• 제목/요약/키워드: Design project

검색결과 4,019건 처리시간 0.037초

건설산업에서의 PLM 설계에 관한 연구 (A Study on the PLM for Construction Industry)

  • 노상도;김건연;이상석;김종환;정승호;이광명
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.253-258
    • /
    • 2008
  • PLM(Product Lifecycle Management) is one of innovative manufacturing paradigms which leverages e-business technologies to allow a company's product content to be developed and integrated with all company business process through the extended enterprise. In these days, most construction companies also make an effort to enhance their systems for creating, sharing and managing information to improve business efficiency through entire lifecycle of project execution. Because of different needs, business process and diverse engineering activities such as design, structural analysis, installing simulation, documents and data managements, a new paradigm for construction companies is needed to manage and share the entire workflow, and information in total project lifecycle. In this paper, we conducted user requirement and business process analysis of the construction to design architecture of C-PLM(Construction Project Lifecycle management) and implement a prototype of C-PLM systems based on commercial PDM system.

  • PDF

프로젝트 기반 학습의 STEAM 융합 교육과정 설계 -안드로이드 기반 동력 전달 학습 콘텐츠 개발 및 활용 중심으로- (Design of the STEAM Integrated Curriculum based on Project-based Learning -Focus on Android-based Learning Content Development and Utilization-)

  • 김은길;김종훈
    • 정보교육학회논문지
    • /
    • 제15권4호
    • /
    • pp.551-560
    • /
    • 2011
  • STEAM 교육은 과학 기술 공학 예술 수학 교과의 연계 지도를 통해 학습자의 과학기술에 대한 흥미와 이해를 높이고 융합적 사고와 문제해결능력을 배양할 수 있도록 주제 중심의 학습 내용으로 교육과정을 재구성하여 가르치는 것이다. 따라서 본 논문에서는 초등학교에서 운영할 수 있는 STEAM 교육과정을 프로젝트 기반 학습 형태로 설계하고 운영에 필요한 교수 학습 자료를 제작하였다. 또한 STEAM 교육에서 IT 기술이 모의실험 도구로 활용될 수 있는 방안을 모색하여 프로젝트 기반 학습의 교육 효과를 높이고자 안드로이드 기반에서 애플리케이션을 개발하였다.

  • PDF

4CM기반의 건설사업관리 시스템 개발 및 구현 (The Design and Implementation of Project Management Information System based on 4CM)

  • 최성연;김재수
    • 디지털산업정보학회논문지
    • /
    • 제7권2호
    • /
    • pp.101-113
    • /
    • 2011
  • As information and communication technology advances driving the rapid evolution of e-commerce and e-business becomes on effective marketing means for both business and institutions, the industry deals with these changes and has a profound, positive impact on production and operations management. But the construction industry falls behind compared with other industries in productivity, informationalization, automatization and globalization. Especially even though the informationalization is inevitable in any developing society, a number of construction industries can hardly cope with it properly. As the construction industry gets informationalized and advanced, the introduction of PMIS (Project Management Information System) is making progress actively for the effective construction project control and productivity improvement in construction. With the government officials' political promotion and the rising desire for construction informationalization of enterprises, many are attempting to develop integrated systems or to replace a previous system with a more advanced alternative. Construction Industry, however, has the peculiar properties that the period for the completion of construction is limited and on top of that, most of its data processing systems are seen as being an early stage in the design of management information systems. As a result, there are extremely few applications in the construction industry. In this paper, we propose the PMIS system based on new model 4CM that improves on previous models.

