• 제목/요약/키워드: Design Cost Estimation Model

검색결과 173건 처리시간 0.027초

개선된 유전적 프로그래밍 방법을 이용한 부유식 해양 구조물의 중량 추정 모델 연구 (A Study on Weight Estimation Model of Floating Offshore Structures using Enhanced Genetic Programming Method)

  • 엄태섭;노명일;신현경
    • 대한조선학회논문집
    • /
    • 제52권1호
    • /
    • pp.1-7
    • /
    • 2015
  • The weight estimation of floating offshore structures such as FPSO, TLP, semi-Submersibles, Floating Offshore Wind Turbines etc. in the preliminary design, is one of direct measures of both construction cost and basic performance. Through both literature investigation and internet search, the weight data of floating offshore structures such as FPSO and TLP was collected. In this study, the weight estimation model with the genetic programming was suggested for FPSO. The weight estimation model using genetic programming was established by fixing the independent variables based on this data. In addition, the correlation analysis was performed to make up for the weak points of genetic programming; it is apt to induce over-fitting when the number of data is relatively smaller than that of independent variables. That is, by reducing the number of variables through the analysis of the correlation between the independent variables, the increasing effect in the number of weight data can be expected. The reliability of the developed weight estimation model was within 2% of error rate.

A Study on the Optimum Design Flowrate for Tunnel-Type Small Hydro Power Plants

  • Lee, Chul-Hyung;Park, Wan-Soon
    • Korean Journal of Hydrosciences
    • /
    • 제3권
    • /
    • pp.81-96
    • /
    • 1992
  • This study represents the methodology for feasibility analysis of small hydro power SHP plant. Cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP candidate site. The perfomance prediction model and construction cost estimation model for tunnel-type SHP plant were developed. Eight tunnel -type SHP candidate sites existing on Han-river were selected and surveyed for actual site reconnaissance. The performance characteristics and economical feasibility for these sites were analyzed by using developed models. As a result, it was found that the optimum design flowrate with the lowest unit generation cost for tunel-type SHP candidate site were the flowrate concerming with between 20% and 30% of time ratio on the flow duration curve. Additionally, primary design specifications such as design flowrate, effective head, capacity, annual averageload factor, annual electricity production were estimated and discussed for eight surveyed SHP candidate sites.

  • PDF

BIM기반 건축물 수선교체비 산정 프로세스 (BIM-based Repair&Replacement (R&R) Cost Estimating Process)

  • 박지은;유정호
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.31-38
    • /
    • 2016
  • 건설사업비 중 건축물의 유지관리비용이 차지하는 비중이 초기투자비만큼이나 상당하며 국내의 경우 건설공사의 생애주기비용(LCC)관점에서 설계VE검토 업무를 시행하고 있다. 건설산업의 정보화와 고도화 급속히 진행됨에 따라 BIM에 대한 관심이 고조되고 있다. 2012년부터 조달청은 500억원 이상인 공공공사에 BIM적용을 의무화를 시작으로 2016년부터 조달청이 발주하는 모든 공공공사에 BIM적용이 의무화된다. 건축설계의 패러다임이 2D방식에서 3D, 데이터관리 관점의 BIM으로의 전환이 정책적으로 이루어지고 있는 환경에서, LCC측면에서의 BIM활용에 대한 연구는 미흡한 실정이다. 특히, LCC분석 요소 중 하나인 수선교체비 산정을 위한 BIM 소프트웨어는 부재하며 상용화된 BIM저작도구에서 수선교체비 산정을 위한 정보의 전달이 부족하다. 따라서 본 연구에서는 데이터 표준 포맷인 IFC기반 수선교체비 산정을 위한 프로세스를 제안한다. 먼저, 현재 존재하는 수선교체 기준을 분석하고 BIM기반 수선교체비 산정 요구정보를 정의한다. 정의된 요구정보는 각 정보에 해당하는 IFC를 통해 추출되고, BIM기반 수선교체비 산정 요구정보 DB에 저장된다. 이는 외부 DB인 수선교체기준DB와 단가DB와 연계하여 수선교체비를 산정한다. 본 연구가 제시하는 프로세스를 통해 BIM환경에 대응하여 BIM모델을 활용한 수선교체비 산정의 효율화를 기대하며 수선교체비 뿐만 아니라 초기공사비, 에너지비용, 유지관리비용에 이르기까지 향후 LCC분석 요소에 확장하여 적용이 가능할 것이며 BIM기반 LCC분석의 표준화에 기여할 수 있다.

