• Title/Summary/Keyword: Design project

Search Result 4,024, Processing Time 0.029 seconds

The Effects of a University Cooperation Project on Urban Regeneration for Recovery of Commercial Supremacy

  • Ryu, Tae-Chang;Sung, Chang-Soo
    • Journal of Distribution Science
    • /
    • v.14 no.10
    • /
    • pp.29-38
    • /
    • 2016
  • Purpose - This research examines the effects of local universities on urban regeneration to recover commercial supremacy in the original urban area and provides clear information on the "University Cooperation Project for Traditional Market." Research design, data, and methodology - The "University Cooperation Project for Traditional Market" started in 2015. This study was conducted focusing on 22 places selected in 2015 and the project content in those locations. Results - This study analyzes the link to urban regeneration and spreads the concept along with theoretical consideration of university cooperation for traditional markets. Additionally, it promotes policies to help propel the project based on characteristics of the region. Conclusions - A differentiated project should be created, with characteristics of the region reflected, and detailed programs developed and implemented resulting in meaningful achievement from the perspective of members of the local community, who may have deviated from existing perspectives. Additionally, opportunities should be established for the direct application of young consumer ideas through experimental business to regenerate the traditional market (commercial supremacy), the center of the local economic society.

Elicitation Project Management Factors and Evaluation of its Weight to Ensure LNG Plant Success (LNG 플랜트 사업관리 요소 도출 및 중요도 평가)

  • Han, Jae-Goo;Chin, Kyung-Ho;Park, Hwan-Pyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05b
    • /
    • pp.85-89
    • /
    • 2010
  • The propose of this research is derive project management factors and evaluate its decision weight in LNG plant EPC phases. In order to research, we studied the demestic and international research trend and analysed expert opinions. Initially we derived nine project management factors in each phase of EPC. Elicited factors in research are project management, design management, cost management, time management, contract and craim management, safety management, environment management, and risk management. Then, we evaluated the weight of project management factors with expert survey method and elicitated. Finally, The remarkable points in the result are that key management factors of EPC project are project management and risk management.

  • PDF

Evaluation Model for Design Quality using Change Order Analysis (설계변경 분석을 통한 설계품질 평가모델)

  • Lee Seung-Heon;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.72-79
    • /
    • 2000
  • Design quality in constructed project is a primary consideration to achieve overall project objectives. It is not easy to evaluate the design quality because various factors are involved in the design process. This paper presents a new approach to improve the evaluation process of design quality In the construction project The evaluation model is developed to satisfy the requirement for implementing the ISO 9000 Quality Assurance Standards in the design process. It is assumed that design changes are resulted from the poor management of design quality. The model relates design changes to design quality management items. It assigns weight ratio to each design quality item to evaluate quantitatively Design Quality Index (DQI) is calculated to assess design quality based on the Objectives Matrix. A case study is performed to illustrate the practical implementation of the design quality evaluation.

  • PDF

Project Participants Cooperative Decision Making Model with QFD-based VE Technique (프로젝트 참여자의 협력적 의사결정이 가능한 QFD 기반 VE 모델)

  • Lim, Chulhee;Chun, Jaeyoul;Lee, Jongsik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.3-12
    • /
    • 2019
  • VE analysis is a method to secure definite functions and performance by defining user's various requirements clearly and propose alternatives to reduce cost. However, the present domestic VE project has difficulty in defining design function analysis clearly due to time constraints as well as difficulty in effective and efficient communication between project stakeholder. Domestic results of VE were largely focused on reducing cost while maintaining the functions of the existing facility. Therefore, this study aims to secure the optimal functions for users according to the original intent of user requirements through QFD-VE model which project VE participants can make collective and cooperative decision making. QFD-VE is a technique that first, it can make collaborative decision making in defining and modifying of design function and setting the importance of requirement function. Second, it allow project VE participants to check design interference and conflict between neighbor systems. This study also provided a mathematical model for implementing the computer system using QFD-VE in the future.

A Study on Design of Project Integrated Management Tool for Improving Communication Process (의사소통 개선을 위한 프로젝트 통합관리 도구의 설계에 관한 연구)

  • Moon, Sung-Gae;Kim, Ji-Hyeok;Rhew, Sung-Yul
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.7
    • /
    • pp.133-141
    • /
    • 2009
  • To have successful execution of a development project on large scale, it is the most important to improve communication problems between project stakeholder. In this study, we design and implement project integrated management tools that improve the problems. In order to design and implement the tools, we gathered and arranged requirements based on the ISP data from S corporation and the problems of 23 projects which was executed in recent 2 years in a communication perspective, and then we conceptually design and propose the tools. We defined major parts of the functions and the architecture related to communication among the proposed architecture model, and we proposed process and detail functions to execute major functions. This study shows the possibility through a qualitative valuation to improve validation of the architecture model and a quantitative analysis in a communication perspective.

