• 제목/요약/키워드: Delivery estimation

검색결과 138건 처리시간 0.026초

주문형 생산에서의 납기 및 원가 예측 연동에 관한 연구 (A Study on the Integrated Estimation of Delivery and Manufacturing Cost for Build-to-Order Manufacturing)

  • 김인준;강무진
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2004년도 추계학술대회 논문집
    • /
    • pp.1456-1461
    • /
    • 2004
  • Companies of Build-to-Order(BTO) strive to achieve customer responsiveness and cost efficiency simultaneously. The success of BTO depends upon the high volume production based on product plat form and delayed differentiation principle on the one hand, and upon the rapid estimation of delivery and cost for the customer orders on the other hand. Expeditious processing of a specific order requires the rearrangement of production resources and the schedule, which results in increased cost. This paper describes a cost estimation method using activity-based costing depending on the schedule change caused by urgent customer orders.

  • PDF

주문형 생산에서의 실시간 납기 산정 (Real-time Delivery Estimation in Build-to-order Manufacturing)

  • 홍태영;강무진;박세형;이상봉
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2002년도 추계학술대회 논문집
    • /
    • pp.101-104
    • /
    • 2002
  • Leading companies have embraced the new economy with new and innovative BTO models. Instead of conventional company-oriented manufacturing scheduling, customer-oriented scheduling method attracts more and more attention. To evaluate the delivery of customer order in advance, the real production capacity as well as procurement lead time should be taken into account. This paper describes a quasi-real-time order delivery estimation system using TOC(Theory of Constraints) based scheduling method.

  • PDF

대청호 상류유역의 기 개발된 유달부하량 산정식의 적용성 평가 (Evaluation of Application to Pre-Developed Delivery Load Equation at Upper Watershed of the Daechung Reservoir)

  • 이준배;김갑순;이규승;윤영삼;임병진;정재운
    • 한국환경농학회지
    • /
    • 제31권1호
    • /
    • pp.16-23
    • /
    • 2012
  • BACKGROUND: To improve the Daechung reservoir water quality, a quantitative estimation of the delivery load from upper watershed need to be conducted prior to others. To do so, an intensive monitoring is necessary because of the complexity and uncertainty of the delivery load from uppper watershed. However, intensive monitoring need to invest much time, cost, and effort. So, many researcher have developed an equation to estimate the delivery loads. But, relatively little research has been conducted on the applicability of pre-developed equation using other sites. Therefore, the objective of this study was to evaluate application of the equation for BOD, T-N and T-P delivery load. METHODS AND RESULTS: To verify the applicability of the equation, the following equation was used; Delivery loads(kg/day)=generated pollutant loads${\times}(1-{\alpha}){\times}$(daily outflow/${\beta})^{\gamma}$. The equations could be calculated the daily delivery loads of streams without any data of water quality, only with the data of daily runoff of study sites. The equations were applied to Youngdogcheon, Chogangcheon, Bocheongcheon, Sookcheon to examine its applicability using monitoring data. The results showed that the estimated delivery loads were in a good agreement with the observed data and indicated reasonable applicability of the equations. CONCLUSION(s): Overall, the equations were satisfactory in estimation of delivery loads at upper watershed of the Daechung reservoir. Therefore, the equations could be contributed to better water quality management in the Daechung reservoir.

프로젝트 인도율 그룹 분할 방법을 이용한 소프트웨어 개발노력 추정 (Software Development Effort Estimation Using Partition of Project Delivery Rate Group)

