• 제목/요약/키워드: Design Cost Estimation Model

검색결과 173건 처리시간 0.023초

DUMMY모선을 고려한 상태추정 측정점선정 알고리즘에 관한 연구 (A Study on Measurement Selection Algorithm for Power System State Estimation Under the Consideration of Dummy Buses)

  • 문영현;이태식
    • 대한전기학회논문지
    • /
    • 제41권2호
    • /
    • pp.107-117
    • /
    • 1992
  • This paper presents an improved algorithm of optimal measurement design with a reliability evaluation method for a large power system. The proposed algorithm is developed to consider the dummy bus and to achieve highest accuracy of the state estimator as well with the limited investment cost. The dummy bus in the power system is impossible to install measurement meter, while real and reactive power measurements is considered in the proposed algorithm. On the other hand, P/C model is developed by taking advantage of the matrix sparsity. The improved program is successfully tested for KEPCO system with PSS/E lineflow calculated data package.

  • PDF

팔의 자세예측을 위한 비용함수의 개발에 관한 연구

  • 최재호;김성환;정의승
    • 대한인간공학회:학술대회논문집
    • /
    • 대한인간공학회 1994년도 춘계학술대회논문집
    • /
    • pp.115-123
    • /
    • 1994
  • A man model can be used as an effective tool to design ergomonically sound products and workplaces, and subsequently evaluate them properly. For a man model to be truly useful, it must be integrated with a posture prediction model which should be capable of representing the human arm reach posture in the context of equipments and workspaces. Since the human movement possesses redundant degrees of freedom, accurate representation or prediction of human movemtn was known to be a difficult problem. To solve this redundancy problem, the psychophysical cost function can predict the arm reach posture accurately. But the joint discomfort that human feels at the joint can not be predicted since the effects of external factors on the joint discomfort is not known. In this study a psychophysical experi- ment using the magnitude estimation technique was performed to evaluate the effects of external factors such as joint, joint angle and Perceived Exertion Ratio on the joint discomfort. Results showed that the joint discomfort increased as the Perceived Exertion Ratio increased, but the relation is not linear and was affected not only by the joint but also by the joint angle for the same Perceived Exertion Ratio. The interaction effect of the joint and the joint angle was also significant. From the results it is needed to develope the cost function which can predict the joint discomfort considering the joint, joint angle and external load.

  • PDF

A Reliability Sampling Plan Based on Progressive Interval Censoring Under Pareto Distribution of Second Kind

  • Aslam, Muhammad;Huang, Syuan-Rong;Chi, Hyuck-Jun;Ahmad, Munir;Rasool, Mujahid
    • Industrial Engineering and Management Systems
    • /
    • 제10권2호
    • /
    • pp.154-160
    • /
    • 2011
  • In this paper, a reliability sampling plan under progressively type-1 interval censoring is proposed when the lifetime of products follows the Pareto distribution of second kind. We use the maximum likelihood estimator for the median life and its asymptotic distribution. The cost model is proposed and the design parameters are determined such that the given producer's and the consumer's risks are satisfied. Tables are given and the results are explained with examples.

Applications of bridge information modeling in bridges life cycle

  • Marzouk, Mohamed M.;Hisham, Mohamed;Al-Gahtani, Khalid
    • Smart Structures and Systems
    • /
    • 제13권3호
    • /
    • pp.407-418
    • /
    • 2014
  • The purpose of this paper is to present an Integrated Life Cycle Bridge Information Modeling that can be used throughout different phases of the bridge life cycle including: design, construction, and operation and maintenance phases. Bridge Information Modeling (BrIM) has become an effective tool in bridge engineering and construction. It has been used in obtaining accurate shop drawings, cost estimation, and visualization. In this paper, BrIM is used as an integrated tool for bridges life cycle information modeling. In the design phase, BrIM model can be used in obtaining optimum construction methods and performing structural advanced analysis. During construction phase, the model selects the appropriate locations for mobile cranes, monitors the status of precast components, and controls documents. Whereas, it acts as a tool for bridge management system in operation and maintenance phase. The paper provides a detailed description for each use of BrIM model in design, construction, and operation and maintenance phases of bridges. It is proven that BrIM is an effective tool for bridge management systems throughout their life phases.

공동주택의 시간의존적 설계VE 및 LCC분석 모델 (A Model of Time Dependent Design Value Engineering and Life Cycle Cost Analysis for Apartment Buildings)

  • 서광준;최미라;신남수
    • 한국건설관리학회논문집
    • /
    • 제6권6호
    • /
    • pp.133-141
    • /
    • 2005
  • 최근에 공동주택 건설사업을 위한 가치공학 및 생애주기비용(LCC)분석의 중요성이 대두됨에 따라, 대형 건축물의 건설사업에서 가치공학 및 생애주기분석을 위한 이론적 모델, 표준지침 및 소프트웨어 등이 개발되어지고 있다. 그러나 현재까지도 실질적인 과거 보수이력데이터의 부재로 인한 VE 및 LCC분석 결과에 대한 신뢰수준이 미흡하다. 본 연구에서는 공동주택의 건설사업에 대한 합리적인 투자의사결정과 설계대안선정을 위한 시간의존적 LCC분석에 의한 가치분석 방법론을 제시하였다. 제안된 방법론은 과거이력데이터의 불확실성과 분석대안의 가치분석을 보다 합리적으로 고려하기 위한 시간의존적 생애주기비용 모델과 퍼지로직에 의한 성능평가기법과의 상관관계를 규명하였다. 또한, 제시된 시간의존적 생애주기비용 모델과 가치분석 절차의 타당성을 검토하기 위하여 실제대상사업에 적용하였다. 본 연구에서 제안된 방법론은 공동주택 건설사업에서의 설계대안 선정, 생애주기 비용 평가 및 합리적인 예산의 분배 등에 크게 기여할 것으로 기대된다.

