wu;Lee, Hyung-Mok;Matsumoto, Toshio
    • Bulletin of the Korean Space Science Society
    • /
    • 2010.04a
    • /
    • pp.37.4-37.4
    • /
    • 2010
  • KASI is developing the MIRIS (Multi-purpose IR Imaging System), as the main payload of Science and Technology Satellite-3 (STSAT-3). The Engineering Qualification Model (EQM) of the MIRIS has been recently fabricated, and Flight Model (FM) is now in final development stage. The system performance tests have been made mainly with EQM, and partly with FM in the laboratory, including opto-mechanics test, vibration test, thermal-vacuum test and passive cooling test down to 200K, using a thermal controlled vacuum chamber. Most of the system performance test results of the MIRIS are satisfied with the required specifications and its results were reflected in development of the FM with several revisions of the system design. In this paper, we present detailed system performance test procedures of the MIRIS and its results.

  • PDF

Fast and Reliable Dynamic Common Channel Setup and Reconstruction Method for the Point-to-Point Communications in Military CR Networks (군용 인지 무선 네트워크 환경에서 점대점 통신을 위한 신속하고 신뢰성 있는 동적 공통 채널 설정 및 복원 방법)

  • Kim, Min-Gyu;Choi, Jae-Kark;Yoo, Sang-Jo;Jang, Young-Up;Jeong, Kilsoo;Lee, Kwang-Eog
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.37C no.11
    • /
    • pp.1112-1128
    • /
    • 2012
  • In cognitive radio networks, secondary users are allowed to utilize the channels currently not occupied by primary users opportunistically. Secondary users can communicate with each other using the commonly available channels (common channels) which may change dynamically based on the activity of the primary users. Even though many studies have dealt with cognitive radio behaviors, the detailed procedures for common channel configuration have not been paid much attention. In this paper, the fast and reliable dynamic common channel setup and reconstruction method for the point-to-point communications in military cognitive radio networks is proposed. The detailed time parameters are considered for common channel setup and reconstruction, such as the packet exchange time, channel request waiting time, and rendezvous time. Through numerical analyses, the delay and throughput performance of the proposed method is derived and evaluated.

Abnormality diagnosis model for nuclear power plants using two-stage gated recurrent units

  • Kim, Jae Min;Lee, Gyumin;Lee, Changyong;Lee, Seung Jun
    • Nuclear Engineering and Technology
    • /
    • v.52 no.9
    • /
    • pp.2009-2016
    • /
    • 2020
  • A nuclear power plant is a large complex system with tens of thousands of components. To ensure plant safety, the early and accurate diagnosis of abnormal situations is an important factor. To prevent misdiagnosis, operating procedures provide the anticipated symptoms of abnormal situations. While the more severe emergency situations total less than ten cases and can be diagnosed by dozens of key plant parameters, abnormal situations on the other hand include hundreds of cases and a multitude of parameters that should be considered for diagnosis. The tasks required of operators to select the appropriate operating procedure by monitoring large amounts of information within a limited amount of time can burden operators. This paper aims to develop a system that can, in a short time and with high accuracy, select the appropriate operating procedure and sub-procedure in an abnormal situation. Correspondingly, the proposed model has two levels of prediction to determine the procedure level and the detailed cause of an event. Simulations were conducted to evaluate the developed model, with results demonstrating high levels of performance. The model is expected to reduce the workload of operators in abnormal situations by providing the appropriate procedure to ultimately improve plant safety.

