• 제목/요약/키워드: Design Cost

검색결과 8,469건 처리시간 0.038초

사례분석을 통한 설계대가 기준 개선 방향 마련 기초연구 (Fundamental Rearch to Prepare a Direction to Improve the Design Fee Standard through Case Analysis)

  • 한재구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 가을 학술논문 발표대회
    • /
    • pp.179-180
    • /
    • 2020
  • In the budgeting guidelines, there are rules for calculating design fee and direct costs. However, only the design fee is calculated excluding the direct cost, which causes the cost to be insufficient. Therefore, this study is designed to analyze representative cases where direct costs are insufficient, draw out problems, and propose a way to improve design fees.

  • PDF

Multi-objective Optimum Structural Design of Marine Structure Considering the Productivity

  • Lee, Joo-Sung;Han, Jeong-Hoon
    • 한국해양공학회지
    • /
    • 제23권3호
    • /
    • pp.1-5
    • /
    • 2009
  • It is necessary to develop an efficient optimization technique to optimize engineering structures that have given design spaces, discrete design values, and several design goals. In this study, an optimum algorithm based on the genetic algorithm was applied to the multi-object problem to obtain an optimum solution that simultaneously minimizes the structural weight and construction cost of panel blocks in ship structures. The cost model was used in this study, which includes the cost of adjusting the weld-induced deformation and applying the deformation control methods, in addition to the cost of the material and the welding cost usually included in the normal cost model. By using the proposed cost model, more realistic optimum design results can be expected.

비용함수를 이용한 VVVF 전동차 제동장치의 시스템 구조 및 신뢰도 최적화 (System Structure and Reliability Optimization of VVVF Urban Transit Brake System Through Cost Function Construction)

  • 김세훈;김현준;배철호;이정환;이호용;서명원
    • 한국자동차공학회논문집
    • /
    • 제15권3호
    • /
    • pp.63-71
    • /
    • 2007
  • During the design phase of a product, reliability and design engineers are called upon to evaluate the reliability of the system, The question of how to meet target reliability for the system arises when estimated reliability or cost is inadequate. This then becomes a problem of reliability allocation and system structure design. This study proposes the optimization methodology to achieve target reliability with minimum cost through construction of the cost function of system. In cost function, total cost means the sum of initial cost, repair cost and maintenance cost. This study constructs optimization problem about system structure design and reliability allocation using cost function. This problem constructed is solved by Multi-island Genetic Algorithm(MIGA), and applies to urban transit brake system. Current brake system of the urban transit is series system. Series system is the simplest and perhaps one of the most common system, but it demands high reliability and maintenance cost because all components must be operating to ensure system operation. Thus this study makes a comparative study by applying k-out-of-n system to brake system. This methodology presented can be a great tool for aiding reliability and design engineers in their decision-makings.

Minimum life-cycle cost design of ice-resistant offshore platforms

  • Li, Gang;Zhang, Da-Yong;Yue, Qian-Jin
    • Structural Engineering and Mechanics
    • /
    • 제31권1호
    • /
    • pp.11-24
    • /
    • 2009
  • In China, the oil and natural gas resources of Bohai Bay are mainly marginal oil fields. It is necessary to build both ice-resistant and economical offshore platforms. However, risk is involved in the design, construction, utilization, maintenance of offshore platforms as uncertain events may occur within the life-cycle of a platform under the extreme ice load. In this study, the optimum design model of the expected life-cycle cost for ice-resistant platforms based on cost-effectiveness criterion is proposed. Multiple performance demands of the structure, facilities and crew members, associated with the failure assessment criteria and evaluation functions of costs of construction, consequences of structural failure modes including damage, revenue loss, death and injury as well as discounting cost over time are considered. An efficient approximate method of the global reliability analysis for the offshore platforms is provided, which converts the implicit nonlinear performance function in the conventional reliability analysis to linear explicit one. The proposed life-cycle optimum design formula are applied to a typical ice-resistant platform in Bohai Bay, and the results demonstrate that the life-cycle cost-effective optimum design model is more rational compared to the conventional design.

An Optimal Design of Paddy Irrigation Water Distribution System

  • Ahn, Tae-Jin;Park, Jung-Eung
    • Korean Journal of Hydrosciences
    • /
    • 제6권
    • /
    • pp.107-118
    • /
    • 1995
  • The water distribution system problem consists of finding a minimum cost system design subject to hydraulic and operation constraints. The design of new branchin network in a paddy irrigation system is presented here. The program based on the linear programming formulation is aimed at finding the optimal economical combination of two main factors : the capital cost of pipe network and the energy cost. Two loading conditions and booster pumps for design of pipe network are considered to obtain the least cost design.

  • PDF

DATA MININING APPROACH TO PARAMETRIC COST ESTIMATE IN EARLY DESIGN STAGE AND ANALYTICAL CHARACTERIZATION ON OLAP (ON-LINE ANALYTICAL PROCESSING)

  • JaeHo Cho;HyunKyun Jung;JaeYoul Chun
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.176-181
    • /
    • 2011
  • A role of cost modeler is that of facilitating design process by the systematic application of cost factors so as to maintain sensible and economic relationships between cost, quantity, utility and appearance. These relationships help to achieve the client's requirements within an agreed budget. The purpose of this study is to develop a parametric cost estimating model for the early design stage by using the multi-dimensional system of OLAP (On-line Analytical Processing) based on the case of quantity data related to architectural design features. The parametric cost estimating models have been adopted to support decision making in the early design stage. These models typically use a similar instance or a pattern of historical case. In order to effectively use this type of data model, it is required to set data classification and prediction methods. One of the methods is to find the similar class in line with attribute selection measure in the multi-dimensional data model. Therefore, this research is to analyze the relevance attribute influenced by architectural design features with the subject of case-based quantity data used for the parametric cost estimating model. The relevance attributes can be analyzed by Analytical Characterization. It helps determine what attributes to be included in the OLAP multi-dimension.

