• 제목/요약/키워드: Design project

검색결과 4,019건 처리시간 0.033초

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods

  • Peressini, Anthony;Bristow, James;Motahari, Mahmoud;Karakouzian, Moses
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.669-677
    • /
    • 2022
  • In this paper, different types of traditional project delivery methods in the construction industry were explored and a comparative analysis against Integrated Project Delivery (IPD) were performed. The advantages of IPD method for all parties, owner/engineer/architect/general contractor, were explored by reviewing the most recent literature. The literature suggests that IPD method should be the dominating project delivery method and diluting the conventional methods such as Design-Bid-Build due to more collaborative and mutually beneficial ways of doing construction; IPD is newer and a more comprehensive method to capture the intrinsic values of project collaboration. This paper presents a comparison of the commonly used methods of project delivery, Design-bid-build, CMAR, & Design-Build and addresses their advantages and disadvantages in differing project scopes and sizes. Several industry leaders with experience in the four types of project delivery addressed were surveyed. The survey results show an overwhelming desire for future projects to go toward IPD from the contractor/owner/RDP. The biggest obstacle facing a project from using IPD appears to be trust.

  • PDF

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

인천대교 민자구간의 대구경 현장타설 말뚝기초의 LRFD 설계 적용 사례 (Design of Drilled Shafts Foundation by LRFD in Incheon Bridge Project)

  • 김정환;이현근;신현양;윤만근
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.551-561
    • /
    • 2006
  • Incheon bridge project is to construct total 12km long bridges on the sea consist of 800m span length cable stayed bridge, approach bridge and viaduct bridge based on LRFD design specification. To design pile foundations by RCD of each bridge unit, total 4 number of preliminary full scale pile load tests with Osterberg cell method were carried out on the piles for testing. The test load was planned to more than the expected design ultimate capacity and about 29,000tons maximum load was recorded. From the interpretation of test results, design parameters are evaluated and applied to the design. Preliminary pile load test plan and detailed execution of pile load tests are introduced and summarized. The resistance factors are presented for pile design of Incheon Bridge Project in LRFD considering variation of ground conditions and number of test piles.

  • PDF

Designing a Project-based Service-Learning Course for Pre-dental Education: A Theoretical Exploration

  • LEE, Jihyun
    • Educational Technology International
    • /
    • 제16권2호
    • /
    • pp.249-272
    • /
    • 2015
  • This study is a theoretical exploration of project-based service-learning and its application in designing pre-dental curricula. As a response to the limitation of community service courses, service-learning has been implemented as pedagogy in higher education practices. Service-learning connects service and learning by engaging students in activities that address community needs with intentionally designed learning opportunities while adding value to and transforming both service and learning. Project-based service-learning is an extended and more active version of service-learning. Whereas service activities are arranged by instructors in the original service-learning, project-based service-learning provides students with opportunities for exploring problems and root causes on site and then devising and implementing solutions of their own using their talents and creativity. This study proposes a theoretical approach to project-based service-learning and suggests six design components, namely, related curriculum, reflection, reciprocity, service and community engagement, evaluation and recognition, and creative problem solving. Based on the components, 20 design strategies are formulated. The exploration is aimed to provide design guides for professionals attempting to implement project-based service-learning in higher education.

Multi-Dimensional Hybrid Design and Construction of Skyscraper Cluster -Innovative Engineering of Raffles City Chongqing-

  • Wang, Aaron J.
    • 국제초고층학회논문집
    • /
    • 제6권3호
    • /
    • pp.261-269
    • /
    • 2017
  • Designed by star architect of Moshes Safdie, Raffles City Chongqing includes a total of 6 mega high-rise towers 250 to 380 m tall, a sky conservatory, a 5-storey high shopping mall and a 3-storey basement car parking. Located at the confluence of the Yangtze and Jailing Rivers, the site for the project is imbued with a significance that is immediately symbolic, both as a sign of Chongqing's important past and as a vivid indicator of the city's thriving present and future. The design for the project to be situated at this gateway takes as its governing idea the image of powerful sails upon the water. The outer facades of the project's eight towers - the transparent surfaces that will face the water to the north - are meant to recall a fleet of ancient Chinese ships, with their huge rectangles of white canvas filled by the wind. This is a $1.13million\;m^2$ mega scale integrated project of office, retail, hotel, service residence and high-end residence with the transportation hub and traffic circulation at various levels of the project. This paper presents the multi-dimensional hybrid design, engineering and construction of this mega scale project. The innovations and the cutting-edge technology used in this project are introduced and discussed benchmarking the design and construction of the skyscraper cluster in a major city like Chongqing of China.

