• Title/Summary/Keyword: Delivery Time Estimation

Search Result 39, Processing Time 0.027 seconds

Real-time Delivery Estimation in Build-to-order Manufacturing (주문형 생산에서의 실시간 납기 산정)

  • 홍태영;강무진;박세형;이상봉
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2002.10a
    • /
    • pp.101-104
    • /
    • 2002
  • Leading companies have embraced the new economy with new and innovative BTO models. Instead of conventional company-oriented manufacturing scheduling, customer-oriented scheduling method attracts more and more attention. To evaluate the delivery of customer order in advance, the real production capacity as well as procurement lead time should be taken into account. This paper describes a quasi-real-time order delivery estimation system using TOC(Theory of Constraints) based scheduling method.

  • PDF

A Study on the Integrated Estimation of Delivery and Manufacturing Cost for Build-to-Order Manufacturing (주문형 생산에서의 납기 및 원가 예측 연동에 관한 연구)

  • 김인준;강무진
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.1456-1461
    • /
    • 2004
  • Companies of Build-to-Order(BTO) strive to achieve customer responsiveness and cost efficiency simultaneously. The success of BTO depends upon the high volume production based on product plat form and delayed differentiation principle on the one hand, and upon the rapid estimation of delivery and cost for the customer orders on the other hand. Expeditious processing of a specific order requires the rearrangement of production resources and the schedule, which results in increased cost. This paper describes a cost estimation method using activity-based costing depending on the schedule change caused by urgent customer orders.

  • PDF

Evaluation of Application to Pre-Developed Delivery Load Equation at Upper Watershed of the Daechung Reservoir (대청호 상류유역의 기 개발된 유달부하량 산정식의 적용성 평가)

  • Lee, Jun-Bae;Kim, Kap-Soon;Lee, Kyu-Seung;Yoon, Young-Sam;Lim, Byung-Jin;Jung, Jae-Woon
    • Korean Journal of Environmental Agriculture
    • /
    • v.31 no.1
    • /
    • pp.16-23
    • /
    • 2012
  • BACKGROUND: To improve the Daechung reservoir water quality, a quantitative estimation of the delivery load from upper watershed need to be conducted prior to others. To do so, an intensive monitoring is necessary because of the complexity and uncertainty of the delivery load from uppper watershed. However, intensive monitoring need to invest much time, cost, and effort. So, many researcher have developed an equation to estimate the delivery loads. But, relatively little research has been conducted on the applicability of pre-developed equation using other sites. Therefore, the objective of this study was to evaluate application of the equation for BOD, T-N and T-P delivery load. METHODS AND RESULTS: To verify the applicability of the equation, the following equation was used; Delivery loads(kg/day)=generated pollutant loads${\times}(1-{\alpha}){\times}$(daily outflow/${\beta})^{\gamma}$. The equations could be calculated the daily delivery loads of streams without any data of water quality, only with the data of daily runoff of study sites. The equations were applied to Youngdogcheon, Chogangcheon, Bocheongcheon, Sookcheon to examine its applicability using monitoring data. The results showed that the estimated delivery loads were in a good agreement with the observed data and indicated reasonable applicability of the equations. CONCLUSION(s): Overall, the equations were satisfactory in estimation of delivery loads at upper watershed of the Daechung reservoir. Therefore, the equations could be contributed to better water quality management in the Daechung reservoir.

An Interval Algebra-based Modeling and Routing Method in Bus Delay Tolerant Network

  • Wang, Haiquan;Ma, Weijian;Shi, Hengkun;Xia, Chunhe
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.4
    • /
    • pp.1376-1391
    • /
    • 2015
  • In bus delay-tolerant networks, the route of bus is determinate but its arrival time is indeterminate. However, most conventional approaches predict future contact without considering its uncertainty, which makes a limitation on routing performance. A novel approach is proposed by employing interval algebra to characterize the contact's uncertainty and time-varying nature. The contact is predicted by using the Bayesian estimation to achieve a better routing performance. Simulation results show that this approach achieves a good balance between delivery latency and delivery ratio.

Adaptive Video Streaming over HTTP with Dynamic Resource Estimation

  • Thang, Truong Cong;Le, Hung T.;Nguyen, Hoc X.;Pham, Anh T.;Kang, Jung Won;Ro, Yong Man
    • Journal of Communications and Networks
    • /
    • v.15 no.6
    • /
    • pp.635-644
    • /
    • 2013
  • Adaptive hypertext transfer protocol (HTTP) streaming has become a new trend to support adaptivity in video delivery. An HTTP streaming client needs to estimate exactly resource availability and resource demand. In this paper, we focus on the most important resource which is bandwidth. A new and general formulation for throughput estimation is presented taking into account previous values of instant throughput and round trip time. Besides, we introduce for the first time the use of bitrate estimation in HTTP streaming. The experiments show that our approach can effectively cope with drastic changes in connection throughput and video bitrate.