SEISMIC ISOLATION OF LEAD-COOLED REACTORS: THE EUROPEAN PROJECT SILER

  • Forni, Massimo;Poggianti, Alessandro;Scipinotti, Riccardo;Dusi, Alberto;Manzoni, Elena
    • Nuclear Engineering and Technology
    • /
    • 제46권5호
    • /
    • pp.595-604
    • /
    • 2014
  • SILER (Seismic-Initiated event risk mitigation in LEad-cooled Reactors) is a Collaborative Project, partially funded by the European Commission in the $7^{th}$ Framework Programme, aimed at studying the risk associated to seismic-initiated events in Generation IV Heavy Liquid Metal reactors, and developing adequate protection measures. The project started in October 2011, and will run for a duration of three years. The attention of SILER is focused on the evaluation of the effects of earthquakes, with particular regards to beyond-design seismic events, and to the identification of mitigation strategies, acting both on structures and components design. Special efforts are devoted to the development of seismic isolation devices and related interface components. Two reference designs, at the state of development available at the beginning of the project and coming from the $6^{th}$ Framework Programme, have been considered: ELSY (European Lead Fast Reactor) for the Lead Fast Reactors (LFR), and MYRRHA (Multi-purpose hYbrid Research Reactor for High-tech Applications) for the Accelerator-Driven Systems (ADS). This paper describes the main activities and results obtained so far, paying particular attention to the development of seismic isolators, and the interface components which must be installed between the isolated reactor building and the non-isolated parts of the plant, such as the pipe expansion joints and the joint-cover of the seismic gap.

동력분산형 고속철도 차량성능 및 운용 기반기술 연구 (Study on the Key Technologies for Performance and Operation of the High-Speed EMU)

  • 송달호;민경호
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.1227-1232
    • /
    • 2008
  • High-speed train of push-pull type called as G7 train has been developed and chosen as the model of KTX-II which will be operated on Honam Line nexr year. However, the EMU-type high-speed train appeared to be the recent trend that foreign markets have shown. Also, in the near future, a great number of new train sets are needed to accommodate the increased passengers in our country. Thus, development of the high-speed EMU was decided, planned, and started. In the development, included were almost all fundamental key technologies such as noise and vibration reduction in a passenger cabin, running characteristics, aerodynamic analysis, crashworthiness evaluation, EMI/EMC analysis, design of the cooling system for the propulsion control system, enhanced performance of transformer and switching converters, synchronous traction motor with permanent magnets, new design of front nose and ergonomic interiors, application of advanced information technology(IT) and smart sensors and the cost reduction of construction of railway bridges, etc. Each key technologies are carried out as sub-project independently but under the supervision of a project. The project will develop the high advanced level of technologies and provide necessary know-why's and support the team in charge of the development of the high-speed EMU, Hyundai Rotem Co. Ltd. The high-speed EMU will be successfully developed with the support of the project.

  • PDF

Design of PM Motor Drive Course and DSP Based Robot Traction System Laboratory

  • Yousfi, Driss;Belkouch, Said;Ouahman, Abdellah Ait;Grenier, Damien;Dehez, Bruno;Richard, Eric
    • Journal of Power Electronics
    • /
    • 제10권6호
    • /
    • pp.647-659
    • /
    • 2010
  • This paper presents a part of North Africa/Europe collaboration results in education to develop project-oriented courses in power electronics and motor drive field. The course aims to teach Permanent Magnet motor drives close to a real world project of significant size and depth so as to be motivational, namely mobile robot project. Particular skills, student will acquire, are those relative to the detailed design and implementation of PM motor controllers in DSP based rapid prototyping environment. Simulation work is completed using graphical modeling tools in Simulink/Plecs, while real-time implementation is achieved by means of eZdspF2812 board and Simulink/TI C2000 Embedded Target tools. This flexible development environment fit the robot traction system very well and provides exactly the functionality necessary for an efficient PM motor drives teaching as demonstrated by a set of simulation and experiments.

Gyeonggi Provincial Free Uniform Support Project on the Usability through the Cooperation of 'Good School Uniform'

