• Title/Summary/Keyword: Design water level

Search Result 855, Processing Time 0.038 seconds

Water Level Intelligent Controller Design of Power Plant Drum (발전기 드럼의 수위 지능 제어기 설계)

  • Hong, Hyun-Mun;Lee, Bong-Seob
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.10 no.4
    • /
    • pp.271-274
    • /
    • 2007
  • In this paper, we propose a intelligent controller design method for the water level control of the power plant drum in the form of nonminimum phase system. The proposed method is based on T. Takagi and M. Sugeno's fuzzy model. And we illustrate the improved characteristics as the simulation results, comparing with the conventional the PID and LQ controller design method.

  • PDF

Robust $H_{\infty}$ Controller Design for Steam Generator Water Level Control using Mixed $H_{\infty}$ Optimization Method (혼합 $H_{\infty}$ 최적화 기법을 이용한 견실 $H_{\infty}$ 증기발생기 수위제어기 설계)

  • 서성환;조희수;박홍배
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.5 no.3
    • /
    • pp.363-369
    • /
    • 1999
  • In this paper, we design the robust $H_{\infty}$ controller for water level control of steam generator using a mixed $H_{\infty}$ optimization with model-matching method. Firstly we choose the desired model which has good disturbance rejection performance. Secondly we design a stabilizing controller to keep the model-matching error small and also provide sufficiently large stability margin against additive perturbations of the nominal plant. Simulation results show that proposed robust $H_{\infty}$ controller at specific power operation has satisfactory performances against the variations of load power, steam flow rate, primary circuit coolant temperature, and feedwater temperature. It can be also observed that the proposed robust $H_{\infty}$ controller exhibits better robust stability than conventional PI controller.

  • PDF

Fuzzy Controller Design for Water level Control of Power Plant Drum (화력발전소 드럼의 수위제어를 위한 퍼지 제어기의 설계)

  • 이상혁
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.17 no.1
    • /
    • pp.25-30
    • /
    • 2003
  • In this paper, we propose a fuzzy controller design method for the water level control of the power plant drum in the form of nominimum phase system The proposed method is based on T. Takagi and H. Sugeno's fuzzy model. And we illustrate the improved characteristics as the simulation results, comparing with the conventional the PID and LQ controller design methods.

A Study on the Limit of Submerged Flow in Side Channel Spilway (측수로 여수토의 체류한계에 관한 연구)

  • 백은기
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.14 no.3
    • /
    • pp.2716-2725
    • /
    • 1972
  • Side channel spillways based on Hinds theory were tested. Surface water level at the beginning point of side channel is the same as the crest level of weir in the usual design. Here, side channel section were moved upwards $\frac{1}{2}$ of the total head on the crest and test(revised experiment) were made. In the revised experiments, coefficients of discharge for design flood (Q) were the same with that of original design experiments. In case of 1.2Q a little influence of submergence were appeared, coefficients of discharge were decreased to be about 97.6% of that of original design experiments, therefore, Reservoir flood water level become higher about 2-3cm than original case. So revised design can be used for actual purpose and it will brings much savings in construction cost of side channel spillway.

  • PDF

THE ANALYTIC ANALYSIS OF THE CORE INJECTION COOLING FLOW RATE FOR EMERGENCY WATER SUPPLY SYSTEM IN HANARO (하나로 비상 보충수 공급계통의 노심 주입 냉각유량 해석)

  • Park Yong-Chul;Kim Bong-Soo;Kim Kyung-Ryun;Wu Jong-Sub
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2005.10a
    • /
    • pp.39-44
    • /
    • 2005
  • In HANARO, a multi-purpose research reactor of 30 MWth, the emergency water supply system consists essentially of an emergency water storage tank located in the level of about thirteen meter (13 m) above the reactor core, a three inch ('3\%') diameter water injection pipe line including injection valves from the tank to the reactor cooling inlet pipe and a test loop to do periodic system performance test. When the water level of the reactor pool comes down to the extremely low due to a loss of reactor pool water accident the emergency water stored in the tank should be fed to the core by the gravity force and at that time the design flow rate is eleven point four kilogram per second (11.4 kg/s). But it is impossible periodically to measure the injection flow rate under the emergency condition because the normal water level should be maintained during the reactor operation. This paper describes a flow network analysis to simulate the flow rate under the emergency condition. As results, it was confirmed through the analysis results that the calculated flow rate agrees with the design requirement under the emergency condition.

  • PDF

Determine the Length of the Side-Weir of Side-Weir Detention Basin Considering the Uncertainty of the Water Level in River (하천 수위 예측의 불확실성을 고려한 강변저류지 횡월류부 길이 결정 기법)

  • Kim, Seojun;Kim, Sanghyuk;Yoon, Byungman
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.8
    • /
    • pp.673-683
    • /
    • 2015
  • The existing flood protection in rivers has shown the limitation due to the urbanization around rivers and the abnormal climate. Thus, the demand for the constructions of side-weir detention basin are being increased as a part of integrated watershed flood protection plan. It is necessary to estimate the quantitative flood-control effect for including the side-weir detention basin in flood-control measures. For the determination, it is required to reduce the uncertainty of the design factors which can affect the flood-control effect of side-weir detention basin. Among the factors, however, the water level in river always contains uncertainty. Therefore, the design method considering the uncertainty is required. For the reasons, the design method considering uncertainty of the water level in river is suggested in this study with using the length of side-weir which is relatively easy-determinable by designers. Therefore, it is examined how the variation of the length of side-weir can affect the flood-control effect, using HEC-RAS, and then the method to determine the side-weir length considering the uncertainty of the water level in river through results from analyses. Since the uncertainty of the water level in river can be taken into account in the suggested design method, it is evaluated that the design method is more effective to suggest the flood-control effect of the side-weir type detention basin with higher safety side.

