• Title/Summary/Keyword: Delivery estimation

Search Result 138, Processing Time 0.024 seconds

Enhanced Inter-Symbol Interference Cancellation Scheme for Diffusion Based Molecular Communication using Maximum Likelihood Estimation

  • Raut, Prachi;Sarwade, Nisha
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.10 no.10
    • /
    • pp.5035-5048
    • /
    • 2016
  • Nano scale networks are futuristic networks deemed as enablers for the Internet of Nano Things, Body area nano networks, target tracking, anomaly/ abnormality detection at molecular level and neuronal therapy / drug delivery applications. Molecular communication is considered the most compatible communication technology for nano devices. However, connectivity in such networks is very low due to inter-symbol interference (ISI). Few research papers have addressed the issue of ISI mitigation in molecular communication. However, many of these methods are not adaptive to dynamic environmental conditions. This paper presents an enhancement over original Memory-1 ISI cancellation scheme using maximum likelihood estimation of a channel parameter (λ) to make it adaptable to variable channel conditions. Results of the Monte Carlo simulation show that, the connectivity (Pconn) improves by 28% for given simulation parameters and environmental conditions by using enhanced Memory-1 cancellation method. Moreover, this ISI mitigation method allows reduction in symbol time (Ts) up to 50 seconds i.e. an improvement of 75% is achieved.

Analysis of Sediment Yields at Watershed Scale using Area/Slope-Based Sediment Delivery Ratio in SATEEC (SATEEC 시스템을 이용한 면적/경사도에 의한 유달률 산정 방법에 따른 유사량 분석)

  • Park, Younshik;Kim, Jonggun;Kim, Narnwon;Kim, Ki-sung;Choi, Joongdae;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.5
    • /
    • pp.650-658
    • /
    • 2007
  • The Universal Soil Loss Equation (USLE) has been used in over 100 countries to estimate potential long-term soil erosion from the field. However, the USLE estimated soil erosion cannot be used to estimate the sediment delivered to the stream networks. For an effective erosion control, it is necessary to compute sediment delivery ratio (SDR) for watershed and sediment yield at watershed outlet. Thus, the Sediment Assessment Tool for Effective Erosion Control (SATEEC) was developed to compute the sediment yield at any point in watershed. In this study, the SATEEC was applied to the Sudong watershed, Chuncheon Gangwon to compare the sediment yield using area-based sediment delivery ratio (SDRA) and slope-based sediment delivery ratio (SDRS) at watershed outlet. The sediment yield using the SDRA by Vanoni, SYA and the sediment yield using the SDRS by Willams and Berndt, SYS were compared for the same sized watersheds. The 19 subwatersheds was 2.19 ha in size, the soil loss and sediment yield were estimated for each subwatershed. Average slope of main stream was about 0.86~3.17%. Soil loss and sediment yield using SDRA and SDRS were distinguished depending on topography, especially in steep and flat areas. The SDRA for all subwatersheds was 0.762, however the SDRS were estimated in the range of 0.553~0.999. The difference between SYA and SYS was -79.74~27.45%. Thus site specific slope-based SDR is more effective in sediment yield estimation than area-based SDR. However it is recommended that watershed characteristic need to be considered in estimating yield behaviors.

A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River (낙동강수계 수질오염총량관리를 위한 시범소유역 유황별 유달율 산정방법 연구)

  • Shon, Tae-Seok;Park, Jae-Bum;Shin, Hyun-Suk
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.5
    • /
    • pp.792-802
    • /
    • 2009
  • The objective of this study is to construct the watershed management system with link of the non-point sources model and to estimate delivery ratio duration curves for various pollutants. For the total water pollution load management system, non-point source model should be performed with the study of the characteristic about non-point sources and loadings of non-point source and the allotment of pollutant in each area. In this study, daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator and SWAT model. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. As a result, the SWAT simulation results show good agreements in terms of discharge, BOD, TN, TP but for more exact simulation should be kept studying about variables and parameters which are needed for simulation. And as a result of the characteristic discharges, pollutants loading with the runoff and delivery ratios, non-point sources effects were higher than point sources effects in the small-scale test bed of Nakdong river basin.

