• 제목/요약/키워드: Designer's Direct Construction

검색결과 7건 처리시간 0.019초

'곰' 주제공원 조경설계 (Bear Theme Park Design)

  • 우정상
    • 한국조경학회지
    • /
    • 제33권3호
    • /
    • pp.105-113
    • /
    • 2005
  • Human desire is required to be changed variously as time flows. A theme park which is planned to male a good memory including a variety of story, drama, and experience with one of themes is increasingly and currently broaden to be a good economic value of cultural tourism for the local autonomy institution or individual business. The plan for a theme park should be developed to give the tourist satisfaction at studious and ecology educational needs in conformity with our country's distinctive four seasons, its surrounding environment, facilities, and its contents. This design which is called 'Bear theme park' has only one theme focused on a combined effort with a landscape designer and a sculptor. It is estimated that the park must be our country's unique model of a theme park The purpose of this study is to request the designer's direct construction to participate in it by themselves, to solve any problems on the design side, to experience the real construction procedure, and to take the designer's techniques, and skills as soon as the design completed.

디자이너 브랜드 샵마스터의 CRM에 관한 연구 (CRM Marketing of Shopmasters in Designer Brand Products)

  • 이승희;이병화
    • 한국의류학회지
    • /
    • 제27권2호
    • /
    • pp.239-249
    • /
    • 2003
  • The purpose of this research was to investigate influential factors for shopmaster's CRM (Customer Relationship Management) in the designer brand products, and to indicate the future fashion marketing strategies. The questionnaires were distributed to 74 shopmasters of the Designer shop in domestic L. S and H Department stores. Descriptive statistics, factor analysis, and path analysis from Lisrel program were used to analyze the data. The results were as follows; Firstly. for shopmaster's CRM variables, four factors of customer management variables were found and labeled as interest, DB construction, contact opportunity, and materials. Also, four (actors of shopmaster's knowledge regarding apparel materials were found and labeled as professionalism, manner, sense, and persuasion. For service variables, four factors such as precision, variety, rapidity, positiveness, and convenience of shopping were found. Secondly, for the results of hypothesis, all of the independent variables had direct influences on forming the relationship with customers. Therefore, it is concluded that the main elements of Shopmaster's CRM are highly important variables in customer relationship marketing strategy.

건설현장에서 안전재해예방을 위한 발주자의 안전관리 역할 (A Study of Client's Role for Safety Management at Construction Sites)

  • 임지영;한갑규;김선국
    • 한국건축시공학회지
    • /
    • 제8권5호
    • /
    • pp.75-83
    • /
    • 2008
  • Larger and more sophisticated building construction requires more input resources such as worker, materials and devices. Growing resource volume brings risks at a construction site. The industry makes an effort to protect probable incidents at the site by organizing a safety management team. conducting a safety instruction and etc, but losses especially in the construction are higher than other industries. Major reason is that the safety management program is conducted only at the step of construction work and a root cause is not eliminated. Conventionally a concerned party shifts the blame to other parties such as constructor and site workers who are direct participants in the construction site. However, the whole causes of incidents go to the all subject of the construction not only the constructor but the client, designer and others related in the construction, and especially the clients are heavily involved in general concerns of the project. Therefore, this study is defined the role of the clients in nations and domestic condition of construction safety management is investigated. And it is analyzed surveys to prevent incidents at construction sites, and suggested the role of the clients which is classified pre and post construction, and in the middle of construction, and also categorized planning and design & construction schedule especially for the pre-construction level.

선박블록 탑재용 러그구조의 파라메트릭 설계 고찰 (Parametric Design Considerations for Lifting Lug Structure on Ship Block)

  • 함주혁
    • 한국해양공학회지
    • /
    • 제25권2호
    • /
    • pp.101-107
    • /
    • 2011
  • In view of the importance of material reduction because of the jump in oil and steel prices, structural design studies for lifting lugs were performed. Hundreds of thousands of such lifting lug structures are needed every year for ship construction. A direct design study was reviewed using the developed design system to increase the design efficiency and provide a way of directly inserting a designer's decisions into the design system process. In order to understand the design efficiency and convenience of a lug structure, parametric studies for prototype lug shapes were performed using the developed design system. From these design studies, various patterns of design parameters for the lug structure according to changes in the main plate length were examined. Based on these parametric study results, design guides were developed for more efficiently suggesting structural data for enormous lug structures. Additionally, a more detailed structural analysis through local strength evaluations will be performed to verify the efficiency of the optimum structural design for a lug structure.