Estimation of Design Wave Height for the Waters around the Korean Peninsula

  • Lee, Dong-Young;Jun, Ki-Cheon
    • Ocean Science Journal
    • /
    • 제41권4호
    • /
    • pp.245-254
    • /
    • 2006
  • Long term wave climate of both extreme wave and operational wave height is essential for planning and designing coastal structures. Since the field wave data for the waters around Korean peninsula is not enough to provide reliable wave statistics, the wave climate information has been generated by means of long-term wave hindcasting using available meteorological data. Basic data base of hindcasted wave parameters such as significant wave height, peak period and direction has been established continuously for the period of 25 years starting from 1979 and for major 106 typhoons for the past 53 years since 1951 for each grid point of the North East Asia Regional Seas with grid size of 18 km. Wind field reanalyzed by European Center for Midrange Weather Forecasts (ECMWF) was used for the simulation of waves for the extra-tropical storms, while wind field calculated by typhoon wind model with typhoon parameters carefully analyzed using most of the available data was used for the simulation of typhoon waves. Design wave heights for the return period of 10, 20, 30, 50 and 100 years for 16 directions at each grid point have been estimated by means of extreme wave analysis using the wave simulation data. As in conventional methodsi of design criteria estimation, it is assumed that the climate is stationary and the statistics and extreme analysis using the long-term hindcasting data are used in the statistical prediction for the future. The method of extreme statistical analysis in handling the extreme vents like typhoon Maemi in 2003 was evaluated for more stable results of design wave height estimation for the return periods of 30-50 years for the cost effective construction of coastal structures.

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

개방형BIM기반의 건축공사 개산견적을 위한 물량산출 적용지침 활용방안 기초 연구 (A Basic Study on an Application of Quantity Take-Off Requirements for Open BIM-based Schematic Estimation of Architectural Work)

  • 김인한;엄성곤;최중식
    • 한국CDE학회논문집
    • /
    • 제20권2호
    • /
    • pp.182-192
    • /
    • 2015
  • In recent years, numerous studies have attempted to extract quantity data by using Building Information Modeling (BIM). In terms of open-BIM based quantity take-off at the early design stage, only few studies were conducted in the field of cost engineering. A lack of compatibility of open BIM for information exchange is postulated as the cause. The Industry Foundation Classes (IFC) extension model has been developed to accommodate the interoperability with quantity take-off software. Improvement of open BIM for quantity take-off needs exchange requirements and model guidelines. For this purpose, the quantity data of IFC models were analyzed using BIM analysis tools. This paper also provides a proposal of requirements on open BIM based quantity take-off at the early design stage. Further this study have been develop the interface system for open BIM based quantity take-off requirements with the results on this study.

토션빔액슬 성능 평가를 위한 해석 모델 검증에 관한 연구 (A Study on the Simulation Model Verification for Performance Estimation of Torsion Beam Axle)

  • 최성진;박정원;전광기;이동재;최규재;박태원
    • 한국자동차공학회논문집
    • /
    • 제14권2호
    • /
    • pp.107-113
    • /
    • 2006
  • The torsion beam axle type is widely used in the rear suspension for small passenger cars due to low cost, good performance, etc. To develop the torsion beam axle, it is necessary to estimate the characteristics of rear suspension from the design process. The characteristics estimation of the torsion beam axle is performed using FEM, dynamic simulation and is verified the real test. In this study, the natural frequency and roll stiffness of the torsion beam axle were measured by FEM, and the reliability of the FE model was evaluated according to the comparison of test data. This study presents a unique method for the finite element modeling and analysis of the torsion beam axle. The results of the FEA were verified using test data.

진술선호방법을 이용한 공공 데이터의 가치 평가: 농업토양정보 데이터베이스 사례 (Valuation of Public Data Using Stated Preference Method: The Case of Agriculture Soil Database)

  • 이상호;하성호;정기호
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제27권4호
    • /
    • pp.149-165
    • /
    • 2018
  • Purpose As Korean economy has been sluggish in recent years, firms' interest in publicly financed projects has increased due to the relatively increasing proportion in the economy. Since 1999, publicly financed projects in Korea need to undergo preliminary feasibility study to evaluate economic efficiency and policy quality if they are larger than a certain scale. The benefits of public projects are one of the most important factors in the preliminary feasibility study but are difficult to estimate due to their nature. Design/methodology/approach This study estimates the benefits of the agricultural soil information database, a public database in Korea. The method used in the study is the stated preference method which is formally used in Korea's preliminary feasibility study. Data are collected through surveys and a logit model is constructed to be estimated by the maximum likelihood estimation method. Findings As the first study evaluating a public database, this study can be used as a baseline in all public database projects developed in the future. In addition, this study can contribute to improving the understanding of both private companies and public organizations who are interested in the cost-benefit analysis and estimation procedure for the publicly financed projects.