• Title/Summary/Keyword: Design project

Search Result 4,041, Processing Time 0.034 seconds

ENERGY EFFICIENT BUILDING DESIGN THROUGH DATA MINING APPROACH

  • Hyunjoo Kim;Wooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.601-605
    • /
    • 2009
  • The objective of this research is to develop a knowledge discovery framework which can help project teams discover useful patterns to improve energy efficient building design. This paper utilizes the technology of data mining to automatically extract concepts, interrelationships and patterns of interest from a large dataset. By applying data mining technology to the analysis of energy efficient building designs one can identify valid, useful, and previously unknown patterns of energy simulation modeling.

  • PDF

Influence Factors of Aerial Environment on Project Schedule Management

  • Hong, Jun-pyo;Lim, Hyoung-chul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.608-611
    • /
    • 2015
  • The objectives of this research are 1) control of schedule or improvement of management for aerial environment, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall-based apartment buildings and in column-based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

  • PDF

BIM Application in Design Phase for Civil Engineering Project (토목공사의 설계단계 BIM적용에 대한 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Moon, Jin-Seok;Ann, Jae-Gyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.666-669
    • /
    • 2008
  • Recently, the application of building information model (BIM) is evaluated as one of important issues in construction market through the analyzed results in successful case studies. This study suggests an integrated information management model based on BIM through the problem analysis in existing information model for design phase. The application of suggested model is verified by a case study of bridge project. Those automatic and integrated information models for design phase can be used for an effective information management model through project life cycle.

  • PDF

신규제품 아키텍처 개발을 위한 기업조직의 설계 -PDA 개발에 있어 샤프와 카시오의 개발조직 비교 분석-

  • Wi, Jeong-Hyeon
    • Proceedings of the Technology Innovation Conference
    • /
    • 2005.06a
    • /
    • pp.44-68
    • /
    • 2005
  • The purpose of this paper is to analyze the organizational design and management of product development in creating new product architecture by an established firm. For the purpose, the paper put up the organizational design in the process of PDA(Personal Digital Assistant) development of Sharp and Casio which were Japanese major PDA firms in 1990s. PDA is the product born through architectural change from Electronic Organizer. Prior research on the product architecture change and organizational adaptation emphasized that an established firm is difficult to adapt to new product architecture due to the restriction of prior technology or organizational inertia. For overcoming these problems and successful development of new product architecture, organizational design and management in the process of product development becomes essential. In case of Sharp, corporate development project team had been used to overcome the restrictions from architectural knowledge accumulated through previous product. After launching first new PDA by corporate development project team, Sharp created a new division and pushed an evolution of PDA, when new PDA market start to grow up rapidly toward a major market segmentation. As a result, Sharp was able to build up stable PDA project trajectory. However, Casio was late for three years in launching of new PDA architecture because previous division charging of Electronic Organizer tried to develop first new PDA. Casio's PDA development was prohibited by engineers of previous division because new PDA architecture was inferior on user interface and display definition. That is, Casio's first PDA development was restricted by architectural knowledge of previous product.

  • PDF

A Study on UX Design Process Lecture Based on Modified PBL (Problem-Based Learning) (변형된 PBL 기반의 UX 디자인 수업 설계 연구)

  • Kim, Jung-Yi
    • Journal of the Korea Convergence Society
    • /
    • v.9 no.1
    • /
    • pp.117-131
    • /
    • 2018
  • PBL is expected to be very useful in the engineering project course that leads students to active learning in problem solving process. But it is not actively utilized because of various problems. In this study, modified PBL lectures were laid out for a course that practice UX design process. Modified PBL lectures provide theoretical class and two PBL practices. The variant is that the problem design is made by the students themselves on a weekly basis, rather than by the instructor, and that the two PBL processes consist of one project. The results of this study are meaningful as a basic data in PBL-based engineering college project class. Additional discussion of how to evaluate grades needs to be specified.

