Urban streams have been severely degraded with wastewater and concrete structure over a prolonged period. The Chonggyecheon Restoration Project recovered a stream in the downtown Seoul with landscaping, plantings and bridges after the cover concrete and elevated asphalt road were removed. The project has been criticized partly because it is not an ecological restoration but rather the development of an urban park with an unnaturally straight flowing stream, artificial building structures, and artificial water pumping from the Han River. Nevertheless, the public have praised the project and almost 100,000 visitors per day come to see the reeds, catfish, and ducks. The stream restoration project is attractive to central and regional government decision makers because it increases the public concern of landscape amenity. Several projects such as Sanjichon and Kaeumjungchon are on going and proposed. These projects have a common and different respect in scope and procedure. The Chonggyecheon project in the process of environmental impact assessment (EIA) and prior environmental review system (PERS) reviewed the environmental impacts before development. Kaeumjungchon in the PERS and Sanjichon without EIA and PERS are reviewed. EIA and PERS systems contribute to checking the ecological sustainability of the restoration projects. A stream restoration project is a very complex task, so an integrated approach from plan to project is needed for ecologically sound restoration. Ecological stream restoration requires 1) an assessment of the entire stream ecosystem 2) establishing an ecologically sound management system of the stream reflecting not only benefits for people but also flora and fauna; 3) developing the site-specific design criteria and construction techniques including habitat restoration, flood plains conservation, and fluvial management; 4) considering the stream watershed in land use plan, EIA, PERS, and strategic environmental assessment (SEA). Additionally the process needs to develop the methodologies to enhance stakeholder's participation during planning, construction, and monitoring.
국내 건설생산체계는 설계단계에 시공성의 반영이 어려워 시공단계에서 많은 시행착오와 잦은 선계변경이 요구되고 있다 특히 불확실성이 높은 도심지 건축될, 그 중에서도 초고층 복합 건물 프로젝트의 경우, 시공과정을 반영한 설계의 중요성은 더욱 중요한 요소가 된다. 본 연구에서는 국내 정보분류체계를 근간으로 기초조사를 통하여 현장의 시공계획에 필요한 데이터를 수집 이를 시스템화 할 수 있는 방안을 모색하였다. 또한, 이를 본 시스템에 적용하여 3D CAD와 공사 계획 및 시뮬레이션 시스템으로 공정 시뮬레이션 및 타워 크레인 시뮬레이션을 구현하여 초고층 공사 수행시 발생할 수 있는 문제점을 미리 검토 및 해결하여 초고층 프로젝트 공사의 합리화와 생산성 향상을 위한 공사관리시스템을 실제 프로젝트에 구현하였다.
최근 건설 프로젝트가 대형화 복잡화됨에 따라 단일 프로젝트의 건설 사업비 규모가 증가하는 반면 IT 산업의 발달과 더불어 건설현장에서 발생하는 다양한 자료 축적이 쉬워지고 있다. 따라서 건설공사 라이프싸이클 관점에서 축적된 실적 데이터를 활용하여 생산성을 향상시키기 위한 연구가 활발히 진행 중이다. 최근 건설사업관리를 위해서 많이 사용하고 있는 PMIS(Project Management Information System)는 시공단계에서 데이터의 축적과 활용에 많은 편리함을 준다. 그러나 대부분의 PMIS는 시공단계에 제한되어 있으며 기획, 설계 및 유지관리의 단계까지는 적용되지 않고 있는 실정이다. 본 논문에서는 기획, 설계, 시공, 유지보수 단계까지 관리를 위한 효율적인 하나의 방안으로 BIM(Building Information Modeling) 기반의 PMIS인 BPMS(BIM-based Project Management System)를 제시한다. BPMS는 대상물의 설계 및 시공정보를 포함하여 건설 생애주기 관점에서 사업관리를 지원하고자 개발되고 있다.
2011년과 2012년 국내건설기업의 해외건설시장 공종별 수주구조는 플랜트분야가 약 645억 달러(전체의 73%)로 타 건설분야에 비해 압도적이며 수주금액 또한 역대 최고액을 기록하였다. 이러한 플랜트 건설시장의 비중과 수주율은 당분간 지속될 전망이다. 하지만 국내 기업이 보유한 플랜트 건설기술은 상세설계와 건설시공 분야에서 비교적 높은 경쟁력을 보이나, 엔지니어링의 원천기술 및 기본설계 분야와 사업관리 분야는 기술 선진국의 60%~70% 내외이다. 국내 기업의 사업관리 경쟁력을 향상시키기 위해 플랜트 건설 공정관리 기술의 고도화와 프로젝트 수행과정에서 발생하는 리스크의 체계적인 평가 방안을 마련하는 것이 시급하다. 본 연구에서는 산업플랜트 건설프로젝트의 주요 공정 시퀀스 모델을 개발하여 프로젝트 초기에 공정계획 수립의 주요 항목설정과 공사의 흐름 및 공정 간의 연관관계 등을 명확하게 정립할 수 있도록 하였다. 특히 공종별 주요 액티비티 분석을 통해 주요 공정 시퀀스를 도출하였고, 퍼지이론을 활용하여 프로젝트 수행 단계별 위험도 평가 방안의 개발 및 중점 관리 공정 프로세스를 제시함으로써 산업플랜트 건설 프로젝트 공정개발과정과 주공정 수행과정의 리스크 분석에 용이성을 향상할 수 하도록 하였다.
