This paper presents an hour-ahead System Marginal Price (SMP) forecasting framework based on a neural network. Recently, the deregulation in power industries has impacted on the power system operational problems. The bidding strategy of market participants in energy market is highly dependent on the short-term price levels. Therefore, short-term SMP forecasting is a very important issue to market participants to maximize their profits. and to market operator who may wish to operate the electricity market in a stable sense. The proposed hybrid neural network is composed of tow parts. First part of this scheme is pattern classification to input data using Kohonen Self-Organizing Map (SOM) and the second part is SMP forecasting using back-propagation neural network that has three layers. This paper compares the forecasting results using classified input data and unclassified input data. The proposed technique is trained, validated and tested with historical date of Korea Power Exchange (KPX) in 2002.
The purpose of this study is to clarify multi-habitation, a new phenomenon in which inhabitants in urban areas reside in primarily condominiums on weekdays and retreat to dwellings in rural areas on weekends, and to examine the various life styles related to multi-habitation. Through the interviews and site surveys, three major subtypes of multi-habitation were identified to support the theoretical framework: interchange style, sedentary style, and special style. Findings include that first, in order to discuss multi-habitation, the terms primary home and secondary home are introduced. Based on the concept of primary home and secondary home, a variety of multi-habitation can be described using spatial locations in urban and rural areas. Second, systematic deregulation for the second home ownership should be made to promote citizens' interchange. Also urban residents should make more efforts to integrate into rural communities. Third, for some remote areas such as Cheju Island, it is observed that multi-habitation is limited by cost, time, and lifestyle.
The main task of landscape architecture is to create a higher quality of the environment by utilizing resources or to provide effective stewardship for the preserved environment. These outcomes enhance the correlation between humans and the environment. Landscape architect deals with direct use of market economic goods in private property resources such as capital, land, plant, structure. But it also has indirect use of non-market economic goods in public resources like scenic view from the forest, sea, urbanscape, and refreshing atmosphere. At this point, landscaping products should have a role of public goods, and even these attribute to individuals or certain group. From the results of neo-liberalism regime in modern era such as guarantee of private property, deregulation for free market, and reduction of social welfare, minority has getting less opportunity to enjoy the quality life in ecotop and social welfare. With all future, landscape architecture should have the role of social infrastructure through planning concept that ensures public interests first. The virtuous functions of Green Infrastructure is a proper tool in realizing environmental justice in that it efficiently protects environment, and distributes fair benefits to all people.
Recently, the operation of power systems has become more difficult because the peak demand load is increasing continuously and the daily load factor is getting worse and worse. Also, the consideration of deregulation and global environment in electric power industry is required. In order to overcome those problems, a study on the planning and operation in power systems of dispersed generating sources such as fuel cell systems, photovoltaic systems and wind power systems, has been performed energetically. This paper presents a method for determining an optimal operation strategy of dispersed co-generating sources, especially fuel cell generation systems, considering thermal supply as well as electric power supply. In other words, the optimal operation of those sources can be determined easily by the principle of equal incremental fuel cost and the thermal merit of those sources can be also evaluated quantitatively through Kuhn-Tucker's optimal conditions. In additions, an priority method using the comparison of total cost at the peak load time interval is presented in order ot select the optimal locations of those sources. The validity of the proposed algorithms is demonstrated using a model system.
Deregulation and restructuring of electric industry change the fundamental nature of electric business which will be coordinated by the evolved market structures such as spot market with pool and bilateral transaction structure, forward market and future market. Introduction of competition can significantly change the system operation in near-terms as well as long-run generation expansion planning Previous centralized planning by monopoly utilities which was guided for the public service purpose will be replaced by decentralized investments plan by individual generation companies in response to commercial incentives. This paper reviews WASP model as a centralized planning tool and presents a methodological analysis of generation expansion planning in deregulated power systems. It stresses how affects the process of planning new generation investments by the introduction of competition and how maintains proper fuel mix and continuously sustains system reliability under deregulated environments.