런던아이의 디자인 전개와 건립과정에 관한 연구 (A Study on the Design Development and Construction Process in British Airways London Eye)

  • 우대성
    • 건축역사연구
    • /
    • 제15권1호
    • /
    • pp.7-27
    • /
    • 2006
  • This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.

  • PDF

광주광역시(光州廣域市) 패션상권(商圈) 조사연구(調査硏究) - 패션상권(商圈)의 분포(分布)와 특성(特性)을 중심(中心)으로 - (Fashion Market Research of Kwangju Metropolitan City - Focusing on the Distribution and Characteristics of Each Market -)

  • 배수정;최미성
    • 패션비즈니스
    • /
    • 제5권2호
    • /
    • pp.87-104
    • /
    • 2001
  • The purpose of this study is to understand the distributions of fashion market and it's characteristics by investigating the attributes and changes of three representative fashion markets i. e. Chungjang Street Market, Underground Shopping arcades, Department Stores in Kwangju Metropolitan city. This study might contribute to the construction of more attractive fashion markets and also to consumer convenience by providing information about fashion. The method of investigation is by direct market visiting and interview from 2000. 7. 11 until 7. 30. The result is as follows; 1. Chungjang Street: This is the most famous and fashionable area, situated mainly on Chungjang street and Hwangkum-dong. The various kind of designer's boutiques, national brands, wedding shops, multi-shops etc. take place. Teenagers and people in their early twenties are the main customers. This point should be born in mind in a strategy of marketing. 2. Underground Shopping arcades: This market is open to customers of all ages and to the passengers crossing the streets and the purposeful visitors, even in rainy or snow days. However it is hard for novices to find it. 3. Department Stores: There are three department stores which are very competitive with each other by granting not only spacious and comfortable shopping areas but also places for children and cultural activities. The strategy of exhibiting unique items unparalleled in it's quality, might be needed with providing a comfortable parking lot, high quality commodes, appropriate sales program and more effective sales managements.

  • PDF

다목적함수 최적화기법을 이용한 유조선의 최적구조설계 (Optimum Structural Design of Tankers Using Multi-objective Optimization Technique)

  • 신상훈;장창두;송하철
    • 한국전산구조공학회논문집
    • /
    • 제15권4호
    • /
    • pp.591-598
    • /
    • 2002
  • 공학적 설계에 있어 많은 문제들은 몇 가지 목적함수들을 동시에 최소화하여야 할 필요가 있을 경우가 있다. 선박설계에 있어, 종래에는 자재비 경감과 재화중량 증가를 위해 최소중량설계가 구조 설계의 주된 목적이었으나, 값싼 노동력을 내세운 후발 조선국과의 치열한 국제 경쟁을 극복하기 위해서는 보다 경제성 있는 선박 건조 기술 개발이 선행되어야 할 것이다. 이에 따라 본 연구에서는 다목적함수 최적화기법을 이용한 선체 구조의 보다 합리적인 설계 방안에 대한 연구를 수행하여 실제 건조된 유조선을 대상으로 중량, 건조비 등의 경제성을 비교 평가하였다. 다목적 함수로는 유조선의 중량과 건조비로 하였으며 최적화 기법으로는 확률론적 탐색법인 ES(Evolution Strategies)를 이용하였다. 건조비 모델은 상대 건조비 개념을 도입하였고, 종강도 부재는 선급규정에 의해, 횡강도 및 횡격벽 부재는 직접해석법인 일반화된 경사처짐법을 사용하여 설계에 적용하였다. 다목적함수 최적화 결과로부터 도출된 Pareto 최적 설계점들에 대하여, 요구운임률을 각각 산정함으로써 이들 최적 설계점들 중에서 가장 경제성이 뛰어난 선박 설계 방안을 제시하였다.