• 제목/요약/키워드: Design project

검색결과 4,041건 처리시간 0.031초

인간의 삶의 질 증진에 공헌한 화학자 조사하기 프로젝트 수업의 효과 (A Study on the Effect of the Project of Examining the Chemist Contributing to the Quality of Human Life)

  • 김도욱
    • 한국초등과학교육학회지:초등과학교육
    • /
    • 제30권1호
    • /
    • pp.71-82
    • /
    • 2011
  • The purpose of this study was to evaluate the change of chemistry-related attitude of preliminary teachers, after the project of examining chemists contributing to the quality of human life. One group pretest-posttest was used in this study as an experimental design. Before examining the chemist, few preliminary teachers have the knowledge about the chemist contributing to the quality of human life. After the project of examining the chemist, the affirmative awareness on the chemist on preliminary teachers is increased. This result shows that the project of examining the chemist contributing to quality of life can give to make the positive attitude of preliminary teachers on chemistry, and to apply the useful tool related to STS curriculum which is not described effectively in science or chemistry textbook.

기획특집: 경부고속철도의 성과와 교훈 -시행착오와 혼선$\ldots$ 향후 사업의 소중한 교훈으로- (Experiences & Lessons Learned from Kyeongbu Highspeed Rail Project - Getting beyond Trials & Erros : Valuable Knowledges for Future Project -)

  • 강기동
    • 기술사
    • /
    • 제43권6호
    • /
    • pp.23-26
    • /
    • 2010
  • The first high speed railway in Korea was opened to traffic on April 1, 2004 and the second phase will be opened on November 1. 2010. Many technical problems that occurred during construction have been solved. In its early period of project, difficulties were encountered in design, construction of high speed line. because most of Korean railway engineers were familiar only with conventional railway. Now they understand the various phenomena occuring during operation of the KTX and have accumulated extensive technical knowhow. Valuable experiences and knowledges that have been obtained from frials and errors will lead to further improvement for the future project.

  • PDF

Toward the Application of a Critical-Chain-Project-Management-based Framework on Max-plus Linear Systems

  • Takahashi, Hirotaka;Goto, Hiroyuki;Kasahara, Munenori
    • Industrial Engineering and Management Systems
    • /
    • 제8권3호
    • /
    • pp.155-161
    • /
    • 2009
  • We focus on discrete event systems with a structure of parallel processing, synchronization, and no-concurrency. We use max-plus algebra, which is an effective approach for controller design for this type of system, for modeling and formulation. Since a typical feature of this type of system is that the initial schedule is frequently changed due to unpredictable disturbances, we use a simple model and numerical examples to examine the possibility of applying the concepts of the feeding buffer and the project buffer of critical chain project management (CCPM) on max-plus linear discrete event systems in order to control the occurrence of an undesirable state change. The application of a CCPM-based framework on a max-plus linear discrete event system was proven to be effective.

원자력연구개발사업의 공정관리 적용 사례 연구 (A Study on the Application of Scheduling & Planning for Nuclear R &D Projects : Cas of LMR Project)

  • 한도희
    • 기술혁신학회지
    • /
    • 제2권3호
    • /
    • pp.118-128
    • /
    • 1999
  • This study attempts to provide an efficient method for managing the Nuclear R&D projects. It should be noted that the technology and experiences to develop a well-balanced plan and mon-itoring for the R&D project are not yet well established when compared with the commercial con-structionand engineering projects. This study recommends that the R&D project manager utilize the scheduling techniques to establish an integral management system taking in to account the un-certainties in the research environment. Based upon the results of a case study for the Liquid Metal Reactor Design Technology Development Project which is led by the KAERI this study also con-firms that it is possible to run the national nuclear R&D projects with the Scheduling & Planning.

  • PDF

R & D 프로잭트의 Feasibility 추정 시스템설계를 위한 추정치 종합화 모형의 구축 (A New Model on Integration of Feasibility Estimates for Designing FEIT System in R & D Project)

  • 권철신
    • 한국경영과학회지
    • /
    • 제15권1호
    • /
    • pp.47-61
    • /
    • 1990
  • The purpose of this study is to construct a new model named Communication Consensus Value Weighted (CCVW) model based on inter-personal technical communication within a project team, and to design Feasibility Estimates Integrated Terminal System (FEITS) which is a subsystem of R & D Project Planning System/System Alternatives Feasibility Estimation System (RDPPL/SAFES) using the model as a key function for feasibility estimation in that system. This new model aims to integrate technical feasibility estimated by several estimators in the lowest level as the project work breakdown structure which is the indentical conception of a terminal system in RDPPL. The process to obtain the feasibility estimate integrated is presented in this paper.