매개변수기법을 이용한 고속철도 노반공사의 개략공사비 예측모델 (Conceptual Cost Estimation Model Using by a Parametric Method for High-speed Railroad)

  • 이영주;장성용
    • 대한토목학회논문집
    • /
    • 제31권4D호
    • /
    • pp.595-601
    • /
    • 2011
  • 고속철도 기본계획단계에서 노반공사의 토공사 공사비 추정은 단위길이당 공사비(원/km)를 활용하고 있다. 이 단가는 과거자료를 기준으로 한 산술평균으로 오차가 클 수 있으며, 기본설계 단계 등 다음단계의 견적과 연계성이 부족한 단점이 있다. 본 연구는 철도연장에 토공사의 기술적 특성인 지질조건을 추가하는 매개변수 기반 개략공사비 산정모델을 제시한다. 데이터분석은 회귀분석법을 적용하였으며, 독립변수는 길이, 지질(토사, 풍화암, 연암, 경암) 구성 비율이고, 36개 공구 실적공사비를 참조하였다. 개발된 모델은 실적공사비와 비교한 결과 -0.4% ~ +31% 범위로 나타나, 전형적 범위인 -30% ~ +50% 이내이므로 유효한 것으로 판정한다. 본 모델은 공사비 영향의 주요요인인 길이에 기술적 특성인 지질요건을 추가함으로써 공사비 산정결과의 신뢰도 향상을 꾀함으로써 단계별 효과적 총사업비관리, 재정지출 감소 및 사업의 경제성 확보에 기여할 수 있을 것으로 기대된다.

Cost Analysis of Vertical Greenery in Urban Complex

  • Dong, Nannan;Huang, Fang
    • 국제초고층학회논문집
    • /
    • 제10권1호
    • /
    • pp.29-34
    • /
    • 2021
  • Vertical greenery has become an important technological means to improve the ecological environment condition in urban high-density areas, especially in central areas of Chinese cities. The cost of vertical greenery has significantly increased both in the decision-making process of architectural design and in the assessment of the sustainability potential of urban complexes. The estimation and evaluation of the cost of vertical greenery have become important obstacles to multi-party investment in the construction of vertical greenery. Considering the factors of the building typology and full life-cycle cost, this paper constructs an assessment model of vertical greenery in seven types in urban complex, and suggests an optimized approach to vertical greenery in an urban complex.

비선형 회귀 분석을 이용한 부유식 해양 구조물의 중량 추정 모델 연구 (A Study on the Weight Estimation Model of Floating Offshore Structures using the Non-linear Regression Analysis)

  • 서성호;노명일;신현경
    • 대한조선학회논문집
    • /
    • 제51권6호
    • /
    • pp.530-538
    • /
    • 2014
  • The weight estimation of floating offshore structures such as FPSO, TLP, semi-Submersibles, Floating Offshore Wind Turbines etc. in the preliminary design, is one of important measures of both construction cost and basic performance. Through both literature investigation and internet search, the weight data of floating offshore structures such as FPSO and TLP was collected. In this study, the weight estimation model was suggested for FPSO. The weight estimation model using non-linear regression analysis was established by fixing independent variables based on this data and the multiple regression analysis was introduced into the weight estimation model. Its reliability was within 4% of error rate.

An Efficient Attitude Reference System Design Using Velocity Differential Vectors under Weak Acceleration Dynamics

  • Lee, Byungjin;Yun, Sukchang;Lee, Hyung-Keun;Lee, Young Jae;Sung, Sangkyung
    • International Journal of Aeronautical and Space Sciences
    • /
    • 제17권2호
    • /
    • pp.222-231
    • /
    • 2016
  • This paper proposes a new method achieving computationally efficient attitude reference system for low cost strapdown sensors and microprocessor platform. The main idea in this method is to define and compare velocity differential vectors, geometrically computed from INS and GPS data with different update rate, for generating attitude error measurements which is further used for filter construction. A quaternion based Kalman filter configuration is applied for the attitude estimation with the adapted measurement model of differential vector comparison. Linearized model for Extended Kalman Filter and low pass filtered characteristics of measurement greatly extend the affordability of the proposed algorithm to the field of simple low cost embedded systems. For performance verification, experiment are done employing a practical low cost MEMS IMU and GPS receiver specification. Performance comparison with a high grade navigation system demonstrated good estimation result.

