• Title/Summary/Keyword: Design Project

Search Result 4,045, Processing Time 0.034 seconds

A Study of Instruction of Internet(IoI)-based Collaborative Learning Method in Elementary School Sixth Grade Mathematics Class (초등학교 6학년 수학수업에서의 수업인터넷 기반 협력학습 수업방법 탐색)

  • Choi, Byoung-Hoon;Yoon, Heon-Chul
    • Journal of Science Education
    • /
    • v.41 no.2
    • /
    • pp.248-266
    • /
    • 2017
  • The purpose of this study is to present various examples of collaborative learning based on the Instruction of Internet in the 6th grade elementary school mathematics class. So we introduce the design method of classroom environment for classroom Internet and give example of various teaching methods. This study was conducted for nine months from March to November, 2016, one sixth grade of elementary school in D area. During this period, we conducted Instruction of Internet-based collaborative learning to classify typical teaching cases. We classified into 5 type collaborative learning. First, collaborative learning in the classroom. Second, remote collaborative learning between classroom and classroom. Third, Live participation classes. Forth, project collaborative learning. Fifth, using virtual reality in collaborative learning. In addition, we could identify that there is a difference compared to the conventional learning. It became possible to conduct collaborative learning with other students simultaneously or have opening class with both parents and teachers by using Youtube. These examples can be presented as a case to depart from traditional mathematics class in one classroom. In this regard, we will be able to provide several implications about teaching methods utilizing smart device and Internet in future classroom.

Noise Prediction of Korea High Speed Train (KHST) and Specification of Sub-components (한국형 고속전철 차량소음 예측 및 부품 소음관리방안)

  • ;;;H.W. Thrane
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.917-923
    • /
    • 2002
  • KITECH and ODS performed a study of internal and external noise prediction of the KHST test train. The object of this study was 3 kind of cars; trailer car(TT2), motorized car(TM1) and power car(TP1) and the predicted noise was calculated for the two different driving speeds in free field and tunnel conditions. Data of carbody design and noise sources were delivered from each manufactures. Some of noise sources which were not available in project team, were chosen by experiences of ODS. Internal noise level of each car were predicted for two cases i.e, at 300 km/h and 350 km/h. In addition sound transmission path and dominant noise sources were also investigated of each section of car, which is circular shell typed part of whole carbody. In case of TT2, the dominating sound transmission path is floor in terms or structure-borne noise and air-borne noise. The main noise sources are structure-borne noise from the yaw-damper and air-borne noise from the wheel/rail contact, whereas the dominating sound transmission path of TM1 are floor and sidewall below the window in terms of structure-borne noise. The main noise sources of TM1 are structure-borne noise from motor/gear unit and the yaw-damper in the free field, and air-borne noise from the wheel/rail contact and structure-borne noise from motor/gear unit in the tunnel. Through the external noise prediction for the KHST test train formation, the noise form the wheel/rail contact is estimated as one of the major sources. In addition, the noise specification of sub-component was proposed for managing each sub-surpplier to reach the KHST noise requirement. The specification provide the sound power of machinery part and transmission loss of component of carbody structure. The predicted noise level in each case exceeded the required limit. Through this study, the noise characteristics of the test train were investigated by simulation, and then the actual test will be performed in near future. Both measured and calculated data will be compared and further work for noise reduction will be continued.

  • PDF

Describing Activities to Verify Artifacts(Documents and Program) in Software R&D (소프트웨어 R&D에서 산출물(문서와 프로그램) 검증을 위한 활동)

  • Dashbalbar, Amarmend;Lee, Eun-Chul;Lee, Jung-Won;Lee, Byeongjeong
    • Journal of Internet Computing and Services
    • /
    • v.17 no.2
    • /
    • pp.39-47
    • /
    • 2016
  • In software R&D artifacts including documents and program code are produced. There are two kinds of software R&D artifacts: Research artifacts and development artifacts. Research artifacts include software R&D planning document, annual report, final report, research note and so on. Software development artifacts include software requirements, software design description, testing plan, test report, and program code. It is important to verify the documents and to test code to check the direction of the R&D. Moreover, we should check relationships as such completeness and consistency between research and development artifacts. The verification and testing help project manager and researchers understand what they do during software projects. Therefore, in this study, we present a process to verify documents and program in software R & D. In the process we check documents produced in software R&D and test program code. We describe the process by using Essence elements including alpha, activity, and competency. We present a case study to show the effectiveness of the process.

Case Study of Civil-BIM & 3D Geographical Information (3차원 지형자료와 토목 BIM의 사례적용 연구)

  • Park, Jae-Sun;Pyeon, Mu-Wook;Jo, Jun-Ho;Lee, Gun-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.6
    • /
    • pp.569-576
    • /
    • 2011
  • Recently the establishment of high accuracy 3D spatial information has been largely stimulated according to the increase in need of such 3D spatial information. In the fields of constructions and civil works, studies on increasing the productivity in these fields through converging them with other fields using the established 3D spatial information have been conducted. In such a tendency, BIM (Building Information Modeling) technologies have been rapidly applied to the fields of constructions and civil works. In particular, in the fields of constructions and civil works that represent a life span of plan-design-construction-maintenance, some BIM application methods and plans for the characteristics in each step have been proposed. Thus, the objective of this study is to simulate a project that is reasonable and can be optimized in connection with 3D spatial information and BIM technologies escaped from the conventional civil construction process that is based on empirical, statistical DB, and 2D information. For achieving this objective, 3D terrain data for the subject area engaged in this study using aerial photographs and airborne LiDAR was established. Also, a counter plan for the issues, which cannot be solved in the conventional methods for managing civil work projects, is applied through implementing bridge-based civil structure BIM by combining them with objective information.

