• Title/Summary/Keyword: Design management Construction

Search Result 2,202, Processing Time 0.033 seconds

QUALITY MANAGEMENT OF ECOLOGICAL ENGINEERING

  • Ying-Mei Cheng;Been-Jyh Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1216-1222
    • /
    • 2009
  • Ecological Engineering (EE) refers to all sustainable engineering that can reduce damage to ecosystems and that adopts ecology as a base and safety as an orientation in order to implement conservation of biodiversity and sustainable development. In short, EE attempts to safeguard the ecological environment while any essential construction projects proceed. EE encompasses many fields, including construction skills, ecosystem preservation, landscape, and even related cultures and so on. Such variety results in greater complexity of construction, and, consequently, indirectly increases the difficulty of construction quality control. The objective of our research is to explore a promising model for EE via an extensive literature survey. This model includes three principal stages: plan-design, construction, and maintenance, along with individual accompanying phases concerned with quality control and vital management. In this article, a river restoration example is adopted to describe in detail the critical points of quality control in the three stages (plan-design, construction, and maintenance) of the construction life cycle. This study proposes an integrated structure for quality management of EE to guarantee its quality and to enhance its core applications in order to achieve long-lasting preservation of the environment.

  • PDF

Quality Management for Utilizing BIM in Construction Phase (시공단계에서의 BIM 활용성 증대를 위한 품질관리 방안)

  • Kwon, Ocheol;Cho, Joowon;Jo, Chanwon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.5
    • /
    • pp.338-347
    • /
    • 2013
  • Since it is common that design BIM data created by designers and engineers do not afford to consider constructability for the site, it is usually necessary to optimize the design BIM data to construction BIM data. While this optimization process requires various design updates depending on the construction methods and requirements, most designers in the projects do not participate the construction phase, which can arise another obstacle factor in utilizing construction BIM. In order to prevent this issue, we need cooperation system, where all the parties work together from the initial stage of project to create quality assured BIM model. However this kind of system is not realistic in Korea with most of the working processes being conventional yet. Therefore, at this point of time, it is realistic for us to secure basic construction qualities in the design phase and keep those qualities by the construction phase. This study suggested a relevant quality management plan for BIM usage in construction phase.

CRITICAL SUCCESS FACTORS OF A BUILDING DESIGN TEAM

  • T.H. Nguyen;M. Diab
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.9-18
    • /
    • 2007
  • The success of a building design team is achieved as a result of a combination of multiple events/factors and interactions, and has a great impact on the quality of the building construction process. While most of previous studies have focused on quality of the construction process, the success of a design team has not been completely investigated. This paper presents the critical factors that impact the success of a building design team and describes an assessment tool to measure the successful performance of the design team with respect to the critical factors. The development of the assessment tool employs the concept of quality function deployment (QFD), a technique to measure the service quality of an organization.

  • PDF

DESIGN MANAGEMENT FOR CONSTRUCTABILITY REVIEW OF HIGH QUALITY EXPOSED CONCRETE

  • Doo Won Hwang;Young woong Song;Yoon ki Choi;Dong Woo Shin;Jae Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1154-1157
    • /
    • 2005
  • This report is to do design management for constructability review of high quality exposed concrete, which is used increasingly in recent. To secure systematic management at design phase, we reviewed each definition and work at each design phase, we define high quality exposed concrete, a part of architectural concrete, as "an exposed concrete which has well ordered joint & is in pursuit of smooth surface." We reviewed requirements and influential factor to obtain High quality finishing surface and compared construction process of high quality exposed concrete with that of other finishing method. Management method at each design phase for constructability review to meet additional works and requirements is presented.

  • PDF

PERFORMANCE EVALUATION FRAMEWORK FOR ENGINEERING CONSULTANTS OF TAIPEI RAPID TRANSIT SYSTEMS

  • Chien-Hui Sun;Nie-Jia Yau
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.426-431
    • /
    • 2011
  • The quality of performance evaluation on engineering consultants that provide design-related technical services is difficult to be measured, and only a handful of papers discussed the quality during the design stage. Although design cost is relatively far less than construction cost for a project, the decisions made in the design phase have a significant impact on the final products of the project, especially for large public construction projects. Therefore, this research focuses on reviewing and then establishing a performance evaluation framework for the consulting firms that execute detailed design and provide technical services for the Taipei Rapid Transit Systems (TRTS). By interviewing experts, this study first established a set of indicators to evaluate these firms' performance. Then, those indicators were incorporated into the four aspects of balanced scorecard (BSC) to establish the architecture of the evaluation mechanism. The weight of each indicator was calculated by analytic hierarchy process (AHP) from a survey conducted among experts. The results showed that the top-three indicators were quantity take-off, functions conformity, and budgeting. The framework of performance evaluation established by this study can be applied to measure service performance during the design stage. It not only facilitates the monitoring of consulting firms, but also helps to reduce unnecessary change orders and disputes during the construction stage.

