Design Structure Matrix: A Model Proposal and Implementation on Harbor and Building Design Project

  • Akram, Salman;Kim, Jeonghwan;Pi, Seungwoo;Seo, Jongwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.144-152
    • /
    • 2013
  • Design is an iterative, generative, and multidisciplinary process by its nature. Iteration occurs often in most of the engineering design and development projects including construction. Design iterations cause rework, and extra efforts are required to get the optimal sequence and to manage the projects. Contrary to simple design, isolation of the generative iterations in complex design systems is very difficult, but reduction in overall iterations is possible. Design depends upon the information flow within domain and also among various design disciplines and organizations. Therefore, it is suggested that managers should be aware about the crucial iterations causing rework and optimal sequence as well. In this way, managers can handle design parameters related to such iterations pro-actively. There are a number of techniques to reduce iterations for various kinds of engineering designs. In this paper, parameter based Design Structure Matrix (DSM) is chosen. To create this DSM, a survey was performed and then partitioned using a model. This paper provides an easy approach to those companies involved in or intend to be involved in "design and build projects".

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF

A PROPOSAL OF CONSTRUCTABILITY REVIEW IN THE BASIC DESIGN STEP FOR DESIGN-BUILD PROJECTS

  • Sung-Wook Choi;Young-Woong Song;Yoon-Ki Choi;Dong-Woo Shin;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1150-1153
    • /
    • 2005
  • The orders of Design-Build Delivery System (DBDS) in a large and public construction project have been increasing. Single Source Responsibility (SSR) for design and construction, which contributes to quality improvement of design and construction, has been performed. The DBDS performs SSR for design and construction, but, it has not maximized effect because of the dissatisfied alternative analysis procedures which are based on constructability evaluation and the information system in the design step. In this research, Constructability Evaluation Factors (CEFs) that must be evaluated, investigated, and reflected in the basic design step for design-build projects. The CEF proposed and the business process of each conductor has been systematized. To propose constructability evaluation factors, first classify drawing information by the constructability evaluation sphere. CEFs must be proposed to evaluate factors according to interference among work items. Second, applicable CEFs must be classified by preference ranking and weight. Third, the values of constructability factors in accordance with building elements and work items, need to be calculated. Finally, the CEFs proposal will support rational decision making, design cost reduction, and quality improvement through the values for constructability of building elements and work items.

  • PDF

Study About the Capstone Design Education for the Growth of Local Design Industries - Based on the Exhibitional Project, 'Jeju Tamranun Idea' (지역디자인 산업발전을 위한 캡스톤 디자인교육 사례연구 - '제주 탐라는아이디어전'을 중심으로)

  • Kim, Jong-Min
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.6
    • /
    • pp.653-662
    • /
    • 2021
  • This is a thesis about the whole process of cooperative study for the project, 'Jeju Tamranun idea' which produced by Capstone Design Class in communication design Dept, Hongik University. The purpose of this thesis is to know the primary educational goal and essence of capstone design class and to find the enhancement plan for the local design industry. The exhibitional project, 'Jeju Tamranun idea' was operated three times by hongik university with the company based on Jeju from 2017 to 2019. After the research, There are three positive effects of this project which are the new social function of the discarded assignments, the improvement of educational standard through the autonomous competition, and the growth of students' social consciousness in the process of considering local industries. And there are several points to be reviewed for a better capstone design class with local design industries. It is necessary to utilize the untact system for solving distance issues. And also, absolute evaluations, giving equal reward, and copyright protection are needed. Lastly, the continuous development of the curriculum to improve local design industries is needed.

Challenges in Structural Design of Bumeo W-project

  • Kim, Jong Soo;Jo, Duck Won;Choi, Eun Gyu
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.2
    • /
    • pp.167-173
    • /
    • 2020
  • W-Project is 60-story mixed-use residential building complex project in Daegu, the third biggest city in South Korea. There are lots explorable items to be solved to secure structural safety and meet the serviceability requirements. This paper describes what kind of structural system is optimized based on the architectural requirements and structural components design and the grade of concrete strength altered on floors. The defining process of lateral resisting system of outrigger compared to the core ratio of typical plan is illustrated in detail.