Teaching-Learning Model of Convergence Project Based on Team Teaching in Engineering Education (공학교육에서의 팀티칭기반 융합프로젝트중심 교수학습모형의 개발)

  • Park, Kyungsun
    • Journal of Engineering Education Research
    • /
    • v.17 no.2
    • /
    • pp.11-24
    • /
    • 2014
  • The purpose of this study is to develop a teaching-learning model of convergence project based on team teaching. Based on development research methodology which explored a university case, the teaching-learning model was developed including three phases such as preparation, planning, and implementation & evaluation. The preparation phase has three steps as follows: to organize team teaching faculty; to develop convergence projects cooperated by industry and university; and to design instructions based on supporting convergence projects. The last step of preparation phase consists of five design activities of: (1) instructions and teaching contents; (2) communication channel among faculty members; (3) feedback system on students' performance; (4) tools to support learners' activity; and (5) evaluation system. The planning phase has two steps to analyze learners and to introduce and modify instruction and themes of convergence projects. The implementation & evaluation phase includes five steps as bellow: (1) to organize project teams and match teams with faculty members; (2) to do team building and assign duties to students of a team; (3) to provide instruction and consulting to teams; (4) to help teams to conduct projects through creative problem solving; and (5) to design mid-term/final presentation and evaluation. Lastly, the research implications and limitations were discussed for future studies.

Noise Assurance Plan in the Project for Design a New Rolling Stock (철도차량 개발과정에서의 소음관리방안)

  • 정경렬;김경택;이병현
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.542-548
    • /
    • 2003
  • This paper describes an overall Noise Assurance Plan(NAP) in the project for developing a new rolling stock. In this paper, the procedure for implementing noise control activities for each development stage on the basis of the NAP is also described. The NAP was developed by KITECH(Korea Institute of Industrial Technology) and ODS(${\Phi}$degaard & Danneskiold-Samsoe in DENMARK). Generally, the main objective of NAP is that noise assurance plan applies to the establishment of organization and personnel's roles and responsibilities, set-up of overall procedure and internal audit program. Here, a few comments are made to the deviations of the actual procedure(G7 Project) relative to the suggested NAP presented. The major difference between the suggested NAP and the actual procedure was the late involvement of the noise consultant resulting in suggestions for design improvements could not be implemented due to the advanced stage of the design. Similarly, the important task of preparing sub-supplier specifications was performed. The proposed NAP will be an efficient tool for noise management in the R&D project for new rolling stock. Specially, in case that several companies and institutes are involoved in the R&D team

  • PDF

LEED PERCEPTION DISPARITIES: DESIGNERS VERSUS NON-DESIGNERS

  • Hyun Woo Lee;Youngchul Kim;Doyoon Kim;Kunhee Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.36-41
    • /
    • 2013
  • With the increased interest in green buildings, the building industry has been experiencing a fast-growing demand for LEED (Leadership in Energy and Environmental Design) certification for the last decade. Still, it is not unusual to see various barriers and issues during its implementation, and experience tells that they can result in harming the overall project performance with reworks, lower productivity, schedule delays, and cost overruns. In order to better understand the industry's observation on issues and their consequences during LEED implementation, we distributed an online survey, and a total of 53 responses were received. The survey results indicate that (1) both designers and non-designers (e.g., contractors) select 'added costs to design and construction' as the biggest barrier; (2) both designers and non-designers select 'decision made too late in the design process' as the most frequently observed issue; and (3) non-designers indicate higher perceived severity in every consequence criteria than designers. The statistical analyses reveal that cost overruns are the most severe impact observed and have a statistically significant relationship with responses in regard to the barrier to LEED implementation.

  • PDF

A Study on the Management of Construction Project for Preventing Accidents of Reclamation : basic on the collapse of Sangdo Kindergarten (도심지 소규모 재개발·재건축공사시 흙막이가시설 사고예방을 위한 건설사업관리 방안 연구 : 상도유치원 붕괴사고 중심으로)

  • Oh, Se-kil;Park, Joo-Moon
    • Journal of Urban Science
    • /
    • v.8 no.1
    • /
    • pp.33-44
    • /
    • 2019
  • The purpose of this study is to investigate the cause of repeated accidents through the investigation and analysis of the collapse cases of domestic earthquakes in order to prevent the earthquake disaster in the urban redevelopment and reconstruction. It is designed and constructed to draw out various problem factors and to find solutions to these problems. And the contents related to various laws and systems of the construction project management stage. Especially. In the management of the construction management centered on the safety management and quality control of the technical aspect design, supervision, construction phase through the cause of the accident and improvement measures based on the investigation report of the collapse of the construction site near Sangdo Kindergarten in Seoul. Supervisor. And constructors should be settled on the responsibility and responsibility of God. In order to achieve the purpose of the project, a system is established to link worker-centered occupational safety and health management with technology-based safety construction management, and analysis of how the quality control of the earthquake prevention affects safety construction management The purpose of this study is to prepare the optimum management plan of construction business.As a result of this study, it is aimed to accomplish the purpose of small scale redevelopment and reconstruction construction project by providing optimization method in the stage of construction project management in order to prevent collapse caused by differences in design,Is expected.

Information System for Integrated Product Design Process (통합적 제품 디자인 프로세스를 위한 정보시스템-디자인과 생산의 인터페이스 과정을 중심으로-)

  • Kim, Eok;Lim, Chang-Yeong
    • Archives of design research
    • /
    • v.13
    • /
    • pp.212-221
    • /
    • 1996
  • The necessity of imformation on product design process is increased in recently years, because a product can be called a mass of information and becomes more complex as long as technology is developed. But the present product development method is like a relay race. In this sequential process, information is transferred from one department to other departments like \"over the wall\". And communication gaps among departments are generated, so imformation cannot be controlled very well. Therefore it is needed to innovate the design process. The information system proposedin this study is an application software which can be useful for integrated product design process. It has been developed primarily for use in IBN PC and windows environment. It comprises four functional modules; functions of handing the overall project information (document, ideaskech, rendering, drawing); functions of decision making production problems in design project process; functions of groupware which can link with other departments; functions of comprehensive database with production.roduction.

  • PDF