Congestion Management with Arrival Estimation of Unit Loads in an Automated Material Handling System (운송시간의 예측을 통한 물류정체 통제 모형)

  • Chung, Jae-Woo;Hur, Yeon-Ho
    • Korean Management Science Review
    • /
    • v.29 no.1
    • /
    • pp.131-141
    • /
    • 2012
  • The automated material handling systems today are playing ever more important roles in semiconductor/LCD fabrication facilities. Recently they became more flexible, intelligent, and speedy than in the past. The facilities have been fully automated because the size and weight of the unit loads used in the facilities were being increased beyond the limits that a human operator can handle. This research develops an efficient procedure to streamline the delivery of unit loads by the automated material handling system (AMHS). For this task, the research employs the event scheduling theory that has been successfully used in the both academia and industry. The developed procedure was applied to an actual LCD fabrication facility and improved the performance of an existing material handling system.

An Overview of Time Estimation in the Appraisal of Completeness for Software

  • Kim, Yukyong
    • Journal of Software Assessment and Valuation
    • /
    • v.16 no.1
    • /
    • pp.21-26
    • /
    • 2020
  • The completeness appraisal of software is performed in various forms, such as assessing the completion level in the development process, calculating the defect rate, estimating the development cost, and calculating the redevelopment cost. Along with this, the problem that is often dealt with is estimation of the development time. Even in a dispute over completeness due to delays in software development, issues of calculating an appropriate development time required to develop a delivery software or a development time required for change requests are often included in the appraisal request. In this paper, we introduce the procedure and method for estimating the appropriate project time of software development so that the appraiser can be applied to the appraisal work for determining the completeness. The method is based on the manual for calculating the appropriate project period of software development project.

Truck Weight Estimation using Operational Statistics at 3rd Party Logistics Environment (운영 데이터를 활용한 제3자 물류 환경에서의 배송 트럭 무게 예측)

  • Yu-jin Lee;Kyung Min Choi;Song-eun Kim;Kyungsu Park;Seung Hwan Jung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.45 no.4
    • /
    • pp.127-133
    • /
    • 2022
  • Many manufacturers applying third party logistics (3PLs) have some challenges to increase their logistics efficiency. This study introduces an effort to estimate the weight of the delivery trucks provided by 3PL providers, which allows the manufacturer to package and load products in trailers in advance to reduce delivery time. The accuracy of the weigh estimation is more important due to the total weight regulation. This study uses not only the data from the company but also many general prediction variables such as weather, oil prices and population of destinations. In addition, operational statistics variables are developed to indicate the availabilities of the trucks in a specific weight category for each 3PL provider. The prediction model using XGBoost regressor and permutation feature importance method provides highly acceptable performance with MAPE of 2.785% and shows the effectiveness of the developed operational statistics variables.

Calculation of Pollutant Load for Prediction of Pollutant Loads to Watershed (합리적인 유역단위 오염부하량 산정방법 연구)

  • Jang, Jae-Ho;Yoon, Chun-Gyung;Jung, Kwang-Wook;Kim, Hyung-Chul
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.534-539
    • /
    • 2005
  • The purpose of this study is the introduction of pollutant loads's estimation into Saemangeum watershed area with M.E.'s guidebook for TMDL and GIS tool. To estimate reliable pollutants loads, it is necessary to think about characteristic of removal, discharge and runoff as time series. In this study, it was calculated for generation loads which be came from pollutant source, discharge loads which be reduced in the treatment facilities and delivery loads which be considered the self purification parameter and delivery distance. To assess the delivery distance handily, it was particularly estimated using Arc-GIS. It was met with good results that delivery loads of BOD, T-N and T-P was reflected to seasonal precipitation. Lastly to verify the estimated pollutant loads, HSPF developed by USEPA was applied to it. It was showed a relativity of observed to simulated data for flow, Temperature, DO, BOD, $NO_3^--N$ TN and TP. Consequantly, this delivery loads can make full use of model input data for prediction of pollutant loads.

  • PDF

Simulation Analysis of Part Release Algorithm under Dynamic Tool Allocation in SSMS (SSMS에서 동적 공구할당을 고려한 부품투입 알고리즘의 시뮬레이션 분석)

  • 이충수
    • Journal of the Korea Society for Simulation
    • /
    • v.8 no.1
    • /
    • pp.63-76
    • /
    • 1999
  • Recently in manufacturing environment, manufacturing order is characterized by unstable market demand, shorter product life cycle, a variety of product and shorter production lead time. In order to adapt this manufacturing order, flexible manufacturing systems(FMS) in manufacturing technology advances into the direction that machines become further versatile functionally and that tools are controlled by fast tool delivery device. Unlike conventional FMS to mainly focus on part flow, it is important to control tool flow in single-stage multimachine systems(SSMS), consisting of versatile machines and fast tool delivery device. This research is motivated by the thought that exact estimation of tool competition at part release in SSMS enhances the system performance. In this paper, in SSMS under dynamic tool allocation strategy to share tools among machines, we propose real-time part release and tool allocation algorithms which can apply real factory and which can improve system performance.

  • PDF