Integrated Project Delivery는 기존 발주방식 (설계시공일괄 발주방식, 설계시공분리 발주방식, 건설사업관리 발주방식)의 대안으로 제시되고 있다. 다수의 국외 IPD 관련 연구들은 IPD의 계약적 측면뿐만 아니라 IPD의 업무수행방식 측면에서도 IPD 연구에 접근하고 있다. 그러나 대부분의 국내 IPD 관련 연구들은 IPD의 계약적 특성에만 초점을 맞추고 이것이 심각한 문제인 것으로 간주하고 있는데, 현재 국내 규제와 법적 한계로 인해 다자간 계약이 불가능하므로 이런 국내 건설환경에서는 IPD가 도입되기 어렵다는 주장이다. 하지만 본 연구는 국내 시스템이 변화하길 기다리는 대신 IPD가 업무수행방식 측면에서 도입될 수 있음을 보여주고자 한다. 따라서 이 연구의 목표는 IPD 계약이 체결되지 않은 프로젝트들의 성과와 IPD 계약이 체결된 프로젝트의 성과를 비교함으로써 IPD 계약적 특성이 IPD를 적용한 프로젝트에서 필수조건이 아님을 보이는 것이다. 본 연구는 미국 5개 IPD 사례와 국내 1개 프로젝트의 참여자들로부터 설문데이터를 확보하여 사례조사를 두 단계로 수행하였다. 첫째로 IPD 계약을 체결하지 않은 미국 4개 사례의 IPD 특징요소 적용여부와 그에 따른 성과를 비교하고, 둘째로 IPD 계약을 체결한 미국 사례와 IPD 특징요소를 프로젝트에 도입한 국내 사례에 대해서 첫 번째 단계와 같은 내용을 비교하였다. 연구의 결과로 IPD 특성의 자유롭고 유연한 도입을 통해 국내 건설의 생산성 도모와 협업환경 조성을 통한 건설 환경의 개선 및 발주자와의 신뢰관계 구축에 도움을 줄 것으로 기대한다.
The domestic construction industry in the last 30 to 40 years has accumulated a large stock of buildings that are quickly and there physical age is quickly becoming apparent. Contemporary changes in architecture are fueling changes driven by the increased demand for these new services and facilities. The cost of energy and raw materials are on the rise, and dealing with the waist generated from the creation of new buildings is an emerging problem in the industry today. Thus, building remodeling has emerged as an alternative do to its increased efficiency regarding material usage. The participation of users in the development stages of a remodeling project is essential to its effective implementation in projects. The BIM model used for the design process of building remodeling is the most effective way, due to the increased efficiency gained in many areas. This study will examine a pilot project where a BIM based process was used in the remodeling of an apartment.
An exhibit entitled 'Revelatory Landscapes' was held at the San Francisco Museum of Modem Art from May 5 to October 14, 2001. For this Museum's rot off-site outdoor exhibition, five outstanding design teams-Kathryn Gustafson, Hargreaves Associates, Hood Design, Tom Leader Studio, and ADOBE LA-created site-specific installations in Berkeley, Oakland, San Jose, and the San Francisco Bay Area. Each project showcased a hybridization of environmental art and landscape design. The main content revealed through revelatory landscapes were the natural, cultural, and historical palimpsest of the sites-particularly as related to the history of minorities such as Native American, African Americans and Latin Americans-as well as the every day life of ordinary people. To represent these ideas, a juxtaposition of the past and the present was broadly applied. Furthermore, the use of dramatic colors, textures, and forms in consideration of materials coupled with the revelation of natural elements such as wind and sunlight accelerated the effect of this juxtaposition. Every project of the Revelatory Landscapes exhibit requires a phenomenological experience to be appreciated. Via the five senses, these experiences cause a synesthetic experience beyond solely the visual. By examining the projects of 'Revelatory landscapes', the threshold for a new blending between environmental art and landscape design as well as new landscape design strategies that overcome the dichotomy between nature and culture will change and evolve.
본 연구는 기존 시공단계 중심의 VR시뮬레이션 활용체계를 설계단계까지 확장하여 도로의 최적 설계정보 지원을 위한 시각화 분석 기능을 개발하는 것이 목적이다. 연구에서는 설계지원을 위한 VR기능으로 도보 선형(alignment)에 의한 토공 시뮬레이션, 대안 노선 선정 시뮬레이션 구조물 타입 선정 시뮬레이션 및 지하시설물 분석 시뮬레이션 기능들을 제안하고 있다. 이러한 VR시뮬레이션 기능을 통해 노선 및 토공 상태의 시각적 확인이 가능하고, 대안 노선의 가상적인 모의 배치를 수행함으로써 최적 설계노선을 선정할 수 있다. 이를 위해 본 연구에서는 도로설계정보 지원을 위한 VR시뮬레이션 기능 개발 방법론 및 시스템(VR Presenter)을 구현하며, VR기능을 적용한 개선된 도로설계 프로세스를 제안하고 있다.
With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.
The purpose of this study is to identify the characteristics of the community design ordinance in Seoul as view of the community design activation and to seek improvement. The findings of this study are as followings; Most of the provisions of the ordinance, such as the concept of community design, the basic plan, and the contents of the project, are defined in a similar manner. From the establishment of the concept of community design, it is necessary to establish the regulations that reflect the actual situation and characteristics of the village. In addition to physical facilities improvement, the ordinance should include support for securing space at the core center, which plays an important role in revitalizing community design. Step-by-step approaches are needed to understand the residents at the beginning of the project, because there is not enough practical support related to resident capacity and community solidarity. As the importance of the competent residents increases, the support elements related to humanware areas should also be expanded. In particular, the supporting process and contents for the support system and program for the training of village leaders and the securing of professional manpower should be well established.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.