표준단면을 이용한 터널 공사비 예측모델 개발 (I) - 공사비 영향요인 분석 - (Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors -)

  • 조정연;김경주;김경민;김상귀
    • 대한토목학회논문집
    • /
    • 제28권5D호
    • /
    • pp.665-675
    • /
    • 2008
  • 본 연구는 터널공사를 대상으로 사업 초기단계에서 터널공사의 설계 대안에 대한 공사비를 신속히 추정하고, 사업이 진행되면서 상황변화에 따른 사업비 측면에서의 영향을 파악할 수 있도록 함으로써, 적정한 의사결정을 지원하기 위한 개략적 터널공사비 추정모델 제시를 목적으로 한다. 이를 위해 터널공사의 수행에 있어 공사비에 영향을 미치는 요인을 분석하고, 공사비 영향요인별 공사비 변화의 정도를 분석하였다. 공사비 영향요인은 천공방식, 굴착방법, 기폭장치, 적재장비 용량, 버력의 단위중량 및 토량환산계수, 터널 연장을 포함하는 7개의 요인을 대상으로 하여 각 영향요인의 변화에 따른 공사비 변동 크기를 분석하였다. 분석결과는 기획단계에서 사업의 기본적인 조건을 바탕으로 사업비를 추정하고, 설계 및 시공단계에서 설계 대안에 대한 공사비의 영향을 효율적으로 평가하는데 필요한 공사비 추정모델의 구축을 위한 기초정보를 제공할 것으로 기대된다.

와이블 수명분포에 근거한 소프트웨어 개발모형의 비용 분석에 관한 비교 평가 (Comparative Evaluation on the Cost Analysis of Software Development Model Based on Weibull Lifetime Distribution)

  • 배효정
    • 한국인터넷방송통신학회논문지
    • /
    • 제22권3호
    • /
    • pp.193-200
    • /
    • 2022
  • 본 연구에서는 소프트웨어 신뢰성 분야에서 많이 사용하는 Weibull 수명 분포((Goel-Okumoto, Rayleigh, Type-2 Gumbe)에 근거하여 유한 고장 NHPP 소프트웨어 신뢰성 모형을 소프트웨어 개발 모형에 적용한 후, 비용의 속성을 비교하여, 분석하였다. 본 연구를 위하여 소프트웨어 시스템의 정상 운용 중 검출된 고장시간 데이터를 수집하여 사용하였고, 제안된 모형의 모수 추정은 최우추정법을 적용하였으며, 비선형 방정식의 계산은 이분법을 사용하여 해결하였다. 그 결과, 첫째, 소프트웨어 개발 모형의 단위 시간당 테스팅 비용과 단일 고장을 제거하는 비용이 증가하면 비용은 증가하였지만 방출시간은 변하지 않았고, 정상적인 시스템 운용 중에 검출된 고장 수리 비용이 증가하면 비용 증가와 함께 방출 시간도 지연됨을 알 수 있었다. 둘째, 제안된 모형들을 종합적으로 비교 분석한 결과, Type-2 Gumble 모형이 Rayleigh 모형과 Goel-Okumoto 기본 모형 보다 개발비용이 적고, 방출 시간 포인트도 상대적으로 빨라서 가장 효율적인 모형임을 알 수 있었다. 셋째, 본 연구를 통하여 Weibull 분포 모형의 개발비용 속성을 새롭게 분석하였으며, 분석된 데이터는 소프트웨어 개발자들이 개발 비용과 방출 시간에 대한 속성을 탐색하는 데 필요한 설계 데이터로 활용할 수 있을 것으로 기대한다.

교통사고의 심리적 비용 산정모형 개발에 관한 연구 (A Study on the Development of an Estimation Model: The Psychological Cost of Traffic Accidents)

  • 유정복;손의영
    • 대한교통학회지
    • /
    • 제26권3호
    • /
    • pp.211-221
    • /
    • 2008
  • 본 논문에서는 교통사고로 인해 사고 피해자 및 그 가족이나 친지, 주변사람들이 느끼는 정신적 고통을 사회적비용으로 환산한 심리적비용에 대해 고찰하여 보았다. 선택실험방법, 직접질문법, 양분선택형방법 등 3가지 방법을 사용하여 설문설계를 하였으며 이들 설문 설계방법별로 각각의 모형을 구축하였다. 모형 구축 시에는 확률선택모형에서 가장 일반적으로 사용되는 로짓모형을 이용하였으며 직접질문법은 토빗모형을 이용하였다. 이들 모형을 검증한 결과 모형에 따라 차이는 있었으나 대부분 모형의 적합도 및 각 계수의 신뢰도가 95% 신뢰수준에서 유의한 것으로 나타났다. 심리적비용 산정모형으로 산출된 국내 도로교통사고의 심리적비용은 사상자 1인당 1,563만원으로 총 5조 1천억 원이며, 전체 교통사고비용의 37.1%를 점유하는 것으로 분석되었다.