  • Park, Hye-Sook
    • International Journal of Advanced Culture Technology
    • /
    • 제9권3호
    • /
    • pp.68-73
    • /
    • 2021
  • The 'Good School Uniform' development project was conducted in consultation with Gyeonggi-do and the Gyeonggi Provincial Office of Education. The aim is to find various ways to supply school uniforms reflecting the latest trends at low prices using high-quality textile materials produced in Gyeonggi-do. From 2015, when the 'Good School Uniform' development project started, to the present, various events and fairs are making great progress. However, there are several problems in actually wearing each middle and high school student. In order to satisfy the characteristics of each school and the satisfaction of parents and students together, it is necessary to not only conduct practical research such as closer customer satisfaction surveys, industry-academia-research networks, expert interviews, and surveys, but also several supplements such as consultations between practitioners. There are many domestic studies on the development of school uniform design, but the research on the revitalization plan according to the free school uniform support is very insufficient. Moreover, it is not easy to find recent studies on the development of 'Good School Uniforms'. This study intends to study how to build a system so that the Gyeonggi-do 'Good School Uniform' development project can be used as a role model. In addition, it is expected that this study will be used as basic data for building a nationwide system such as public brand development and collaboration with small domestic companies.

일본 UR임대주택단지의 커뮤니티활성화 지원실태에 관한 고찰 (A Consideration of the Present Status of Support for Community Revitalization in the Japanese UR Rental Housing Complex)

  • 이수진
    • 대한건축학회논문집:계획계
    • /
    • 제36권3호
    • /
    • pp.103-111
    • /
    • 2020
  • This study aims to analyze community support methods and specific attainments of UR rental housing complex S in Japan and examine the present state of community formation.. UR rental housing S is part of the community revitalization support project launched by UR Urban Agency for creating exchanges among residents in the rental housing complex and in this study, the community support project from February to November 2013 was considered. As community revitalization support tasks, five types of events and exchange meetings were held. While the events and exchange meetings continued, even the residents who did not join the residents' association began to make an exchange with each other and their identity as residents enhanced, which means there was a change in the sense of community. Moreover, it is thought that a good solution to maintaining the chance for the events and exchange meetings after the support project is that residents of the younger generation actively cooperate in management as the residents' association members. 5 years after the support project, the present condition of activities of complex residents was examined, but the Residents' Association was disbanded due to the aging of residents, a growth in residents and low participation rates of the younger generation. Besides, there is a complete absence of community activities in the complex now.

SE 프로세스를 적용한 플랜트의 게이트 리뷰 프로세스 발전 방안 (A Study on the Gate Review of Small and Medium-Sized Plants)

  • 김진일;염충섭;신중욱;이상배
    • 시스템엔지니어링학술지
    • /
    • 제18권2호
    • /
    • pp.24-39
    • /
    • 2022
  • For the success of the plant project, it is necessary to review the project's progress through technical and business reviews at an appropriate time, such as design and construction, and determine whether to invest or to proceed with the project to manage risks. In particular, since the plant development projects are not mass-produced, trial and error in design and construction can have severe impacts in terms of cost and schedule. To this end, gate reviews are currently being conducted in plants and other industrial sectors, but there are few studies on how to conduct gate reviews suitable for the plant field. In addition, there is little literature to refer to when conducting gate reviews. So, in this study, we present an overall framework that includes the types of gate reviews to be performed and items to be checked in each gate review on small and medium-sized plant development projects in which the owner directly develops and operates plants.

Study on the Analysis of Domestic Construction Management Orders

  • Park, Jongsoon;Lee, Keunwon;Ann, Kyunghwan;Shin, Changhyun;Cho, Jaeho;Chun, Jaeyoul
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.387-391
    • /
    • 2015
  • Currently, there is insufficient research on the construction management performance since the CM system was introduced in Korea. For successful completion of construction projects, active use of construction mangers on projects is necessary by introducing construction management to the projects. In view of this, this study analyzed the annual CM performance from 1996 to 2013 but for the past 5 years from 2009 to 2013, a detailed analysis was carried out. For different sectors, CM performances were divided into public and private sectors, for project types, construction, civil and others, for project phases, pre-design, design, construction and post-construction phases, for contract types, sole and joint contract types, for project scale, the amount of the projects was taken into consideration and they were divided into large, medium and small scales and for the types of projects, they were divided into, shops, department stores, shopping centers, hospitals, government buildings, hotels, accommodation facilities, factories, buildings for workshops, office buildings, stadiums, playgrounds, schools and other construction types and all the data divided into such categories was analyzed. The results in this study can be used as a basic reference for studies in analysing construction management performances.

  • PDF