Evaluation of Flow-Pollutant Load Delivery Ratio Equations on Main Subwatersheds within Juam Lake (농촌유역 유량-유달율 단순회귀식을 이용한 주암호 상류유역의 유달율 추정가능성 평가)

  • Jung, Jae-Woon;Lim, Byung-Jin;Choi, Dong-Ho;Choi, Yu-Jin;Lee, Kyoung-Sook;Kim, Young-Joo;Kim, Kap-Soon;Chang, Nam-Ik;Yoon, Kwang-Sik
    • Journal of Environmental Science International
    • /
    • v.21 no.10
    • /
    • pp.1235-1244
    • /
    • 2012
  • The objective of this study is to evaluate Flow-Pollutant load delivery ratio equations developed from rural watershed on main subwatersheds within Juam Lake. Two regression equations for BOD and three equations for T-P were evaluated on Bosung cheon, Dongbok cheon, Songgwang cheon, Naenam cheon, and Sinpyeon cheon. The results show that estimation of BOD delivery ratio using flow-delivery equation is reliable when relative composition of discharge load of pollutant sources of a watershed is similar to those of watershed where the equation developed. On the other hand, application of regression equation for T-P was feasible when the landuse pattern and relative composition of discharge load of pollutant sources of a watershed is similar to those of watershed where the equation developed.

A Study on Verification of Delivery Ratio Methodology for Basic Plan at TPLMs(Total Pollutant Load Management System) (수질오염총량관리계획 수립을 위한 유달율 적용방안 검증 연구)

  • Lee, Sung Jun;Rhee, Han Pil;Park, Ji Hyung;Kim, Yong Seok;Hwang, Ha Sun
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.12
    • /
    • pp.714-722
    • /
    • 2017
  • The TPLMs is a system to manage the total amount of pollutants discharged from the watershed in order to achieve the target water quality of the river. In this process, the pollutant load can be classified into generation, discharge and delivery load. When using equation 2, the discharge coefficient should be 1. In case of using equation 3, it is considered that the discharge coefficient defined in the Technical Guideline should be applied. The delivery load is calculated as the product of the discharge load and the delivery ratio, and the delivery ratio is defined as the rate at which the pollutant discharged from the watershed reaches a specific point in the stream. In this study, the delivery ratio estimation method proposed by Hwang (2016) was applied to the Yonggang watershed in the Nakdong river. And the input data of QUALKO2 model was generated by using the estimated delivery ratio (equation 3) and the validation study was conducted by comparing with DRave (equation 2). As a result of the study, it is possible to use both the equation 2 and the equation 3, but it is necessary to change the methodology according to the application of the discharge coefficient.

Proxy Design for Improving the Efficiency of Stored MPEG-4 FGS Video Delivery over Wireless Networks

  • Liu, Feng-Jung;Yang, Chu-Sing
    • Journal of Communications and Networks
    • /
    • v.6 no.3
    • /
    • pp.280-286
    • /
    • 2004
  • The widespread use of the Internet and the maturing of digital video technology have led to an increase in various streaming media application. However, new classes of hosts such as mobile devices are gaining popularity, while the transmission became more heterogeneous. Due to the characteristics of mobile networks such as low speed, high error bit rate, etc., the applications over the wireless channel have different needs and limitations from desktop computers. An intermediary between two communicating endpoints to hide the heterogeneous network links is thought as one of the best approaches. In this paper, we adopted the concept of inter-packet gap and the sequence number between continuously received packets as the error discriminator, and designed an adaptive packet sizing mechanism to improve the network efficiency under varying channel conditions. Based on the proposed mechanism, the packetization scheme with error protection is proposed to scalable encoded video delivery. Finally, simulation results reveal that our proposed mechanism can react to the varying BER conditions with better network efficiency and gain the obvious improvement to video quality for stored MPEG-4 FGS video delivery.