Engineering run of CQUEAN

  • Park, Won-Kee;Kim, Eun-Bin;Jeong, Hyeon-Ju;Kim, Jin-Young;Lim, Ju-Hee;Choi, Chang-Su;Jeon, Yi-Seul;Pak, Soo-Jong;Im, Myung-Shin
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.35 no.2
    • /
    • pp.62.1-62.1
    • /
    • 2010
  • CQUEAN (Camera for QUasars in EArly uNiverse) is an optical CCD camera system that consists of a science CCD camera, a guide CCD camera, and seven filters. In addition, a focal reducer is installed in front of the science camera to secure a larger field of view for the system. Engineering run of the system was carried out from Aug. 10, 2010 to Aug. 17, 2010, with 2.1m Otto Struve telescope at McDonald Observatory, USA, from which we investigated the characteristics and performance of the system. Bias and dark images were taken under various temperature conditions to examine the system behavior, and both twilight and dome flat images were obtained to investigate the appropriate preprocessing procedures of the data. Crude initial estimate indicated one hour integration would reach limiting magnitude of 24.2 in i-band with S/N ratio of 5, with CQUEAN at 2.1m telescope. The detailed results of the engineering run will be presented.

  • PDF

Improvement of Output Linearity of Matrix Converters with a General R-C Commutation Circuit

  • Choi, Nam-Sup;Li, Yulong;Han, Byung-Moon;Nho, Eui-Cheol;Ko, Jong-Sun
    • Journal of Power Electronics
    • /
    • v.9 no.2
    • /
    • pp.232-242
    • /
    • 2009
  • In this paper, a matrix converter with improved low frequency output performance is proposed by achieving a one-step commutation owing to a general commutation circuit applicable to n-phase to m-phase matrix converters. The commutation circuit consists of simple resister and capacitor components, leading to a very stable, reliable and robust operation. Also, it requires no extra sensing information to achieve commutation, allowing for a one-step commutation like a conventional dead time commutation. With the dead time commutation strategy applied, the distortion caused by commutation delay is analyzed and compensated, therefore leading to better output linear behavior. In this paper, detailed commutation procedures of the R-C commutation circuit are analyzed. A selection of specific semiconductor switches and commutation circuit components is also provided. Finally, the effectiveness of the proposed commutation method is verified through a two-phase to single-phase matrix converter and the feasibility of the compensation approach is shown by an open loop space vector modulated three-phase matrix converter with a passive load.

Ultrasound-guided Intervention in Lumbar Spine (요추부 초음파 유도하 중재술)

  • Moon, Sang Ho
    • The Journal of Korean Orthopaedic Ultrasound Society
    • /
    • v.6 no.2
    • /
    • pp.81-93
    • /
    • 2013
  • This review was described to investigate the feasibility of using ultrasound as an image tool for interventions of lumbar spine. This article will first provide an overview of lumbosacral spine surface anatomy and sonoanatomy. A detailed understanding of anatomy is critical for interpretation of ultrasound and procedural performance at spine. Fluoroscopy is most commonly used in interventional spine procedures, but radiation exposure is the major concern when obtaining fluoroscopic images. Ultrasound is radiation-free, is easy to use, and can provide real-time images with high accuracy. Also this device can be used in virtually any clinical setting. Ultrasound guidance offers a reliable alternative to fluoroscopy or computed tomography for lumbar interventions and can be safely performed without radiation exposure.

  • PDF

Development and Validation of an Energy Management System for an Electric Vehicle with a split Battery Storage System

  • Becker, Jan;Schaeper, Christoph;Rothgang, Susanne;Sauer, Dirk Uwe
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.4
    • /
    • pp.920-929
    • /
    • 2013
  • Within the project 'e performance' supported by the German Ministry of Education and Research (BMBF) an electric vehicle, powered by two lithium-ion battery packs of different capacity and voltage has been developed. The required Energy Management System (EMS) in this system controls the current flows of both packs independently by means of two individual dc-dc converters. It acts as an intermediary between energy storage (battery management systems-BMS) and the drivetrain controller on the vehicle control unit (VCU) as well as the on-board charger. This paper describes the most important tasks of the EMS and its interfaces to the BMS and the VCU. To validate the algorithms before integrating them into the vehicle prototype, a detailed Matlab / Simulink-model was created in the project. Test procedures and results from the simulation as well as experiences and comparisons from the real car are presented at the end.