제품개발 프로세스를 지원하는 통합설계환경 (Integrated design system for supporting product development process ($ezDesign^{(R)}$ System))

  • 이상봉;김수옥;홍태화
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2001년도 춘계학술대회논문집C
    • /
    • pp.357-360
    • /
    • 2001
  • Design Engineering Group, LG Production engineering Research Center has been developing The Integrated Design Environment enabling engineering design task with ease, speedy and accurate for several years targeting the design departments in LG Electronics. $ezDesign^{(R)}$ System is consisted by Engineering Database Management, Engineering Knowledge Management, 3D Design Application, Design Evaluation Method and Project Management. Engineering Database Management manage the design information effectively. Engineering Knowledge Management takes control of design knowledge from design engineering activity systematically. It is possible for the engineering designer to utilized 3D CAD easily by 3D Design Application. Design Evaluation Method can evaluate several design alternatives synthetically. In Project management System, Designer can simulate the project schedule and cost. In this report, We will introduce how design process can be innovated by way of $ezDesign^{(R)}$ System.

  • PDF

소프트웨어 시뮬레이터를 활용한 네트워크설계 교과목의 요소설계 과제개발 및 평가에 관한 연구 (A Study on the Development and Evaluation of Partial Design Project for Computer Network Design Course Utilizing Software Simulator)

  • 최대우
    • 공학교육연구
    • /
    • 제15권2호
    • /
    • pp.3-9
    • /
    • 2012
  • 본 논문에서는 워싱턴어코드를 따르는 IT관련 프로그램에서 비용의 문제 또는 교과목 특성상의 문제로 만져볼 수 있는 형태의 설계 프로젝트가 용이하지 않은 교과목에서 설계 프로젝트를 개발하고 2년 동안 실시한 결과에 관하여 논의 하였다. 정보통신공학심화 프로그램의 네트워크설계 교과목을 위하여 실제 장비와 똑같이 동작환경을 설정하고 시험할 수 있는 네트워크 시뮬레이터를 활용하여 2 ~ 3인이 한조가 되어 협업할 수 있는 설계 프로젝트를 개발하였다. 프로젝트는 설계 구성요소와 제한요소가 있는 개방형 문제로 출제하였고 5주 이상 진행하였으며 교과목 성적에 30%를 반영하였다. 결과물의 팀단위 발표평가 및 팀원상호평가, 전 후반기 설문조사, 중간고사와 기말고사에서의 직접평가를 통하여 설계능력을 측정한 결과 학기초에 비하여 크게 향상되었으며 학생들의 만족도가 높음을 확인하였다. 또한 전년도 실시결과 나타난 문제점을 다음해에 반영하여 CQI를 완성하였다.

총괄계획가 시범사업에서 주민참여 기본계획 사례연구 - 홍성 오누이권역을 대상으로 - (A Case Study on Resident Participative Primary Design of Integrated Rural Development Project with Master Planner - Onui Area in Hong Seong -)

  • 정남수
    • 농촌계획
    • /
    • 제21권4호
    • /
    • pp.167-175
    • /
    • 2015
  • The aim of this study is to establish resident-participative primary design of integrated rural development project with master planner by setting principals of open competition and transparent decision-making about village-to-village or business-to-business unit enterprise in Onui area, Hong-seong Gun. For effective processing, software projects such as residents education and rural landscape planning are simultaneously conducted for enhancing project understanding and comprehensive development plan including related post project. Above all, competition teams for individual project were organized to establish the resident-participative primary design using survey tables of residents demand. In 6 months resident-participative processing of primary design, continuous education and visiting to advanced area are conducted in team unit. Strengthened ability of team unit can be used in management and maintenance after project development. To do this, residents with the same opinions gathered as one competition team and identified business plans such as village asset, business location, size, program, and method for land securing. Favorable decision-making process by residents who are audience in project presentation of competition team has conducted. After selecting competition teams, continuos consulting are operated for establishing operation and management for developed or remodeled facilities through repetitive education and visiting advanced area. In this process, unit project suggested by competition team are completed. Preliminary selection was conducted by experts who were entrusted by residents. After residents agreement of project main stream such as major facilities and location, final detailed cost of projects are work out. Suggested process in this study which choose the final project by residents would improve residents' voluntary participation in integrated rural development project through open competition in establishing primary design.