A Study of sea Dike meterials loss due to Scouring and Consolidation Settlement During the Periond of Construction on Construction on the West Cost of Korea (서해암 방조제 공사 기간중 유실토량 측정시험)

  • 안재숙
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.14 no.1
    • /
    • pp.2503-2519
    • /
    • 1972
  • The studies were carried out to find the cause and the quantitative evaluation of sea dike materials loss which is occured during the period of construction works for the tideland reclamation projects on the west coast of Korea. Major subjects to studies were to establish the typical relationships between the tidal flow and the movement of dike materials, the tidal-flow and the erosion, the dike materials and the ratio of material movement(losses), construction methods and the ratio of materials movement (losses). Based on the above subjects, the studies were made for the purpose of obtain the following informations; (1) Collecting and evaluaing the data of dike material losses due to foundation settlement, from designed existing dikes on the west coast. (2) By the field investigation at A-San Sea Dike, Pyong Taek Project, the Comparison would be made by the relationships between the tide velocity and the movement of dike foundation under the natural conditions and the period of construction so that find out the relationship between the dike materials of foundation situation and settlements. With regard to the dike construction works, it is so difficult to calculate the exact quantity of material losses due to the foundation settlements. The major factors that affect the settlement losses of the dike materials are: (1) Topographical variation (2) Swepting the sectional area of dike by the tide velocity. (3) Dumping riprap to the outerside of dike during the period of construction works. (4) Sectional area losses by the cause of occurence of the new tide channels. (5) material losses by the heavy storms. (6) Consolidation settlement by the foundation weakness. (7) Material losses by the earth materials by tide flow. Most hi호 material losses were occured by the Consolidation settlement due to the foundation weakness, the maximum tide velocities due to decrease the cross sectional area of the gaps and erosion of foundation due to the range of tide, Inner and outerside of dike, or dike material loses due to the tide flow. Final conclusion would be obtained by the continuous measurement of consolidation settlement at the stage of final clusure of the dike. (It is scheduled to close on the end of 1972) However, intermediate conclusion can be introduced as follows: (1) The estimation of material(losses) during the period of construction works for the existing sea-dikes up to date were only empirical. The material losses at the general closure for design was estimated at 10% of the riprap, 20% of the earth materials, and 20% of the riprap, 40% of the earth materials at the final closure of the dike. The final closure estimated double quantity to the general closure, but it is still doubt. (2) The ratio of consolidation settlements was found smaller than the calculated quantity. It can be foreseen that settlement speeds is higher thom the calculated speeds. (3) The movement of dike foundation under the natural conditions were not so depends on the geological conditions of the foundation. (4) When the tide velocities was estimated 100 at the normal tide, it was estimated 125 at the high tide and 55 at the low tide. The tide velocities at the low tide shows apparently lower than the high tide and the higher velocities at the deep water depth.

  • PDF

Enhancing Connectivity of Guiding Points at Road Signs (도로표지 안내지명의 연계성 확보 방안)

  • Kim, Eung-Cheol;Lee, Tae-Yoon;Kwon, Young-In
    • International Journal of Highway Engineering
    • /
    • v.8 no.4 s.30
    • /
    • pp.37-47
    • /
    • 2006
  • The road sign is one of street furnitures functioning to guide directions for drivers. The road sign should be employed and designed to help drivers find their destinations easily and accurately. It is obvious that the road sign is one of the main components that enhance efficiency and safety of driving environments. The current way of guiding strategy at road signs in Korea is a system for mainly guiding 'points' although a new system guiding 'road names' and 'street numbers' with the introduction of new address system is now being introduced on urban areas. When the regional territory management offices and local governments try to employ current road sign systems, they are supposed to follow the sign regulations which contains standard project processes, selection methods of guiding points, character size and design, and location selection for each road sign. However, the current road sign regulations are very complex to understand and unclear for a person in charge to do tasks described above. Especially, selection process and criteria of guiding points are cumbersome and controversial. Furthermore, non sufficient ways of selecting guiding points considering road functions and geographic characteristics decrease the connectivity of guiding points. This study develops enhanced ways of increasing connectivity of successive guiding points through three case studies. Developed ways will help highway agencies and officials understand how to improve the connectivity of road signs.