Uncertainty of Evaluating Design Flood and Mitigation Plan at Downstream of Imjin River (감조하천 홍수위 계산의 불확실성과 저감 대안 - 임진강 하류를 대상으로)

  • Baek, Kyong Oh;Kwon, Hyek Won
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.2
    • /
    • pp.132-137
    • /
    • 2018
  • Compared with general rivers, fluctuations of the water level and the river bed are severe in the tidal river. In hydro-dynamic aspect, such fluctuation gives different river-bed data to us according to observing period. The time-dependent river-bed data and pre-estimation of the Manning's roughness coefficient which is the key factor of numerical modelling induces uncertainty of evaluating the design flood level. Thus it is necessary to pay more attention to calculate the flood level at tidal rivers than at general rivers. In this study, downstream of the Imjin River where is affected by tide of the West Sea selected as a study site. From the numerical modelling, it was shown that the unsteady simulation gave considerable mitigation of the water level from the starting point to 15 km upstream compared to the steady simulation. Either making a detention pond or optional dredging was not effective to mitigate the flood level at Gugok - Majung region where is located in the downstream of the Imjin River. Therefore, a more sophisticated approach is required to evaluate the design flood level estimation before constructive measures adopted in general rivers when establishing the flood control plan in a tidal river.

Water Level Variation Analysis in the Cooling Water Discharge Channel of Power Plant due to Installation of Ocean Small Hydropower Plant (해양소수력 건설에 따른 방류수로의 수위 변화 특성 분석)

  • Kang, Keum-Seok;Kim, Ji-Young;Ryu, Moo-Sung
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.21 no.5
    • /
    • pp.391-404
    • /
    • 2009
  • A small hydropower plant(SHP) using cooling water discharged from the power plant was constructed in Samcheonpo. This study presents predicted and measured hydrological data in the construction process of small hydropower plant in order to evaluate characteristics of water level variation of cooling water discharge channel which is a key factor in the design of SHP since the water level rise of channel is related to impact on circulating water system of the existing power plant. Various methods were applied for prediction of water level variation in the design stage from simple empirical formula to sophisticated 3-dimensional CFD method. Measured results reveal that mean value was similar between measured and predicted, but measured results were larger than predicted in deviation. Moreover, simple formula, i.e. standard weir equation and Honma equation, were more useful before installation of SHP, but sophisticated methods during operation of SHP.

Comparative Study of Flow Profiles & Discharge due to Rainfall Frequency Analysis (강우빈도 해석을 통한 하천 수리$\cdot$수문량 비교 연구)

  • Seo Kyu Woo;Lee In Rock;Won Chang Hee;Shim Bong Joo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2005.05b
    • /
    • pp.1533-1537
    • /
    • 2005
  • The recent rainfall has happened to exceed the design rainfall after 1990 often, due to the characteristic of the rain to be changed. So, it is failing the ability safety of flood defense equipments to exist. This study analyzed the rainfall of Busan in 2003 since 1961 through the FARD2002(Frequency Analysis of Rainfall Duration). The result is equal to the thing which the design rainfall increased a little since 1991. The change of design rainfall created the result to be a flood discharge increase. This study investigated about the impact to influence on the river bank according to the change of flood discharge, the rainfall pattern change as well. This study used the program of HEC-RAS with HEC-HMS and calculated flood discharge with flood level of river. The result is equal to the thing which the computation became a flood level which exceed 50year(River design criteria-Korea water resources association 2002) criteria with 30year(River establishment criteria-Ministry of construction & transportation 1993), because of an area of impermeability increased of model basin.

  • PDF

Performance Evaluation of Ocean Small Hydropower Plant by Analyzing Water Level and Flow Rate of Circulating Water (방류수의 수위 및 유량 분석을 통한 해양 소수력 성능평가)

  • Kang, Keum-Seok;Kim, Ji-Young;Ryu, Moo-Sung
    • New & Renewable Energy
    • /
    • v.5 no.3
    • /
    • pp.32-39
    • /
    • 2009
  • The Samcheonpo ocean small hydropower plant (SHP) has a special feature of using marginal hydraulic head of circulating water system of fossil fuel power plant as a power source and having the characteristics of general hydropower generation and tidal power generation as well. Also, it contributes to reducing green house gases and developing clean energy source by recycling circulating water energy otherwise dissipated into the ocean. The efficiency of small hydropower plant is directly affected by effective head and flow rate of discharged water. Therefore, the efficiency characteristics of ocean hydropower plant are analyzed with the variation of water level and flow rate of discharged water, which is based on the accumulated operation data of the Samcheonpo hydropower plant. After the start of small hydropower plant operation, definite rise of water level was observed. As a result of flow pattern change from free flow to submerged flow, the instability of water surface in overall open channel is increased but it doesn't reach the extent of overflowing channel or having an effect on circulation system. Performance evaluation result shows that the generating power and efficiency of small hydropower exceeds design requirements in all conditions. Analysis results of CWP's water flow rate verify that the amount of flowing water is measured less and the highest efficiency of small hydropower plant is achieved when the effective head has its maximum value. In conclusion, efficiency curve derived from water flow rate considering tidal level shows the best fitting result with design criteria curve and it is verified that overall efficiency of hydropower system is satisfactory.

  • PDF