  • PDF

강상자형교의 생애주기비용 최적설계 (Life-Cycle Cost Optimization of Steel Box Girder Bridges)

  • 조효남;민대홍;권우성
    • 한국전산구조공학회논문집
    • /
    • 제15권4호
    • /
    • pp.557-566
    • /
    • 2002
  • 본 논문에서는 강상자형교의 바닥판과 주형에 대한 생애주기비용(Life-Cycle Cost : LCC)를 고려한 최적설계 방법을 제안하였다. 생애주기비용의 최적설계 문제는 초기비용, 유지관리비용 그리고 강도와 처짐 그리고 균열에 대한 파손 기대비용의 최소화 문제로 정식화할 수 있다. 기존의 재래적인 설계방법과의 비교를 동해서 강상자형교의 생애주기비용 최적설계의 우수성을 입증하였다. 또한 수치적인 결과의 고찰을 통하여 LCC에 근거한 최적설계가 여타의 설계방법들보다 좀 더 합리적이고 경제적이며 안전한 설계를 유도하는 것으로 분석되었다.

설계단계에서 적정 기계설비 공사비 산정을 위한 BIM 정보표현수준(BIL) 개선안 (A Proposal of BIL for Reasonable Cost Estimation of Mechanical Contracts and Construction in Design Phases)

  • 박보성;김선혜
    • 설비공학논문집
    • /
    • 제29권12호
    • /
    • pp.663-672
    • /
    • 2017
  • Building information modeling (BIM) technology based on 3D modeling has been applied to the entire domestic construction industry since 2010. It can calculate quantity take-off considering construction productivity at design phase. Based on this, it is possible to improve the reliability of construction cost prediction of design phase in the process of cost estimation. However, Building Information Level (BIL) defined by Ministry of Land, Infrastructure and Transport and Public Procurement Service does not seem to offer doable environment due to the lack of detailed application items. By calculating construction cost that meets Construction Cost Estimate Accuracy by American Association of Cost Engineers (AACE) through quantity take-off and cost estimation based on 3D modeling of BIM technology, a BIL improvement proposal at design phase for Mechanical Contracts and Construction is provided here. Results showed that properties including outline and minimum specification of the main equipment, internal main piping, and internal main duct should be defined from the intermediate design phase to have reliable cost estimation.

Developing an Integrated Evaluation Technology for Energy- and Cost-Efficient Building Design Based on BIM in the Real-time Manner

  • Park, Jae Wan;Lee, Yun Gil
    • Architectural research
    • /
    • 제16권3호
    • /
    • pp.93-100
    • /
    • 2014
  • Existing BIM(Building Information Modeling) based energy evaluation tools cannot be utilized enough for the potential performance of BIM because most of them have not provided the integrated model for energy evaluation, assessment of the material, cost of the construction, and so on. This research aims to propose and develop a new application, EcoBIM, to support an integrated evaluation of the energy and cost efficiencies of the design alternatives within the design process. The proposed application functions as a BIM-based evaluation system that calculates energy-savings performance as well as the construction cost of the alternatives at the design stage. This study mainly focuses on the possibilities of developing the proposed technology. We also suggest an advanced design process using the proposed system, corresponding to changes of national regulations in Korea. This study deduce that EcoBIM can allow architects to make suitable decisions regarding energy- and cost-efficient designs. The proposed design process will allow architects not only to check the eco-friendly performance of design alternatives but also predict the operation cost in a certain period in the future. EcoBIM can prevent large-scale design changes required to obtain environmental certification and enable the owner to make an informed decision about the initial investment of construction according to the result of the analysis of the energy requirement at the design stage.

공공아파트 계획설계단계에서의 공사비 예측모델 (Cost prediction model of Public Multi-housing Projects in Schematic Design Phase)

  • 권호석;문현석;이성균;홍태훈;구교진;현창택
    • 한국건설관리학회논문집
    • /
    • 제9권3호
    • /
    • pp.65-74
    • /
    • 2008
  • 국내 건설산업의 공공 발주자는 사업의 초기단계의 사업비관리에 대한 중요성을 충분히 인식하고 있음에도 불구하고 체계화된 공사비 산정시스템을 보유하고 있지 못한 실정이다. 이에 신규 공공 건설공사를 기획하고 사업비를 책정하는 단계에서는 예산을 수립하는 담당자가 기존의 실적데이터와 경험을 바탕으로 공사비를 추정하고 있으며, 기본설계단계와 실시설계단계 이후 산정된 공사비를 책정된 예산과 비교 후 사업의 추진여부를 검토하거나 설계내용을 예산에 맞도록 변경하고 있다. 이에 본 연구에서는 공공아파트의 사업초기단계에서 공사비를 산정할 수 있는 공공아파트 계획설계단계에서의 공사비 예측모델을 개발하고자 하였다. 본 연구의 결과를 바탕으로 계획설계단계에서 공사비를 예측하고 사업비 및 전반적인 설계를 관리한다면 지금보다 더 효율적인 방법으로 국가의 재원을 적절하게 책정하고 집행할 수 있을 것으로 판단된다.