• Title/Summary/Keyword: Delay of decision making

Search Result 94, Processing Time 0.022 seconds

Method for Mobile node in Cloud Computing Environments (클라우드 컴퓨팅 환경에서 이동노드 지원을 위한 기법)

  • Kim, Kiyoung;Yeom, Saehun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.19 no.2
    • /
    • pp.67-75
    • /
    • 2014
  • In this paper, we proposed offloading delay method which determines effectively offloading timing by measuring of handoff delay and offloading time at mobile node side in mobile environment. The propose method measures each of handoff delay and offloading time and making decision of proper offloading timing on mobile node side. Therefore, it is possible to support cloud computing without changing previous implemented cloud computing structure for fixed node in a mobile environment. We compare the energy consumption of server and node to analyze efficiency of proposed method by using existing method of energy consumption measurement. Simulation results shows the reducing energy consumption more than previous method and operation time similar to previous method.

Causes of Delay in Tall Building Projects in GCC Countries

  • Sanni-Anibire, Muizz O.;Zin, Rosli Mohamad;Olatunji, Sunday Olusanya
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.50-59
    • /
    • 2020
  • The 21st century is witnessing a rapid growth of tall buildings in urban centers globally to create more urban space for an anticipated urban population. Tall buildings, however suffer from incessant delays and sometimes total abandonment. Consequently, this study investigated and ranked the causes of delay in tall building projects, while focusing on the Gulf Cooperation Council (GCC) countries. Initially, 36 common delay causes investigated globally were categorized into 9 groups, and then further ranked utilizing the Relative Importance Index (RII) through a questionnaire survey. Tall building professionals in the GCC countries (Saudi Arabia, United Arab Emirates, Bahrain, Kuwait, Oman and Qatar) were contacted. The respondents' categories include Consultants, Contractors, and Clients' Representatives/Facility Managers. The results reveal that the top three causes include "client's cash flow problems/delays in contractor's payment", "contractor's financial difficulties", and "poor site organization and coordination between various parties". The findings from this study could help construction professionals develop guidelines and controls for delay mitigation, as well as support them in risk-based decision making in the planning of tall building projects.

  • PDF

A Study on Improving the Production and Shipment Using MES System (MES 시스템을 이용한 생산 및 출하 신뢰성 향상에 관한 연구)

  • Cho, Joong-Hyun;Bae, Byeong-Gon;Yang, Kwang-Mo;You, Choong-Yeol;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.2
    • /
    • pp.113-122
    • /
    • 2007
  • Recently, the strategy of the age of limitless competition for existence of manufacturing company appears for the enhancement of productivity through the automatic system, the reduction for the cost for standardization and the decision making process for the information system. Especially the critical success factors in manufacturing company can be summarized for the establishment of production visibility through the production management, material & work-in-process management, the establish of the flexible manufacturing system for the changed order priority and the establish of the quality system for improvement of product and process quality. The existing production management systems supply only simple information about production results on real time, can delay quick decision making. And it can prevent acquiring the information about various customer needs and the communication problems with other systems. In this paper, it will show MES system, a solution for the problems of existing production management systems. And through a case study of D company, it will reveal improvement effect on shipment error using MES system and economic analysis for MES itself.

Unethical Network Attack Detection and Prevention using Fuzzy based Decision System in Mobile Ad-hoc Networks

  • Thanuja, R.;Umamakeswari, A.
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.5
    • /
    • pp.2086-2098
    • /
    • 2018
  • Security plays a vital role and is the key challenge in Mobile Ad-hoc Networks (MANET). Infrastructure-less nature of MANET makes it arduous to envisage the genre of topology. Due to its inexhaustible access, information disseminated by roaming nodes to other nodes is susceptible to many hazardous attacks. Intrusion Detection and Prevention System (IDPS) is undoubtedly a defense structure to address threats in MANET. Many IDPS methods have been developed to ascertain the exceptional behavior in these networks. Key issue in such IDPS is lack of fast self-organized learning engine that facilitates comprehensive situation awareness for optimum decision making. Proposed "Intelligent Behavioral Hybridized Intrusion Detection and Prevention System (IBH_IDPS)" is built with computational intelligence to detect complex multistage attacks making the system robust and reliable. The System comprises of an Intelligent Client Agent and a Smart Server empowered with fuzzy inference rule-based service engine to ensure confidentiality and integrity of network. Distributed Intelligent Client Agents incorporated with centralized Smart Server makes it capable of analyzing and categorizing unethical incidents appropriately through unsupervised learning mechanism. Experimental analysis proves the proposed model is highly attack resistant, reliable and secure on devices and shows promising gains with assured delivery ratio, low end-to-end delay compared to existing approach.