Electromagnetic design study of a 7 T 320 mm high-temperature superconducting MRI magnet with multi-width technique incorporated

  • Jang, Won Seok;Kim, Geonyoung;Choi, Kibum;Park, Jeonghwan;Bang, Jeseok;Hahn, Seungyong
    • Progress in Superconductivity and Cryogenics
    • /
    • v.23 no.4
    • /
    • pp.30-34
    • /
    • 2021
  • Superconducting magnets have paved the way for opening new horizons in designing an electromagnet of a high field magnetic resonance imaging (MRI) device. In the first phase of the superconducting MRI magnet era, low-temperature superconductor (LTS) has played a key role in constructing the main magnet of an MRI device. The highest magnetic resonance (MR) field of 11.7 T was indeed reached using LTS, which is generated by the well-known Iseult project. However, as the limit of current carrying capacity and mechanical robustness under a high field environment is revealed, it is widely believed that commercial LTS wires would be challenging to manufacture a high field (>10 T) MRI magnet. As a result, high-temperature superconductor together with the conducting cooling approach has been spotlighted as a promising alternative to the conventional LTS. In 2020, the Korean government launched a national project to develop an HTS magnet for a high field MRI magnet as an extent of this interest. We have performed a design study of a 7 T 320 mm winding bore HTS MRI magnet, which may be the ultimate goal of this project. Thus, in this paper, design study results are provided. Electromagnetic design and analysis were performed considering the requirements of central magnetic field and spatial field uniformity.

Virtual Design and Construction (VDC)-Aided System for Logistics Monitoring: Supply Chains in Liquefied Natural Gas (LNG) Plant Construction

  • Moon, Sungkon;Chi, Hung-Lin;Forlani, John;Wang, Xiangyu
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.195-199
    • /
    • 2015
  • Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.

  • PDF

Derivation of BIM Project Properties Through an Analysis of On-Line BIM Project Cases (온라인 BIM(Building Information Modeling) 사례 분석을 통한 BIM 프로젝트 속성정보 도출)

  • Lee, Kyungha;Uhm, Miyoung;Lee, Hwayeon;Lee, Ghang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.194-195
    • /
    • 2015
  • When starting a new project, generally similar existing projet are searched. As Building Modeling Information(BIM) has short history and experience, the dependence on similar project is high. Small and medium sized design companies are depending on website search tool for information of BIM project besides companies maintaining the Database(DB) from lots of project experience. However, the information level and contents provided by websites differ drastically from each other which makes it difficult to utilize the information and apply cases. Furthermore, the different classification system of the sites makes the situation even worse. Therefore, we collected and analyzed over 100 BIM cases from 18 global websites, to develop a system for BIM case application. Result showed that over 90% of our subject pool provided basic information including the construction type, characteristics of the client (public/ private), location of the project, and detailed information such as primary usage. Moreover, the reasons for applying BIM where to solve problems of geometric design, building system like MEP and construction. Furthermore, there was a contrast between cases conducted only within Korea and cases conducted with other countries. While there was almost always helpful information regarding the administrative steps for Korean BIM cases, there was close to no information for projects carried out outside of Korea. These results could contribute to verifying the trend of information provision of the websites for BIM projects data, and this is believed to be helpful for developing an application system for BIM cases which have an organized information provision system and level as well as for bench marking.

  • PDF

Evaluation of Marginal and Internal Integrity of Modified Resin-Bonded Fixed Partial Dentures: An In Vitro Study

  • Ahn, Sung-Hyeon;Choi, Jae-Won;Jeon, Yong-Chan;Jeong, Chang-Mo;Yoon, Mi-Jung;Lee, So-Hyoun;Huh, Jung-Bo
    • Journal of Korean Dental Science
    • /
    • v.10 no.1
    • /
    • pp.29-34
    • /
    • 2017
  • Purpose: The purpose of this study was to evaluate the microleakage of various types of resin-bonded fixed partial dentures (RBFPDs) after artificial aging. Materials and Methods: Forty models with missing first molar were fabricated using artificial resin teeth and were divided into four groups: Group A, conventional RBFPDs design; Group B, modified RBFPDs design; Group C, assembled 3-piece RBFPDs design; and Group D, assembled 3-piece RBFPDs with different occlusal rest positions. Half of the specimens underwent chewing simulation process (240,000 cycles, 50 N load, 1.7 Hz) and thermocycling (temperatures $5^{\circ}C{\sim}55^{\circ}C$, dwelling time 30 seconds) and the remaining 20 specimens didn't receive any treatment. All the specimens were immersed in 2% methylene blue solution for 24 hours to evaluate microleakage, and were sectioned at the middle part of abutment teeth. To evaluate the microleaskage, a dye penetration was calculated. Result: With artificial aging, cyclic loading and thermocycling, a 3-piece RBPFD and a 2-piece RBPFD using original tooth undercuts have significantly lower microleakge (P<0.05) compared to the conventional design of RBPFD and modified RBPFD. Conclusion: Within the limit of this experiment, the assembled RBFPDs exhibited a smaller microleakage than the conventional RBFPDs, implying that the assembled RBFPDs can be more effective for reducing the dislodgement of the RBFPDs.