• Title/Summary/Keyword: Design Flood Estimation

Search Result 117, Processing Time 0.028 seconds

The Characteristics of Probable Maximum Flood on Wi Stream Watersheds (위천유역(渭川流域)의 가능최대홍수량(可能最大洪水量) 특성(特性))

  • Choi, Kyung-Sook;Suh, Seung-Duk
    • Current Research on Agriculture and Life Sciences
    • /
    • v.16
    • /
    • pp.37-44
    • /
    • 1998
  • The estimation of PMP (Probable Maximum Precipitation) and the analysis of characteristics of PMF (Probable Maximum Flood) according to the types of time distribution of rainfall and variations of base flow for the determination of design flood of major hydraulic structures in the watershed area of Wi stream were analysed. The PMP was estimated by the hydro-meteorological method suggested by the guideline of the World Meteorological Organization(WMO). The Blocking method was cited to transpose from PMP to PMS (Probable Maximum Storm) with time distribution. The unit hydrograph, applied for the estimation of PMF was derived by Clark's method. The summaryzed results : (1) The 72 hrs duration PMP in the area is 477.3mm which is 80mm less than the PMP map in Korea and 134 mm lager than the maximum precipitation of 342.9mm in Taegu, near the Wi stream watershed. (2) According to the types of time distribution and variations of base flow, the ranges of PMF for advanced type, central type and delayed type are 3,145.3~3,348.3cms, 3,774.6~3,977.7cms and 3,814.6~4,017.3cms, respectively. Those mean that peak discharge of advanced type is 600cms less than the central type and delayed type. (3) Delayed type among three types by Blocking method has been estimated the largest PMF of 4,017.3cms, and the advanced type has been estimated the smallest PMF of 3,145.3cms. The mean value of the peak PMF of 3,653.6cms may probably be resonable PMF in the Wi stream watershed. The mean PMF could probably be 1.7 times lager than the result of Gajiyama's equation. It is equivalent to the flood of return period 1,000 to 10,000 yrs.

  • PDF

Estimation of Probable Maximum Flood by Duration using Creager Method (Creager 기법을 이용한 지속시간별 가능최대홍수량 산정)

  • Kang, Boo-Sik;Ryu, Seung-Yeop
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.1
    • /
    • pp.77-84
    • /
    • 2011
  • The methods of the rational formula and Kajiyama formula have been widely used for estimating the peak flood for design to all kind of hydraulic structure. However, there are many limitations and we have to apply these methods to ungauged basin. These methods require to calculate the Probable Maximum Precipitation (PMP) before determining the Probable Maximum Flood (PMF). Creager's method (Creager et al., 1945) is a kind of estimation of specipic flood and this method provided nonlinear equations based on relationship between the drainage area and PMF in order to calculate the PMF of multipurpose dams over medium-sized. But this method has not much applied in Korea. Creager's coefficient is not clear about its application because this method has never been applied to dams in Korea. Based on the PMP for rainfull-runoff models with the PMF of small and larger dams in this research, the range and standard of Creager's coefficients with parameters are proposed to apply basin areas in Korea.

A Methodology for the Estimation of Design Flood of a Small Watershed (소하천유역(小河川流域)의 계획홍수량(計劃洪水量) 산정방법(算定方法)의 개발(開發))

  • Yoon, Yong Nam;Ahn, Tae Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.4 no.1
    • /
    • pp.103-112
    • /
    • 1984
  • This study is an effort to develop a series of empirical procedure for the determination of design flood for a small watershed based on the unit hydrograph theory. It is shown that a flood discharge of a watershed with a specific return period can be expressed as a product of its watershed area, rainfall factor, runoff factor and flood peak reduction factor. Since the procedures for the determination of rainfall factor and runoff factor were already developed in the previous study (13) a series of step-by-step procedure is devised to empirically determine the flood peak reduction factor in the present study. Using the methodology developed herein the 50-year design flood, which is of concern in the drainage of agricultural lands, is estimated for a watershed on upper Kyungan River and compared with the design floods by the existing methods now in use. The flood peak reduction factor was correlated with the dimensionless parameter consisted of the rainfall duration divided by the basin lag time, which was computed from the derived unit hydrographs by the method of moment. The unit hydrographs of various durations were synthesized by the method of build up and S-curve. A multiple correlation was also made between the basin lag time and the physiographic parameters of the watershed, i.e., the stream length and the average stream slope.