Efficient Technology Mapping of FPGA Circuits Using Fuzzy Logic Technique (퍼지이론을 이용한 FPGA회로의 효율적인 테크놀로지 매핑)

  • Lee, Jun-Yong;Park, Do-Soon
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.8
    • /
    • pp.2528-2535
    • /
    • 2000
  • Technology mapping is a part of VLSI CAD system, where circuits in logical level are mapped into circuits in physical level. The performance of technology mapping system is evaluatecJ by the delay and area of the resulting circuits. In the sequential circuits, the delay of the circuit is decided by the maximal delay between registers. In this work, we introduce an FPGA mapping algorithm improved by retiming technique used in constructive level and iterative level, and by fuzzy logic technique. Initial circuit is mapped into an FPGA circuit by constructive manner and improved by iterative retiming. Criteria given to the initial circuit are structured hierarchically by decision-making functions of fuzzy logic. The proposed system shows better results than previous systems by the experiments with MCNC benchmarkers.

  • PDF

Direction Prediction Based Resource Reservation in Mobile Communication Networks for Telematics (텔레매틱스를 위한 이동통신망에서 이동 방향 추정에 근거한 자원 예약)

  • Lee, Jong-Chan;Park, Ki-Hong;Lee, Yang-Weon
    • Journal of Internet Computing and Services
    • /
    • v.8 no.1
    • /
    • pp.1-14
    • /
    • 2007
  • IF handoff events are occurred during the transmission of multimedia traffic, the efficient resource allocation and handoff procedures are necessary to maintain the same QoS of transmitted multimedia traffic because the QoS may be defected by some delay and information loss, This paper proposes a handoff scheme to accommodate multimedia traffic based on the resource reservation procedure using direction estimation, This scheme uses a novel mobile tracking method based on Fuzzy Multi Criteria Decision Making, in which uncertain parameters such as PSS (Pilot Signal Strength), the distance between the mobile and the base station, the moving direction, and the previous location are used in the decision process using the aggregation function in fuzzy set theory, With the position information, the moving direction is determined, The handoff requests for real time sessions are handled based on the direction prediction and the resource reservation scheme, The resources in the estimated adjacent cells should be reserved and allocated to guarantee the continuity of the real time sessions, Through simulation results, we show that our proposed resource reservation method provides a better performance than that of the conventional method.

  • PDF

A Study on Simulation-based Method for Implementation of Ground Delay Program for Jeju International Airport (시뮬레이션 기반의 지상지연 프로그램 적용방안에 관한 연구 - 제주국제공항을 사례로 -)

  • Lee, Young-Jong;Cho, Ji-Eun;Baik, Ho-Jong
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.23 no.1
    • /
    • pp.41-48
    • /
    • 2015
  • Being a cost-efficient solution for alleviating the traffic congestion in airspace, Air Traffic Flow Management (ATFM) has drawn more attentions from not only air traffic controllers but also researchers in the field of Air Traffic Management (ATM). Among other ATFM initiatives, it is believed that Ground Delay Program (GDP) could be effectively applied to reduce the congestion particularly in the relatively small airspace with dense traffic demand. This paper introduces a novel way that suggests flights to be delayed on the departing airports together with amount of the delays (in time) for those flights to be delayed. Adopting a fast-time simulation for predicting airspace delay of each flight for a given flight plan, the method is designed to iteratively and incrementally adjust the departure times in the plan towards reducing total airspace delays. Applying the method to Jeju airport with a hypothetically high demand, the paper demonstrates the airspace delay could be significantly reduced by applying GDP at Gimpo airport where more than 60% of Juju-bound flights departure. Although the simulation model needs to be calibrated and validated for the real-world application, the results clearly shows that the approach can possibly implemented as a tool for preparing the daily plan at the pre-tactical stage defined in the ICAO ATFM manual.