  • 이상운;노명옥;이부권
    • 정보처리학회논문지D
    • /
    • 제9D권2호
    • /
    • pp.259-266
    • /
    • 2002
  • 소프트웨어 개발시 중요하게 제기되는 문제점으로 소프트웨어 생명주기의 초기단계에서 개발에 투입될 노력과 비용을 추정하는 능력이다. 측정된 소프트웨어 규모인 기능점수 (FP, Function Point)로부터 프로젝트 개발에 소요되는 노력과 비용을 추정하는 회귀모델들이 제안되었다. 그러나 이들 제안된 모델들은 사용한 표본의 크기가 작고, 과거에 개발된 프로젝트를 대상으로 하고 있다. 1990년대에 개발된 789개 소프트웨어 개발 프로젝트들에 투입된 개발노력에 이들 모델을 적용한 결과 결정계수 $R^2$가 0.53 이하로 데이터의 변동을 설명하였다. 본 논문은 프로젝트 인도율(PDR)을 이용하여 동질성을 갖는 그룹으로 분류하여 개발노력을 추정하는 모델을 제안하였다. 제안된 모델은 랜덤한 잔차 분포를 갖고 있고, 대부분의 PDR 범위에서 0.99이상의 결정계수로 데이터의 변동을 설명하였다.

Line Impedance Estimation Based Adaptive Droop Control Method for Parallel Inverters

  • Le, Phuong Minh;Pham, Xuan Hoa Thi;Nguyen, Huy Minh;Hoang, Duc Duy Vo;Nguyen, Tuyen Dinh;Vo, Dieu Ngoc
    • Journal of Power Electronics
    • /
    • 제18권1호
    • /
    • pp.234-250
    • /
    • 2018
  • This paper presents a new load sharing control for use between paralleled three-phase inverters in an islanded microgrid based on the online line impedance estimation by the use of a Kalman filter. In this study, the mismatch of power sharing when the line impedance changes due to temperature, frequency, significant differences in line parameters and the requirements of the Plug-and-Play mode for inverters connected to a microgrid has been solved. In addition, this paper also presents a new droop control method working with the line impedance that is different from the traditional droop algorithm when the line impedance is assumed to be pure resistance or pure inductance. In this paper, the line impedance estimation for parallel inverters uses the minimum square method combined with a Kalman filter. In addition, the secondary control loops are designed to restore the voltage amplitude and frequency of a microgrid by using a combined nominal value SOGI-PLL with a generalized integral block and phase lock loop to monitor the exact voltage magnitude and frequency phase at the PCC. A control model has been simulated in Matlab/Simulink with three voltage source inverters connected in parallel for different ratios of power sharing. The simulation results demonstrate the accuracy of the proposed control method.

추령천 유역의 유황별 유달율 계산 (Pollutant Load Delivery Ratio for Flow Duration at the Chooryeong-cheon Watershed)

  • 김영주;윤광식;손재권;최진규;장남익
    • 한국농공학회논문집
    • /
    • 제52권4호
    • /
    • pp.19-26
    • /
    • 2010
  • To provide the basic information for the water quality management of the Sumjin River Basin, delivery ratios for flow duration were studied. Using the day-interval data set of discharge and water quality observed from the Chooryeong-cheon watershed, the flow-duration and discharge-load relation curves for the watershed were established, then the load-duration curve was constructed. Delivery ratios for flow duration were also developed. Delivery ratios showed wide variation according to flow conditions. In general, delivery ratio of high flow condition showed higher value reflecting nonpoint source pollution contribution from the forest dominating watershed. To resolve this problem, a regression model explaining the relation between flow rate and delivery ratio was suggested. The delivery ratios for different flow regime could be used for pollutant load estimation and TMDL (Total maximum daily load) development.

회귀식을 이용한 황룡A 유역에서의 유황별 유달율 산정 (Estimation of Pollutant Loads Delivery Ratio by Flow Duration Using Regression Equation in Hwangryong A Watershed)

  • 정재운;윤광식;주석훈;최우영;이용운;류덕희;이수웅;장남익
    • 한국농공학회논문집
    • /
    • 제51권6호
    • /
    • pp.25-31
    • /
    • 2009
  • In this study, pollutant loads delivery ratio by flow duration in Hwangryoung A watershed was estimated. The delivery ratio was estimated with measured data by Ministry of Environment(MOE) and the regression equation based on geomorphic parameters. Eight day interval flow data measured by the MOE were converted to daily flow to calculate daily load and flow duration curve by correlating data of neighboring station which has daily flow data. Regression equation developed by previous study was tested to study watershed and found to be satisfactory. The delivery ratios estimated by two methods were compared. For the case of Biochemical oxygen demand(BOD), the delivery ratios of low flow condition were 7.6 and 15.5% by measured and regression equation, respectively. Also, the delivery ratios of Total phosphorus(T-P) for normal flow condition were 13.3 and 6.3% by measured and regression equation, respectively.