With regard to the new town developments which have supplied lots of houses in a short period of time in Korea this study aims to evaluation and finding out problems of the developments finally to suggest the direction. A new town's competitiveness model set in the previous paper takes a role of research frame to recognize the problems and to show the direction. The model explains that new town's competitiveness is composed of 4 factors; Self-sufficiency, Innovativenss, Identity and Sustainability. Problems of the developments are as follows; incongruity of spatial structure especially in the capital region, deficiency of self-sufficiency resulted from single-use development, restriction on mixed development by a number of regulations in capital region, low business value, grand scale of land compensation, house oriented planning guidance, unfair share of infrastructure fee, and physical structure depending mainly on fossil energy. Based on this recognition this study conclusively suggests corresponding direction such as role performance as a means of urban growth management, promotion of quality of life by accumulating social capital, introduction of socially sustainable management program for the new towns, discovery and creation of town's value, reexamination of self-sufficiency's meaning or target, selective deregulation of metropolitan development, institutional strategy for cost reduction, changeover from house index to urban function oriented index, and pursuit of low-carbon green town.
Keratinocyte overgrowth after UVB exposure is believed to contribute to skin photoageing and cancer development. However, little is known about the transcription factors that epigenetically regulate keratinocyte response to UVB. Recently, $HIF-1{\alpha}$ was found to play a role in epidermal homeostasis by controlling the keratinocyte cell cycle, and thus, we hypothesized that $HIF-1{\alpha}$ is involved in UVB-induced keratinocyte growth. In cultured keratinocytes, $HIF-1{\alpha}$ was found to be down-regulated shortly after UVB exposure and to be involved in UVB-induced proliferation. In mice repeatedly treated with UVB, the epidermis became hyperplasic and keratinocytes lacked $HIF-1{\alpha}$ in nuclei. Based on these results, we suggest that the deregulation of $HIF-1{\alpha}$ is associated with UVB-induced hyperplasia of the epidermis. This work provides insight of the molecular mechanism underlying UV-induced photoageing and skin cancer development.
신규 발전소 부지 및 송전선 경과지 확보의 어려움 때문에 신규 발전기들은 기존의 발전단지에 건설되고 송전망은 더 복잡한 망의 형태로 구성되고 있다. 이러한 구조적인 특징은 전력계통의 운용의 신뢰성에 제약을 발생시킨다. 이러한 문제를 해결하기 위해서 전력계통의 해석의 고도화와 적절한 대책이 요구된다. 또한 현재 진행중인 전력산업의 구조 개편 이후, 신뢰성과 경제성을 동시에 추구하여야하는 경쟁적 전력시장에서의 계통해석 결과에 따른 비용 발생시에 책임소재의 투명성과 해석결과에 대한 검증이 필요하게 되어 계통해석 기술의 고도_화와 이를 구현하기 위한 해석 프로그램의 다변화가 절실하게 요구된다. 본 논문에서는 대규모 전력계통 해석 프로그램인 EUROSTAG의 발전기 제어계 계통 의 모델을 개발하였고, 성능을 입증하기 위해서 현재 전력회사에서 사용되는 PSS/E와 시뮬레이션 결과를 비교하였다.
This study examined the regulation status on wastewater treatment in agro-food processing and a case study on effluent treatment m ethods was carried out to evaluate any change after the mitigation of regulation. First, in order to clarify the area of investigation, the definition of small-scale agro-processing facilities was reviewed through literature survey and local government ordinance. The current law were separately analyzed into four areas; effluent treatment facilities, development of agro-processing industries, land use and food processes equipment. The exclusion clauses on wastewater discharging facility in the enforcement regulation were defined in detail, which can be served in practice. Site survey, after the questionnaire survey of the person in charge of the local unit, was carried out. As the result, this survey confirmed the positive effects of the deregulation on promoting sewer system service in rural areas, introducing the new processing construction and so on. In addition, it was found that some matters to be considered to determine whether to introduce wastewater treatment plan for public food processing facilities.
As the power demand has increased and power industry deregulation has progressed, the transmission and distribution system will have more complicated problems by the influence of investment reduction and NIMBY phenomena for overall power system. It is expected that the route length per MW demand will reduce gradually from 0.6[C-km/MW] to 0.53 [C-km/MW] in 2010. This comes up to a real serious problem of system planning and operational viewpoints. HTS technologies related to power system have properties to solve these complex transmission and distribution constraints, especially for metropolitan area, in the future. As the HTS technology has developed, the HTS cable technology can be the most effective alternative to solve the future expected power network constraints. This paper describes the application methodology of developing 22.9㎸ HTS cable by CAST for practical distribution system. 22.9㎸ HTS cable under development with step-by-step application methodology can substitute the existing and planning conventional 154㎸ cable. If this scheme is applied, part of downtown 154㎸ substation of metropolitan city such as Seoul can be changed into 22.9㎸ switching station. It can give great economic, environmental and additional benefits to all of the concerned authorities.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.