  • PDF

Flood Damage Reduction Plan Using HEC-FDA Model (HEC-FDA 모형을 이용한 홍수피해 저감계획)

  • Lee, Jongso;Kim, Duckhwan;Kim, Jungwook;Han, Daegun;Kim, Hung Soo
    • Journal of Wetlands Research
    • /
    • v.17 no.3
    • /
    • pp.237-244
    • /
    • 2015
  • This study is estimated the flood damage probability of the flood discharge, the flood stage estimation and Economic Analysis for Flood Control about considering of uncertainty. Sum River Basin has chosen and the probability precipitation is estimated by using the concept of critical rainfall duration depending on the frequency of each flood stage estimation point. For calculating the expected annual damage, the functions of long term hazard, discharge-frequency, stage-discharge and depth-damage are established for 8 areas in Sum River Basin. The expected annual damaged is obtained which is based on the sampling informations through more than 500,000 simulation from the functions of considered uncertainty. The result about the optimum frequency and Investment Priorities are estimated by conducting the evaluation about planning the levee of various of Design Frequency. In analysis result, 12% of B/C value has increased if the uncertainty has concerned. Also the optimum frequency or Investment Priorities are possible to be changed. If the political and social analysis perform together it would be helpful to have a reasonable decision other than only the economical analysis as actual Flood damaged reduction planning.

A study on the quick graphical method of flood routing (홍수추적 속산도식해법에 대한 소고)

  • 박정근
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.18 no.1
    • /
    • pp.4079-4086
    • /
    • 1976
  • In many reservoir projects, economic considerations will necessitate a design utilizing surcharge. Determination of the most economical combination of surcharge and spillway capacity for a given spillway crest level will require flood routing studies and economic studies of the dam-reservoir-spillway combinations. Many methods of actual flood routing have been devised, each of them with its advantages and disadvantages. Some of these methods are listed below: (1) Arithmetical trial-and-error method. (2) Modified Puls' method (3) Cheng's graphical method (4) Horton's arithmetical method (5) Ekadahl's arithmetical method (6) Digital computer programming. For the purpose of preliminary design and cost estimating of dams and spillways, it is often required to estimate, for a given design flood and spillway crest level. the approximate values of two among the three characteristics of the spillway spillway length, maximum discharge and surcharge depth at maximum discharge, when one of these quantities is given. As is well known, the outflow hydrograph for an ungated overflow spillway assumes the form of a wave-shaped curve with a minimum point for Q=o At zero time and a maximum point for Q=Qmax at its intersection with the falling leg of the inflow hydrograph (see Fig. 4) The shaded area between the inflow and outflow hydrographs represents at the approximate scale the temporary retention Vt. In line with the remarks, draw by free hand the assumed outflow hydrograph with its maximum point for the given Qmax (see Fig. 4) and by planimetration find Vt. From the reservoir capacity curve (Fig. 3) find Vs for the given spillway crest level and make V=Vs+Vt. From the above curve find surcharge water elevation for V and surcharge depth Hmax over spillway crest. From the discharge formula compute {{{{L= { Q} over { { CH}^{3/2 } } }}}} The methed provides a means for a quick and fairly accurate estimation of spillway capacity.

  • PDF

The Analysis of Flood in an Ungauged Watershed using Remotely Sensed and Geospatial Datasets (I) - Focus on Estimation of Flood Discharge - (원격탐사와 공간정보를 활용한 미계측 유역 홍수범람 해석에 관한 연구(I) - 홍수량 산정을 중심으로 -)

  • Son, Ahlong;Kim, Jongpil
    • Korean Journal of Remote Sensing
    • /
    • v.35 no.5_2
    • /
    • pp.781-796
    • /
    • 2019
  • This study attempted to simulate the flood discharge in the Duman River basin containing Hoeryong City and Musan County of North Korea where were damaged from Typhoon Lionrock on August, 2016. For hydrological modelling remotely sensed datasets were used to estimate watershed properties and hydrologic factors because the basin is ungauged where hydrological observation is not exist or sparse. For validation we applied our methodology and datasets to the Soyanggang Dam basin. It has not only similar shape factor and compactness ratio to those of the target basin but also accurate, adequate, and abundant measurements. The results showed that the flood discharge from Typhoon Lionrock corresponded to three to five years design floods in the Duman River basin. This indicate that the Duman River basin has a high risk of flood in the near future. Finally this study demonstrated that remotely sensed data and geographic information could be utilized to simulate flood discharge in an ungauged watershed.

Regional frequency analysis for stationary and nonstationary hydrological data (정상성 및 비정상성 수문자료의 지역빈도해석)

  • Heo, Jun-Haenga;Kim, Hanbeen
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.10
    • /
    • pp.657-669
    • /
    • 2019
  • To estimate accurate design quantiles considering statistical characteristics of hydrological data is one of the most important procedures in the design of hydraulic structures. While at-site frequency analysis estimates design quantile using observed data at a site of interest, regional frequency analysis (RFA) utilizes a number of sites included in a hydrologically homogeneous region. Therefore, RFA could provide a more accurate design quantile at ungauged site or sites with short observation period. In this review article, RFA is classified into stationary RFA and nonstationary RFA depending on the characteristic of hydrological data, and the basic concept, procedure, and application of each technique are explained in detail focused on the index flood method. Additionally, a review of the state of the art for RFA procedure is presented. This paper is finalized by describing the stationary regional rainfall frequency analysis over South Korea contained in the amendment of "Standard guidelines for design flood estimation" and various future study topics related to nonstationary RFA.