  • PDF

Framework for Improving Mobile Embedded Software Process (모바일 임베디드 소프트웨어 프로세스 개선 프레임워크)

  • Shin, Seung-Woo;Kim, Haeng-Kon;Kim, Soung-Won
    • Journal of Internet Computing and Services
    • /
    • v.10 no.5
    • /
    • pp.195-209
    • /
    • 2009
  • The embedded software has been become more important than the hardware in mobile systems in ubiquitous society. The improvement models such as CMMI(Capability Maturity Model Integration) and SPICE(Software Process Improvement and Capability dEtermination) are used to improve the quality of software in general systems. Software process improvement is also necessary for mobile embedded software development to improve its quality. It is not easy to apply the general software improvement model to the mobile embedded software development due to the high cost effectiveness and heavy process. On the other hand, XP has the characteristics on focused communications with customers and iteration development. It is specially suitable for mobile embedded software development as depending on customer's frequent requirement changes and hardware attributes. In this paper, we propose a framework for development small process improvement based XP(eXtreme Programming)'s practice in order to accomplish CMMI level 2 or 3 in mobile embedded software development at the small organizations. We design and implement the Mobile Embedded Software Process Improvement System(MESPIS) to support process improvement. We also suggest the evaluation method for the mobile embedded software development process improvement framework with CMMI coverage check by comparing other process improvement model. In the future, we need to apply this proposed framework to real project for practical effectiveness and the real cases quantitative. It also include the enhance the functionality of MESPIS.

  • PDF

3-Dimensional Terrain Model of Ruins Distribution Using GIS (GIS를 이용한 유적분포 3차원 지형모델)

  • Kwak, Young-Joo;Kang, In-Joon;Jang, Yong-Gu;Kang, Young-Shin;Kim, Sang-Seok
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.12 no.4 s.31
    • /
    • pp.27-33
    • /
    • 2004
  • Recently, as a part of NGIS project, cultural-assets digital map is produced by cultural properties administration and local autonomous entities. Cultural-assets unified GIS(Geographic Information System) is essential to cultural properties managers md other organizations which are executing land related business for appling it at planning stage. With explosive national land developments, it has been obligated to implement surface survey by the cultural properties protection Art. In this paper, the authors used the district of Sachon city and made 3D terrain model using digital map which is made of 1/5000 stale. Moreover, the authors improved to RDBMS(Relational Database Management System) structure and remodeled the existing DB design in detail, and also tried recovery of past sea level, based on researches about the water level of southern area. By recover past sea level. the shell mound, apart from lever is actually near lever at past, and it make sure its nature. The authors suggested to realize shape and kind of remains which have 3D information of accuracy and actualization from surface-surveying to excavation.

  • PDF

Numerical Experiments of Dynamic Wave Pressure Acting on the Immersed Tunnel on Seabed Foundation (해저지반 상부에 설치된 침매터널에 작용하는 동수압에 관한 수치실험)

  • Hur Dong Soo;Kim Chang Hoon;Yeom Gyeong Seon;Kim Do Sam
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.17 no.4
    • /
    • pp.294-306
    • /
    • 2005
  • Most immersed tunnels investigated have been investigated based on the engineer's experience with design and construction. From engineering point of view, it is very important to understand the wave interaction with the seabed and immersed tunnel, since the stability of an immersed tunnel depends largely on the behavior of the seabed foundation. In this study, for the first stage research to find out the mechanism of the wave interaction with the seabed and immersed tunnel, the benchmarking method called as direct numerical simulation (DNS) was employed to analyze comprehensively the wave-induced pore water pressures, vorticity and flows in seabed or inside rubble stone around the immersed tunnel. The immersed tunnel is modeled based on Busan-Geoje fixed link project in Korea, which is now on the stage of planning. Moreover, the nonlinear water wave interaction with an immersed tunnel/its seabed foundation was thoroughly examined with regard to the stabilities of the immersed tunnel subjected to various water wave conditions, median grain size and so forth.

Hydraulic Investigation of Pyokkolche Reservoir (벽골제의 수공학적 고찰)

  • Lee, Jang-U
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.4
    • /
    • pp.397-406
    • /
    • 1998
  • The Pyokkolche Reservoir was constructed as a major public project of the ancient agricultural society, 1600 years ago. From a hydraulic point of view, it is considered to have been carried out with a distinguished technology. It should be in particular noticed that for a consecutive banking the main stream was diverted and drained to the Yonpo stream and the dam with same sea levels on its top along the whole length was built in a nearly straight line in spite of the different sea levels between both ends on the bottom. These suggest that the carrying out artifice and surveying technigue of those days were considerably excellent. However, the insufficient plan and design at the time of the construction, the temporary management and the repeated repair works in the later ages caused the Pyokkolche to lose its function. The Changsaenggeo and Kyungjanggeo gate sites being the facilities for sluices composed of a simple span and a vertical lift hand-operated sing a pully. The advantage of the geographical characteristics at both ends of the main dam was scientifically taken to these sites which also functioned as a spillway against a flood. The gate site of Suyogeo must have been located in an entrance to Suwolri, the northern end of the Pyokkolche and Yutonggeo is presumed to have been located on the right of Sangsori, the southern end of the Pyokklche. Keywords : Pyokkolche Reservoir, construction technology, gate site location.

  • PDF