  • PDF

A Study on the Management of Construction Project for Preventing Accidents of Reclamation : basic on the collapse of Sangdo Kindergarten (도심지 소규모 재개발·재건축공사시 흙막이가시설 사고예방을 위한 건설사업관리 방안 연구 : 상도유치원 붕괴사고 중심으로)

  • Oh, Se-kil;Park, Joo-Moon
    • Journal of Urban Science
    • /
    • v.8 no.1
    • /
    • pp.33-44
    • /
    • 2019
  • The purpose of this study is to investigate the cause of repeated accidents through the investigation and analysis of the collapse cases of domestic earthquakes in order to prevent the earthquake disaster in the urban redevelopment and reconstruction. It is designed and constructed to draw out various problem factors and to find solutions to these problems. And the contents related to various laws and systems of the construction project management stage. Especially. In the management of the construction management centered on the safety management and quality control of the technical aspect design, supervision, construction phase through the cause of the accident and improvement measures based on the investigation report of the collapse of the construction site near Sangdo Kindergarten in Seoul. Supervisor. And constructors should be settled on the responsibility and responsibility of God. In order to achieve the purpose of the project, a system is established to link worker-centered occupational safety and health management with technology-based safety construction management, and analysis of how the quality control of the earthquake prevention affects safety construction management The purpose of this study is to prepare the optimum management plan of construction business.As a result of this study, it is aimed to accomplish the purpose of small scale redevelopment and reconstruction construction project by providing optimization method in the stage of construction project management in order to prevent collapse caused by differences in design,Is expected.

Analysis of structure stability of Golf structure of truss (골프장 트러스구조 구조안전성 검토사례)

  • Kang, Dong-Gyun;Yoon, Sung-Won;Hong, Hyun-Pyo
    • 한국공간정보시스템학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.275-278
    • /
    • 2004
  • This paper focused on problems of design, construction, and maintenance caused by construction implementation processes. They were analyzed through case study of structure safety diagnosis projects. From the case study, it is expected that the introduction of Construction Management from the first stage of procurement will improve construction cost increase or burden on small design company. It strengthens coherent management from design and source contractor selection to build review of responsibility. The coherency will prevent changes in designing or infirm unreliable construction. It is desirable that expert opinions are considered when structure changes and establishment occur and that, if necessary, actions such as source selection, periodic audits, and diagnosis arc checked and fed back to maintenance.

  • PDF

Web-based Distributed Lean Construction Information System;Development of System Prototype (웹 기반 분산형 린건설 정보시스템 개발;시스템 프로토타입 개발)

  • Park, Moon-Seo;Yoon, You-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.182-189
    • /
    • 2007
  • To reform and improve the productivity of construction industry, 1) it should be encouraged to improve the construction production process and 2) it is required to enhance reliability of construction information based on the systematic thinking process. To promote the information reliability created during construction production process, Lean Construction Research Center(LRC2) is developing a supporting system to improve design/material supply/schedule management, functioning to efficiently manage the information created at construction production processes and developing a web based construction information system that provides result management/decision making support/knowledge based information services.

  • PDF

The Efficiency Scheme of Design VE through the Case Studies of Construction VE for Apartments (공동주택 시공VE 사례분석을 통한 설계VE 효율화방안)

  • Kim, Yong-Su;Kim, Young-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.59-67
    • /
    • 2010
  • The purpose of this study is to efficiency scheme to design VE through the case studies of construction VE forapartments. The adapted research method includes five case studies of construction VE and analysis of constructionVE practice. The results of this study are as follows 1) For efficiency of design VE, data management system whichis necessary for construction VE database establishment and its application were proposed. 2) Through workingsystem improvement of construction VE, an improvement to design VE performance process was proposed. 3)Consideration factors and main VE items for efficient design VE item selection of apartment buildings wereproposed.

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF