• 제목/요약/키워드: Design Standard

검색결과 7,925건 처리시간 0.037초

변전소 옥내화에 따른 접지설계 (Grounding System Design According to Indoor Substation)

  • 최종기;주병수;김문덕;김정부
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1996년도 하계학술대회 논문집 B
    • /
    • pp.905-907
    • /
    • 1996
  • Current design standard of substation grounding systems is primarily concerned with conventional outdoor substations. But in case of 154kV substations in the nation, almost all are indoor-type GIS substations. So there became to be something not proper for application of present design standard to indoor-type substations. In this paper, as a preliminary stage of drawing-up of the grounding system design standard which concerned with in-door-type substions, issues of current design standard are mentioned and directions of improvement are also presented.

  • PDF

도로선형설계요소의 표준편차를 이용한 설계일관성과 교통사고와의 상관성 (Correlation between Design Consistency and Accident Rates based on Standard Deviations of Highway Design Elements)

  • 오흥운
    • 한국도로학회논문집
    • /
    • 제11권2호
    • /
    • pp.159-166
    • /
    • 2009
  • 고속도로에서 교통사고에 중요한 두 영향요소는 운전자요소와 도로환경요소로 구분되어 진다. 그동안 여러 연구에서 도로환경요소중 설계요소로 알려진 곡선반경, 종단경사, 편경사, 관찰속도와 교통사고와 관련성을 연구하였고 그 밀접한 관련성을 제시하고자 하였다. 본 논문에서는 이들 관련요소 크기가 교통사고와 관련성이 깊다는 사실에 대하여 상관관계분석을 통하여 확인하고자 하였다. 이에 더하여 이들 설계관련요소의 표준편차를 설계일관성으로 정의하고 교통사고의 증감과 비교하여 봄으로써 표준편차로 특징 지워지는 설계요소와 설계속도의 일관성이 교통사고 발생과 상관성이 깊다는 사실을 도출하였다. 본 논문의 결과는 선형설계과정에서 설계일관성의 수치화된 활용을 더 활성화시킬 것으로 기대된다.

  • PDF

부품 및 유닛 DB를 이용한 유닛 모듈라 주택의 설계자동화 연구 (A Study on the Automatic Design of Unit Modular House Using Component and Unit DB)

  • 임석호;김수암;황은경
    • 한국주거학회논문집
    • /
    • 제17권3호
    • /
    • pp.41-49
    • /
    • 2006
  • Precast concrete apartments were main stream of domestic industrialized housing around 90's, and Steel Houses applying Steel Stud technique with light weighted steel have been dominant portion since 1995. On the other hand, various building techniques including Steel Stud method and highly prefabricated and industrialized Unit method are prevailing in developed countries like Japan. Steel stud and unit box have their own merits and demerits, but the more crucial aspect is that the constant design standard should be applied in each design procedure. It entails the necessity of industrial housing development on the open system basis. In this study, the design standard for unit house will be established coping with the established preparing standard for design specifications defined by architectural law and promotion law of housing construction. That is for design standard of industrialized private housing on the open system basis. This study attempts to propose the design automation, with the method of unit construction of which the rate of pre-fabrication is the biggest, that can cope with the demand of user on the basis of open-system. Ticky-tacky is the biggest technical problem in suppling industrialization housing. Therefore, we will suggest a basic plan for design automation of unit modular housing which can raise the productivity of industrialization housing by applying open system, utilized by DB of component and unit, and solve the problem concerned about ticky-tacky.

소형 풍력 블레이드 공력 설계를 위한 표준 절차 구축 (Standard Procedure for the Aerodynamic Design of Small Wind Turbine Blades)

  • 장세명;정수윤;서현수;경남호
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2009년도 추계학술대회 논문집
    • /
    • pp.473-473
    • /
    • 2009
  • There have been many academic researches on the aerodynamic design of wind turbine based on blade element method (BEM) and momentum theory (MT, or actuating disk theory). However, in the real world, the turbine blade design requires many additional constraints more than theoretical analysis. The standard procedure is studied in the present paper to design new blades for the wind turbine system ranged from the small size from 1 to 10 kW. From the experience of full design of a 10 kW blade, the authors tried to set up a standard procedure for the aerodynamic design based on IEC 61400-2. Wind-turbine scale, rotating speed, and geometrical chord/twist distribution at the segmented span positions are calculated with a suitable BEM/MT code, and the geometrical shape of tip and root should be modified after considering various parameters: wing-tip vortex, aerodynamic noise, turbine efficiency, structural safety, convenience of fabrication, and even economic factor likes price, etc. The evaluated data is passed to the next procedure of structural design, but some of them should still be corresponded with each other: the fluid-structure interaction is one of those problems not yet solved, for example. Consequently, the design procedure of small wind-turbine blades is set up for the mass production of commercial products in this research.

  • PDF

DESIGN SCOPE AND LEVEL FOR STANDARD DESIGN CERTIFICATION UNDER A TWO STEP LICENSING PROCESS

  • Suh, Nam-Duk;Huh, Chang-Wook
    • Nuclear Engineering and Technology
    • /
    • 제44권6호
    • /
    • pp.689-696
    • /
    • 2012
  • A small integral reactor SMART (System Integrated Modular Advanced ReacTor), being developed in Korea since late 1990s and targeted to obtaining a standard design approval by the end of 2011, is introduced. The design scope and level for design certification (DC) is well described in the U.S. NRC SECY documents published the early 1990s. However, the documents are valid for a one-step licensing process called a combined operating license (COL) by the U.S. NRC, while Korea still uses a two-step licensing process. Thus, referencing the concept of the SECY documents, we have established the design scope and level for the SMART DC using the contexts of the standard review plan (SRP). Some examples of the results and issues raised during our review are briefly presented in this paper. The same methodology will be applied to other types of reactor under development in Korea, such as future VHTR reactors.

모듈식 프레스 다이 설계 시스템 개발 (Development of a Modular Design System for Press Die)

  • 박홍석;정진형
    • 한국CDE학회논문집
    • /
    • 제12권3호
    • /
    • pp.182-192
    • /
    • 2007
  • The reduction of product development time is exposed to the competitive pressure due to shortened product-and production technology lifecycles as well as increasingly dynamic markets. Specially in automobile companies, that is of major importance for designing die because it is a bottleneck process in the development of a new car. To improve this conventional design process, this paper describes how to design it fast and flexibly. This was done by a modular method using standard template and a feature and knowledge based design method along the design process.

Contribution of thermal-hydraulic validation tests to the standard design approval of SMART

  • Park, Hyun-Sik;Kwon, Tae-Soon;Moon, Sang-Ki;Cho, Seok;Euh, Dong-Jin;Yi, Sung-Jae
    • Nuclear Engineering and Technology
    • /
    • 제49권7호
    • /
    • pp.1537-1546
    • /
    • 2017
  • Many thermal-hydraulic tests have been conducted at the Korea Atomic Energy Research Institute for verification of the SMART (System-integrated Modular Advanced ReacTor) design, the standard design approval of which was issued by the Korean regulatory body. In this paper, the contributions of these tests to the standard design approval of SMART are discussed. First, an integral effect test facility named VISTA-ITL (Experimental Verification by Integral Simulation of Transients and Accidents-Integral Test Loop) has been utilized to assess the TASS/SMR-S (Transient and Set-point Simulation/Small and Medium) safety analysis code and confirm its conservatism, to support standard design approval, and to construct a database for the SMART design optimization. In addition, many separate effect tests have been performed. The reactor internal flow test has been conducted using the SCOP (SMART COre flow distribution and Pressure drop test) facility to evaluate the reactor internal flow and pressure distributions. An ECC (Emergency Core Coolant) performance test has been carried out using the SWAT (SMART ECC Water Asymmetric Two-phase choking test) facility to evaluate the safety injection performance and to validate the thermal-hydraulic model used in the safety analysis code. The Freon CHF (Critical Heat Flux) test has been performed using the FTHEL (Freon Thermal Hydraulic Experimental Loop) facility to construct a database from the $5{\times}5$ rod bundle Freon CHF tests and to evaluate the DNBR (Departure from Nucleate Boiling Ratio) model in the safety analysis and core design codes. These test results were used for standard design approval of SMART to verify its design bases, design tools, and analysis methodology.

비주얼 프로그래밍 기법을 활용한 도로설계기준 자동검토 방안 (Automation Review of Road Design Standard using Visual Programming)

  • 문현석;김현승
    • 한국재난정보학회 논문집
    • /
    • 제18권4호
    • /
    • pp.891-898
    • /
    • 2022
  • 연구목적: 건설산업의 전 분야 및 전 단계에 대한 BIM 도입 의무화가 머지않아 시행될 만큼 BIM 업무의 실질적인 생산성 향상을 위한 기술 확보 방안이 필요하기 때문에 연구에서는 엔지니어가 BIM기반 설계 과정에서 건설기준을 검증할 수 있도록 BIM 모델링 절차별로 제작되는 주요 객체에 대해 자동으로 관련 건설기준을 검증할 수 있는 방안을 제시하였다. 연구방법: BIM기반 도로 설계 업무를 대상으로 모델링 업무 절차를 정의하고, 각 단계에서 도출되는 BIM 모델별로 관련 설계기준을 데이터베이스로 구축하는 방안을 마련하였다. 그리고 BIM기반 설계기준 검토 자동화 시스템 개발을 위한 프로세스도 제시하였다. 연구결과: Civil3D 및 Dynamo를 활용하여 BIM기반 설계기준 검토 자동화 모듈을 개발하고, 시범적용을 통해 설계과정에서 제작되는 BIM 객체의 건설설계기준 충족여부를 자동으로 신속하게 제공할 수 있음을 확인하였다. 결론: BIM기반 설계기준 검토 자동화 기술은 BIM 모델 제작 업무의 생산성 향상과 BIM 모델의 품질확보가 가능하다.

인간공학 기준에 의한 차세대형 주제어실 조명설계 및 조도 휘도 분석- 중국 광동 Ling Ao Phase II NPP MCR 환경디자인을 중심으로- (A Study on Lighting Design and Illumination and Luminance of in Advanced type Control Room by the Standard of Ergonomics - Focused on Ling Ao Phase II NPP MCR Environmental Design in Guangdong, China-)

  • 백승경;이승훈
    • 대한인간공학회지
    • /
    • 제27권2호
    • /
    • pp.73-82
    • /
    • 2008
  • Currently an office in information society is advanced to a digitalized VDT office. The VDT office has a natural luminous system prioritizing visual perception and so importance of lighting design by artificial lighting is emphasized in the VDT office. The purpose of the study is to analyze Illumination and Luminance for lighting design by the standard of ergonomics in the VDT office. The study analyzed Illumination and Luminance in the main control room of an nuclear power plant needing a design of ergonomics ACR(Advanced Control Room) type Ling Ao phase II NPP MCR in Guangdong, China. The study examined the relativity of ACR characteristics to its operator's duties and set up an outline of lighting design, the standard of ergonomics and input data for the analysis. Thus, the study examined appropriateness with the standard of ergonomics setting up the analyzed Illumination and Luminance and drew a conclusion.

Progressive Design-Build: Its Functions as a Contracting Method and the Four Pillars of Project Success

  • Jeong, Euiseok;Anderson, Connor;Lin, Ken-Yu;Migliaccio, Giovanni C
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.25-32
    • /
    • 2022
  • As a project delivery method, Design-Build (DB) has provided owner, architect, and contractor groups with a process of early design and rapid construction for the past three decades. Although there are many benefits to using standard DB, dissatisfaction has arisen due to limitations to innovate, limited owner involvement during design, and often lengthy procurement. Progressive Design-Build (PDB) has become an appealing alternative providing benefits not seen with standard DB. This paper investigates how PDB impacts a project and how it compares against standard DB; it also presents a proposed framework for evaluating the owner's responsibility and assessment of a project, which we named the "Four Pillars of Project Success". The four pillars are defined with respect to an owner's responsibility and assessment of a project, including project predictability, project risk, project schedule, and project cost. We conducted a literature review, examined several public project case studies, analyzed PDB project information collected by the Design-Build Institute of America (DBIA), and held stakeholder interviews with owners, contractors, and architects who have used both PDB and standard DB. This paper offers insight into PDB's structure and outcomes so an owner group can make an informed decision when considering PDB as their next construction contracting method.

  • PDF