• 제목/요약/키워드: Design Cost

검색결과 8,469건 처리시간 0.039초

교량의 생애주기비용 분석을 위한 비용함수 모델 및 시스템 개발 (Development of System and Cost Function Model for Life Cycle Cost Analysis of Bridge)

  • 박미연;선종완;엄인수;조효남
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.704-711
    • /
    • 2005
  • Recently Life Cycle Cost Analysis for civil infrastructures such as pavements, bridges, and dams has been emphasized However, so far, there are few systems available for life cycle cost analysis of bridges at design stage. Therefore, the objective of this paper is to develop a user-friendly life-cycle cost analysis system for LCC-effective optimal design decision making at design stage. The program is based on the proposed LCC model, formulation, analysis modules and systematic procedure that suit Korean construction conditions. It is expected that the developed system can be effectively utilized for more LCC-effective design of bridges. It is applied to an actual bridge design project in order to demonstrate its effectiveness and applicability.

  • PDF

배관망에서의 파이프 직경 최적설계에 대한 실용적 해법 (A Practical Approach for Optimal Design of Pipe Diameters in Pipe Network)

  • 최창용;고상철
    • 설비공학논문집
    • /
    • 제18권8호
    • /
    • pp.635-640
    • /
    • 2006
  • An optimizer has been applied for the optimal design of pipe diameters in the pipe flow network problems. Pipe network flow analysis, which is developed separately, is performed within the interface for the optimization algorithm. A pipe network is chosen for the test, and optimizer GenOpt is applied with Holder-Mead-O'Niell's simplex algorithm after solving the network flow problem by the Newton-Raphson method. As a result, optimally do-signed pipe diameters are successfully obtained which minimize the total design cost. Design cost of pipe flow network can be considered as the sum of pipe installation cost and pump operation cost. In this study, a practical and efficient solution method for the pipe network optimization is presented. Test system is solved for the demonstration of the present optimization technique.

생산시스템의 설계/제조에서의 생애비용(LCC)에 관한 연구 (A Life Cycle Cost Analysis in Design and Manufacturing of Production System)

  • 함효준
    • 산업경영시스템학회지
    • /
    • 제18권34호
    • /
    • pp.173-183
    • /
    • 1995
  • Life cycle cost has been one of the key criteria in design or purchasing of systems, particularly in the flying weapon system. Unexpected cost increase or system breakdown during the system life can be reduced by controlling maintenance cost A system should be designed for maintainability in early stage of product life cycle. The design should be insensitive to its environmental, organizational, and human factors in the stage of customer's utilization. This paper presents LCC as a controllable variable and also suggests a new control model for LCC analysis. The estimation of maintenance cost based upon maintenance scenario, design of maintainability followed by minimizing maintainability loss function in the beginning stage of design, and increase of useful life of systems are among the factors to control LCC.

  • PDF

이중선체 벌크화물선의 선체구조설계 및 경제성 검토 (Structural Design and Cost Evaluation of Double Hull Bulk Carrier)

  • 송하철;염재선;김병일
    • 동력기계공학회지
    • /
    • 제9권2호
    • /
    • pp.106-111
    • /
    • 2005
  • After many casualties of conventional bulk carriers in recent years, a double hull bulk carrier was proposed to enhance the structural safety of a side shell and a transverse bulkhead. In this paper, two alternative structural designs of a double hull bulk carrier were carried out based on the Lloyd's rule. One has the double sided hull with longitudinal stiffeners and the other has that with a girder. The final structural design was examined in comparison with an existing single hull bulk carrier from the viewpoints of cargo hold capacity and the increases of weight and construction cost. Generally, the construction cost of a ship consists of the costs of material, labor and overhead cost. But, in this study, the relative construction cost concept was introduced to compare the economical validity more precisely. In this concept, fixed overhead cost is excluded in the assessment of construction cost, and only the variable overhead cost is added up to labor cost. As the result of this study, a double hull bulk carrier can be constructed within 1% increase of weight and construction cost.

  • PDF

Optimal design for the reinforced concrete circular isolated footings

  • Lopez-Chavarria, Sandra;Luevanos-Rojas, Arnulfo;Medina-Elizondo, Manuel;Sandoval-Rivas, Ricardo;Velazquez-Santillan, Francisco
    • Advances in Computational Design
    • /
    • 제4권3호
    • /
    • pp.273-294
    • /
    • 2019
  • In this paper is presented the minimum cost (optimal design) for reinforced concrete circular isolated footings based on an analytic model. This model considers a load and two moments in directions of the X and Y axes, and the pressure has a variation linear, these are the effects that act on the footing. The minimum cost (optimal design) and the Maple program are shown in Flowcharts. Two numerical experiments are shown to obtain the minimum cost design of the two materials that are used for a circular footing supporting an axial load and moments in two directions in accordance to the code of the ACI (American Concrete Institute), and it is compared against the current design (uniform pressure). Also, the same examples are developed through the normal procedure to verify the minimum cost (optimal design) presented in this document, i.e., the equations of moment, bending shear and punching shear are used to check the thickness, and after, the steel areas of the footing are obtained, and it is compared against the current design (uniform pressure). Results section show that the optimal design is more accurate and more economical than to any other model. Therefore, it is concluded that the optimized design model presented in this paper should be used to obtain the minimum cost design for the circular isolated footings.