A Fundamental Research for Adaptation Method of SCM in Korean Nuclear Power Plant Construction (원전 건설공사를 위한 공급망관리체계 적용방안에 대한 기초연구)

  • Park, Hang-Soon;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.229-231
    • /
    • 2012
  • The supply chain in plant construction project can be defined as a network combined between elements which is engineering, procurement, construction, start-up. For successfully leading construction project, close relation and mutual cooperation should be preceded and Supply Chain Management(SCM) system is needed to improve the relation. In particular, because safety is a top priority for the companies work in the construction of Nuclear Power Plant(NPP), it is necessary to control all parties realated with NPP construction systematically. In this situation, it is important to purchase high-quality equipment in timely manner by developing Integrated cooperative systems. Therefore, this study aimed to propose developing solutions of SCM such as JIT and Envelop Design system, which can reduces difficulties of decision making between the parties involved in the project and will increase the efficiency of the engineering process in NPP.

  • PDF

How to Efficiently Implement Modernization Projects of process Control Systems (플랜트 계측제어 시스템의 개선과 프로젝트의 효율적인 수행)

  • 최기원
    • Journal of the Korean Professional Engineers Association
    • /
    • v.33 no.4
    • /
    • pp.44-47
    • /
    • 2000
  • Recently number of reinstrumentation projects in the process plants has grown to meet the needs to modernize or upgrade the exsisting control systems in a bid to boost productivity and quality. Design, installation and start-up of these process automation systems can be successful and trouble-free only if decision points are addressed properly. The critical decision points are encountered from tile design through the start-up phases of implementing a modernization project and discussed extensively here on a practical basis. Key points are ;to assign a project manager out of the plant instrument engineers for him to organize and lead a project team. ;to follow three critical steps in designing and implementing. :to think ahead of the critical steps and to induce a positive cooperation from all level of participants in the effort to prevent possible schedule delays.

  • PDF

The Solution Of Software Contract (기획특집 - 공공 소프트웨어 발주관행 개선방안(IT 프로젝트관리 실무))

  • Shim, Ki-Bo
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.5
    • /
    • pp.29-31
    • /
    • 2009
  • A general practice in software ordering behavior in public sector has been an enormous obstacle standing in development path of Korea's software industry. Standard on software development cost estimation is supposedly based on Function Point, but in general, it is on headcounting (a number of people involved in a project). Moreover, it is difficult to change a contract in an on-going project, since statement of work is not precisely and carefully described. But it has a simple solution. Design and Implementation should be a separate project, as in construction industry, and both power and responsibility for design should be given to an expert with a national-level qualification. Here, there is a simple way for Korea to reborn as one of the strongest software country.

  • PDF

Analysis of Applying the Mobile BIM Application based on Cloud Computing (클라우드 컴퓨팅 기반의 모바일 BIM 애플리케이션 적용성 분석)

  • Jun, Jin-Woo;Lee, Sang-Heon;Eom, Shin-Jo
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.5
    • /
    • pp.342-352
    • /
    • 2012
  • As a futuristic construction model, building information model (BIM) based project management system (PMIS) and mobile BIM simulator apps have been showing visible sign. However, researches on the BIM based 3D simulator using mobile device are hard to find result from limitation of mobile device (slow speed at huge 3D file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying application of mobile BIM apps based on cloud computing. Total 8 BIM cloud apps were selected and analyzed in the 5 application feasibility characteristics (speed, view, inquiry, markup, and usability). This research would be essential phase to construct BIM based mobile project management system using cloud computing in the future.

감성공학 기반기술 연구기획

  • 김철중;박세진
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.450-453
    • /
    • 1996
  • Human sensibility ergonomics is the technology of measuring human sensibility, applying informaiton to the design of products, systems, and environments for convenient, comfort, and safe human use, and pleasuring human life. This study introduce the research contents and strategy on the human sensibility ergonomics project, which started as one of the national research projects of Korea. The objective of the project is to construct the basis of application technology for human-centered products and environments design in order to enhance the competitive power of the products and the quality of human life. The project consists of three main parts, that is, development of fundamental technology for human sensibility, development of simulator for measurement and evaluation of human sensibility, and development of application technology for products and environments. Total research funds is 70million dollars for 7 years.