수질오염총량관리계획 수립을 위한 유달부하량 추정방법 연구 (A Study on Estimated Pollutant Delivery Load for the Basic Plan of TPLC)

  • 황하선;이한필;안기홍;박지형;김용석;이성준
    • 한국물환경학회지
    • /
    • 제32권4호
    • /
    • pp.375-383
    • /
    • 2016
  • Total Pollution Load Control (TPLC) calculates and manages the allowable pollutant load that is discharged from the watershed, which can meet the water quality target. Delivery Ratio (DR) is generally used for predicting the variation of pollutant mass balance between the pollutants discharged from the watershed and a certain point in the stream, and it is very important for estimation of accurate allowable pollutant load. The concept of DR in TPLC is different from prevalent DR, because DR in TPLC includes both the discharge of pollutants from the watershed and the delivery mechanism. Therefore, DR in TPLC should be estimated by using a proper and unified methodology. The appropriate method and equation for estimation of DR in TPLC was developed through the review of various methodologies, and the applicability of the equation was evaluated in a study area (Geumho A). Determination coefficients (R2) of regression were shown to be relatively high (BOD 0.71~0.87, T-N 0.86~0.90, T-P 0.62~0.69). Applicability of the developed methodology and equations was evaluated as appropriate for TPLC, and it is suggested.

수질모델링을 위한 유달부하량의 수리·수문학적 산정 (Estimation of Pollutant Delivery Load in Hydraulic and Hydrologic Aspects for Water Quality Modeling)

  • 김상단;송미영;김형수
    • 한국습지학회지
    • /
    • 제6권3호
    • /
    • pp.47-54
    • /
    • 2004
  • 본 연구에서는 수리 수문학적인 이론을 근거로 수질모델링을 위한 유달 오염부하량 산정방법을 제안하고자 한다. 본 연구에서 제안하는 방법은 격자기반으로 구성되어 있으며, 최대 경사 방향으로 일어나는 지표면 유출을 추적함으로써 유달부하량을 계산하게 된다. 또한 GIS 및 DEM 자료를 이용함으로써 공간적으로 분포된 배출 오염부하량, 지형, 경사, 토양특성, 토지이용 등을 고려할 수 있다. 이를 통하여 수질에 영향을 미치는 다양한 토지이용방법 및 유역관리방식의 대안에 대한 평가가 가능할 것으로 기대된다.

  • PDF

XRML 기반 비교쇼핑몰의 구조와 배송비 산정에 관한 실증분석 (Architecture of XRML-based Comparison Shopping Mall and Its Performance on Delivery Cost Estimation)

  • 이재규;강주영
    • 한국경영과학회지
    • /
    • 제30권2호
    • /
    • pp.185-199
    • /
    • 2005
  • With the growth of internet shopping malls, there is increasing interest in comparison shopping mall. However most comparison sites compare only book prices by collecting simple XML data and do not provide .the exact comparison Including precise shipping costs. Shipping costs vary depending on each customer's address, the delivery method, and the category of selected goods, so rule based system is required in order to calculate exact shipping costs. Therefore, we designed and implemented comparison shopping mall which compares not only book prices but also shipping costs using rule based inference. By adopting the extensible Rule Markup language (XRML) approach, we proposed the methodology of extracting delivery rules from Web pages of each shopping mall. The XRML approach can facilitate nearly automatic rule extraction from Web pages and consistency maintenance between Web pages and rule base. We developed a ConsiderD system which applies our rule acquisition methodology based on XRML. The objective of the ConsiderD system is to compare the exact total cost of books including the delivery cost over Amazon.com, BarnesandNoble.com, and Powells.com. With this prototype, we conducted an experiment to show the potential of automatic rule acquisition from Web pages and illustrate the effect of delivery cost.