Ethnographic Research를 이용한 IT Cost 모델 분석 및 설계 (A Study on the Analysis and Design of IT Cost Model Using an Ethnographic Research)

  • 이재범;정승렬;이학선
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제15권3호
    • /
    • pp.107-129
    • /
    • 2006
  • The purpose of this study is to provide and validate an IT cost model hi which we link among cost center, cost object and flexible cost driver. in order to accomplish this purpose, this study utilizes ethnographic research methodology. At first we develop the cost model where the flexible cost driver is the distribution basis of overhead cost. For each cost driver, unit cost management model is also proposed. Then we employ the structured design methodology to validate the model. Based on the IT Cost requirements of a case company, the IT cost system was designed and developed for its test. The result shows the model we developed in this study is appropriate for managing IT resources and further, can be used as a reference model for calculating chargeback rates of other departments and IT budget of IT department.

  • PDF

사업 수행 단계별 강박스거더교 공사비 산정 모델 제시 및 검증 (Suggestion and Verification of Assessment model on Construction Cost of Steel Box Girder Bridge in Project Performance Phases)

  • 전은경;경갑수;박진은;강신화
    • 한국강구조학회 논문집
    • /
    • 제22권1호
    • /
    • pp.55-65
    • /
    • 2010
  • 공공 건설공사에서 공사 단계별 합리적인 공사비를 산정하는 것은 국가 예산의 효율적 확보 및 집행 등에 있어 매우 중요한 요소이다. 일반적으로 공사예정가격은 대상 구조물의 설계 종료시점에서 산출된다. 그러므로 대상 구조물의 구체적인 상세 단면이 주어지지 않은 기획단계 및 설계초기단계에서 교량 구조물에 대한 단순 정보만을 가지고 개략공사비를 추정하는 것은 상당히 어려운 문제일 것으로 생각된다. 본 연구에서는 선행연구에서의 61개의 강박스거더교 공사비 분석에 의해 효율적이고 적절한 기획단계 및 설계초기단계의의 개략공사비 산정 모델의 제시 및 타당성을 검증하고자 한다. 연구결과, 본 연구에서 제시된 공사비 산정 모델에 의해 얻어진 추정공사비는 기존에 사용된 방법과 비교할 때 매우 높은 신뢰도를 갖는 것을 알 수 있었다.

강교의 생애주기비용 최적설계 (Optimum Life-Cycle Cost Design of Steel Bridges)

  • 조효남;이광민;김정호;최영민;봉연종
    • 한국강구조학회 논문집
    • /
    • 제15권4호통권65호
    • /
    • pp.341-358
    • /
    • 2003
  • 본 논문에서는 강교의 실용적인 생애주기비용 (LCC) 최적설계를 위한 일반화된 정식화와 LCC 설계시스템 모델을 제안하였다. 강교 최적설계를 위한 LCC는 초기비용, 직접 복구 (rehabilitation) 비용과 인적 혹은 물적 손실비용의 직접비용, 도로이용자비용, 그리고 사회-경제 손실비용을 포함한 간접비용의 현재가치의 합으로 정식화하였다. 특히 본 논문에서는 교량이 속해 있는 도로의 네트워크를 고려한 도로이용자비용과 사회-경제 손실비용 산정을 위한 새로운 모델을 제안하였다. 본 연구에서 제안된 LCC 정식화 모델은 실제 강박스 거더교와 강상판형교의 LCC 최적설계 문제에 적용하였고, 다양한 경우에 대한 LCC의 효율성에 대해 비교 고찰하였다. LCC를 고려한 강교량의 최적설계는 설계시방서에 기초한 설계방법뿐만 아니라 초기비용 절감을 위한 최적설계 방법과 비교할 때 더욱 합리적이고, 경제적이며, 안전한 설계를 유도할 수 있으리라 판단된다.

엑셀과 적산프로그램의 가용성 비교를 통한 설계변경 업무의 효율성 방안 (Efficiency of Design Changes by Comparing the Availability of Excel and the Cost-of-construction Program)

  • 류보현;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.325-326
    • /
    • 2021
  • Design changes are inevitable areas of work for construction engineers as they occur frequently in the construction site, and are becoming a technical measure of the technical person to the design change. In this study, the purpose is to analyze by comparing the availability of excel and the enscised program during design changes through the case, and to present the efficiency of the the Cost-of-construction Program.

  • PDF

최적화 기법을 이용한 광역상수도 관로시스템 설계 (Design of Multi-Regional Water Supply System Based on the Optimization Technique)

  • 김주환;김종우;박재홍
    • 상하수도학회지
    • /
    • 제13권1호
    • /
    • pp.95-112
    • /
    • 1999
  • In this research, it is proposed that optimization method is introduced and applied to the design of pipeline system in multi-regional water supply project, which has been constructed to settle the regional unbalance problems of available water resources. For the purpose, interface programs are developed to integrate linear programming model and KYPIPE model which is used for optimization and hydraulic analysis, respectively. The developed program is applied to the pipeline system design of multi-regional water supply project. The optimal diameters from the application of linear programming technique are compared with those from conventional method that is time-consuming and tedious trail and error process. Since the conventional design largely depends upon the experience of designers and the results of general hydraulic analysis, it can not be reasonable and consistent. The application of linear programming technique can make it possible to design pipeline system optimally by using same design factors of general hydraulic models. The model can select commercial discrete pipe diameter as optimal size by using pipe length as decision variables. The developed model is applied to Pohang multi-regional water supply system design with two different objective functions, which are initial construction cost and annual cost including electric cost. As results, it is calculated that the initial construction cost of 1,449,740 thousand won is saved and annual cost of 128,951 thousand won is saved for a year within study year. Also, the optimal site of pump station is selected on 5th pipe, which is located between the diverging junction to Kangdong(2) province and the diverging junction to Cheonbuk province. It is explained that pump cost is less than pipe cost in this application case study due to little pump station scale. In the case of water supply with large pump capacity, it is reasonal that the increase of pipe size is more efficient instead the increase of pump station capacity to save annual cost.

  • PDF