Probabilistic GMP Calculation Method based on BIM (BIM기반 확률론적 GMP 산정방안에 관한 연구)

  • Go, Gun-Ho;Jin, Zheng-Xun;Kim, Hyun-Joo;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.122-123
    • /
    • 2018
  • Recently, CM at Risk delivery system(CM@R) that could solve the problems of Design Bid Build delivery(DBB) system has been emerging. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the contractor carries out the construction within the GMP. In CM @ R, the construction company with expertise in construction participates from the design stage to reflects the construction know-how in the design. On the other hand, the modification design frequently occurs due to the change of the construction cost when negotiating the GMP. In addition, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. This study proposes a probabilistic GMP estimation method applying MCS to the BIM - based cost prediction model, in order to extract the accurate quantity information when estimating the GMP and to cope with the change of the construction cost inherent in uncertainty.

  • PDF

A Study on the Parcel Warehouse & Distribution Center Network (소포물류센터 네트워크 구축에 관한 연구)

  • Noh, Seung-J.;Rim, Suk-Chul;Hong, Min-Sun
    • IE interfaces
    • /
    • v.16 no.4
    • /
    • pp.411-420
    • /
    • 2003
  • This paper deals with how Korea Post establishes a nation wide network of the parcel warehouse & distribution centers(PWDC). The state-of-the-art of the parcel service business in Japan and U.S. are introduced for benchmarking purpose. Potential customers of the PWDC and their major goods are identified. Current major customers of the Korea Post were interviewed to figure out the potential demand of the PWDC service. Five-year volume estimation of the Korea Parcel Service(KPS) is presented based on the past 30-month B-C volume of the four major door-to-door delivery service companies in Korea. Yearly construction plan of the PWDCs is proposed; and the networking strategy of PWDC is discussed.

Simulation Analysis of Part Release Algorithm under Dynamic Tool Allocation in SSMS (SSMS에서 동적 공구할당을 고려한 부품투입 알고리즘의 시뮬레이션 분석)

  • 이충수
    • Journal of the Korea Society for Simulation
    • /
    • v.8 no.1
    • /
    • pp.63-76
    • /
    • 1999
  • Recently in manufacturing environment, manufacturing order is characterized by unstable market demand, shorter product life cycle, a variety of product and shorter production lead time. In order to adapt this manufacturing order, flexible manufacturing systems(FMS) in manufacturing technology advances into the direction that machines become further versatile functionally and that tools are controlled by fast tool delivery device. Unlike conventional FMS to mainly focus on part flow, it is important to control tool flow in single-stage multimachine systems(SSMS), consisting of versatile machines and fast tool delivery device. This research is motivated by the thought that exact estimation of tool competition at part release in SSMS enhances the system performance. In this paper, in SSMS under dynamic tool allocation strategy to share tools among machines, we propose real-time part release and tool allocation algorithms which can apply real factory and which can improve system performance.

  • PDF

A Model for Software Maintenance Cost Estimation based on Productivity (생산성 기반의 소프트웨어 유지보수 대가산정 모델)

  • Bae, Joon-Soo
    • IE interfaces
    • /
    • v.17 no.spc
    • /
    • pp.122-130
    • /
    • 2004
  • Since the cost of software maintenance occupies about 50~75% in a general successful organization, the software maintenance plays an important role in software life cycle. In particular, if the managed system needs to be operated in a long term or the system is very large and complex, then the maintenance is especially more important. Software maintenance is defined as software modification activities after customer delivery, such as improvement of performance or functionality, error correction, adaptation to environmental changes, etc. In this paper, software cost estimation models are proposed, that is based on productivity of manpower in maintenance projects. In order to do this, the activities of maintenance are classified into function change, non-function change, user support and application operation. The proposed models are constructed and verified based on the real size and cost information of projects in the real world. The approach in this paper is to discriminate the heterogeneous activities in maintenance projects, and then to calculate the respective cost of each discriminated activity. By using the proposed models, the total cost of maintenance project is summed from the costs of four activities. In addition the number of conflicts between owner and order receiver about the amount of cost will be reduced and the reasonable cost estimation system will be established.