  • PDF

게이트 도장 품질 개선을 위한 6시그마 프로젝트 사례 연구 (A Case Study of a Six Sigma Project for Improving Gate Painting Quality)

  • 홍성훈;최익준
    • 품질경영학회지
    • /
    • 제34권1호
    • /
    • pp.1-12
    • /
    • 2006
  • This paper presents a six sigma project for improving gate painting quality in a medium-sized automotive part company. The project follows a disciplined process of five macro phases: Define, Measure, Analyze, Improve, and Control. A CTQ(critical to quality) is determined based on COPQ(cost of poor quality) analysis, and a process map is utilized for identifying process input variables. Three KPIV s(key process input variable) are selected; Painting Temperature, Painting Quantity, and Painting Viscosity, and DOE(design of experiments) is utilized for finding the optimal process conditions for three KPIVs. MINITAB software is used for data analyses and DOE. The sigma level of defects rate has improved from 2.93 to 3.66.

A Study on Constructing Common Database for Supporting Urban Rail Transit Project

  • Lee, Young-Hoon;Lee, Jae-Chon
    • 조명전기설비학회논문지
    • /
    • 제23권11호
    • /
    • pp.44-51
    • /
    • 2009
  • A variety of Urban Rail Transit (URT) systems have been operating and they have different technology bases, causing a lot of difficulties in taking measures against trouble, training, upgrading, interoperability and so on. As such, a standardization project has been carried out to solve the problems by setting up the national standards for URT systems. A common database was built to provide the integrated engineering environment to the community of URT project. This paper discusses the design of the database and how it can be utilized in the successful promotion of the project. The products of the projects are stored into the database with traceability management to be referred to by other new URT projects for reusing and sharing the acquired knowledge through cross organizations.

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

데이터 사전 관리를 통한 프로젝트 관리 기법 (Project Management Methodology using Managing Data Dictionary)

  • 이병엽;박용훈;유재수
    • 한국콘텐츠학회논문지
    • /
    • 제9권3호
    • /
    • pp.72-80
    • /
    • 2009
  • 기업은 비즈니스 프로세스 조정 또는 기업의 전략적 목적을 달성하기 위하여 정보 기술을 도입하고 있다. 또한 데이터 일관성에 대한 요구에 대해서는, 소프트웨어 개발에 적용되어 표준화 규율을 채택하여 이를 따르는 소프트웨어 개발 회사들이 늘어나고 있다. 이는 사용자들의 요구일 뿐만 아니라 이러한 규율을 채택함으로써 적은 비용으로 더 나은 결과물을 얻을 수 있기 때문이다. 프로젝트 관리 도구를 사용한 체계적이고 일관적인 소프트웨어의 개발은 더욱 더 중요한 의미를 가지게 된다. 따라서, 본 논문은 효율적인 데이터 사전관리를 통하여 효과적으로 시스템 구축 지원을 할 수 있는 프로젝트 관리 기법에 대하여 기술한다.

시스템공화 전산지원도구를 이용한 시스템 설계 및 관리 데이터의 통합 (Integration of System Design and Management Data Using CASE Tool)

  • 이우동
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 B
    • /
    • pp.1097-1098
    • /
    • 2006
  • This study investigated the needs and effectiveness of the application of Computer-Aided Systems Engineering Tool in order to enhance the chance of success of the large and complex system development projects like City Train System. Furthermore, it was shown that the merits of Systems Engineering and Project Management must be complementary to each other in their interaction in a project. Especially, for the project plans must be executed based on the fully understood system being developed, the technical and management data of the system development need be integrated and be able to support exact and rapid decision making of project planning. As an alternative solution approach, a model for development knowledge capture integrating both technical and management data of system development was proposed using Computer Aided Systems Engineering tool-Cradle.

  • PDF