Watershed-based PMF and Sediment-runoff Estimation Using Distributed Hydrological Model (분포형 수문모형을 이용한 유역기반의 PMF 및 유사-유출량 산정)

  • Yu, Wansik;Lee, Giha;Kim, Youngkyu;Jung, Kwansue
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.2
    • /
    • pp.1-11
    • /
    • 2018
  • Probable Maximum Flood (PMF) is mostly applied for the designs of large-scale hydraulic structures and it is estimated by computing the runoff hydrograph where Probable Maximum Precipitation (PMP) is inserted as design rainfall. The existing PMP is estimated by transferring the heavy rainfall from all watersheds of korea to the design watershed, however, in this study, PMP was analyzed by selecting only rainfall events occurred in the design watershed. And then, Catchment-scale Soil Erosion Model (CSEM) was used to estimate the PMF and sediment-runoff yield according to the watershed-based estimated PMP. Although the PMF estimated in this study was lower than the existing estimated PMF in the Yongdam-dam basin, it was estimated to be higher than the 200-year frequency design flood discharge. In addition, sediment-runoff yield was estimated with a 0.05 cm of the maximum erosion and a 0.06 cm of the maximum deposition, and a total sediment-runoff yield of 168,391 tons according to 24-hour PMP duration.

Estimation of Pollutants Residence Time During the Flood and Dry Season in Gwangyang Bay (광양만의 홍수기 및 갈수기의 오염물질 체류시간 산정)

  • Lee, In-Cheol;Kim, Jin-Hyuk;Kong, Hwa-Hun
    • Journal of Ocean Engineering and Technology
    • /
    • v.22 no.6
    • /
    • pp.20-26
    • /
    • 2008
  • In this paper, in order to set up the management system of water quality environment in Gwangyang Bay, the cluster analysis of water quality environment, the estimation of inflowing pollutant loads and residence time of pollutants in this bay was carried out. The Gwangyang Bay was divided into eight sea areas by cluster analysis and spatio-temporal change of water quality. The river discharges in the Bay were calculated about $11,681{\times}103m^3/day$ from the numerical simulation by Tank model. In addition, inflowing pollutant loads of COD, SS, TN, TP, DIN and DIP in Gwangyang Bay were estimated at 398 ton-COD/day, 2,846 ton-SS/day, 195 ton-TN/day, 5 ton-TP/day, 126 ton-DIN/day and 3 ton-DIP/day, respectively. Moreover, residence times of COD, TN and TP in the Bay was estimated at 6 days-COD, 20 days-TN and 195 days-TP, respectively in the dry season, and 3 days-COD, 6 days-TN and 21 days- TP, respectively, in the flood season. The central part of Gwangyang Bay (Region IV) has the longest residence time of overall pollutants.

A review of ground camera-based computer vision techniques for flood management

  • Sanghoon Jun;Hyewoon Jang;Seungjun Kim;Jong-Sub Lee;Donghwi Jung
    • Computers and Concrete
    • /
    • v.33 no.4
    • /
    • pp.425-443
    • /
    • 2024
  • Floods are among the most common natural hazards in urban areas. To mitigate the problems caused by flooding, unstructured data such as images and videos collected from closed circuit televisions (CCTVs) or unmanned aerial vehicles (UAVs) have been examined for flood management (FM). Many computer vision (CV) techniques have been widely adopted to analyze imagery data. Although some papers have reviewed recent CV approaches that utilize UAV images or remote sensing data, less effort has been devoted to studies that have focused on CCTV data. In addition, few studies have distinguished between the main research objectives of CV techniques (e.g., flood depth and flooded area) for a comprehensive understanding of the current status and trends of CV applications for each FM research topic. Thus, this paper provides a comprehensive review of the literature that proposes CV techniques for aspects of FM using ground camera (e.g., CCTV) data. Research topics are classified into four categories: flood depth, flood detection, flooded area, and surface water velocity. These application areas are subdivided into three types: urban, river and stream, and experimental. The adopted CV techniques are summarized for each research topic and application area. The primary goal of this review is to provide guidance for researchers who plan to design a CV model for specific purposes such as flood-depth estimation. Researchers should be able to draw on this review to construct an appropriate CV model for any FM purpose.