A COMPARATIVE STUDY OF CAUSES AND EFFECTS OF PROJECT DELAYS AND DISRUPTIONS IN CONSTRUCTION PROJECTS IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY

  • Oshungade, Oluwaseun O.;Kruger, Deon
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.13-25
    • /
    • 2017
  • Construction projects have been observed to have problems of project delays and disruptions and the South African construction industry is not an exception. This research identified causes and effects of project delay and disruption through a desktop study. Subsequently, a questionnaire was designed and used to conduct a survey to obtain the views of the three main construction project participants - clients, consultants, and contractors. The questionnaire contains 48 causes and 13 effects of project delay and disruption identified from the desktop study. This research identified sixteen most important causes of project delay and disruption and five most important effects of delay and disruption. Sixteen most important causes were: (1) strikes, (2) rework due to errors during construction, (3) shortage of materials in market, (4) suspension of work by the client, (5) poor communication between the parties, (6) ineffective planning and scheduling of project, (7) delays in issuing working drawings, (8) mistakes and discrepancies in design documents, (9) shortage of labours and equipment, (10) delay in decision making process by the client, (11) unforeseen ground conditions, (12) unclear and inadequate details in drawing, (13) inadequate contractor's experience, (14) delay in approving changes in the scope of works, (15) delay in material delivery and (16) unacceptable quality of materials. The five major effects include: (1) create stress on contractors, (2) cost overrun, (3) time overrun, (4) poor quality of work due to rush, and (5) disputes. Furthermore, the result of this research was compared with the result of previous studies conducted in other regions of Africa in terms of causes and effects of project delay and disruption. The research concludes that numerous causes and effects of delay and disruption are limited to South African construction projects based on the comparison. The causes limited to South African construction projects include: (1) strikes, (2) suspension of work by the client (3) mistakes and discrepancies in design documents (4) delay in approving changes in the scope of works and (5) unacceptable quality of materials, while the two major effects limited to South African construction projects includes: (1) create stress on contractors and (2) poor quality of work. In conclusion, some recommendations were made in order to minimise the causes of delay and disruption identified.

Consumer confusion, shopping fatigue, and negative purchasing behavior in internet shopping environment (인터넷 쇼핑환경에서의 소비자 혼란과 쇼핑 피로감이 부정적 구매행동에 미치는 영향)

  • Kim, Jong-Ouk
    • The Research Journal of the Costume Culture
    • /
    • v.29 no.4
    • /
    • pp.505-521
    • /
    • 2021
  • This study analyzed the effects of consumer confusion on shopping fatigue and negative purchasing behaviors in an internet shopping environment. Further, the effects of shopping fatigue on negative purchasing behaviors were analyzed. The survey was conducted among consumers in their 20s and 40s in the Seoul metropolitan area who had experience of purchasing fashion products through internet shopping. A total of 392 questionnaire were analysis, with frequency, reliability, factor, correlation, and regression analysis completed using the SPSS statistics program. The results of the study showed that consumer confusion and shopping fatigue in internet shopping environment affected negative purchasing behaviors. First, consumer confusion comprised overload confusion, similarity confusion, and ambiguity confusion. It was found that overload confusion and similarity confusion significantly affected shopping fatigue. Second, shopping fatigue significantly affected negative purchasing behaviors, and an increased level of shopping fatigue result in, increased purchase delay and non-purchase behavior. Third, consumer confusion (overload confusion, similarity confusion, ambiguity confusion) significantly affected purchase delay behavior, while similarity confusion and ambiguity confusion significantly affected non-purchasing behavior. These results will provide useful data for e-CRM and marketing directions of internet companies and will contribute to rational decision-making of internet consumers and improve the quality of consumer life.

A Study on the Criteria for an Optimal Traffic Control at an Intersection System (교차로(交叉路)에서의 교통통제방법(交通統制方法) 선정기준(選定基準)에 관(関)한 연구(硏究))

  • Cha, Dong-Wan;Ryu, Chun-Beon;No, Hyeong-Bong;Jang, Seok-Gwon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.8 no.1
    • /
    • pp.29-39
    • /
    • 1982
  • This paper presents a practical guidence for determining an optimal traffic control system at intersections in the urban areas in Korea. Two alternative systems, unsignalized and signalized, are considered. For analyzing the unsignalized system, two kinds of simulation model are developed ; gap acceptance model and first -in -first - out model. For the signalized system the total delay function for general arrival distribution is developed under the assumption that departure time is constant and it is used to find an optimal cycle time. Finally, the results in these two alternative systems are compared under the minimum average delay criterion and an optimal traffic control system is determined. This approach supports the decision making whether to install a traffic signal system in an intersection with given traffic flows and, if installed, determines what is the optimal cycle time and how the traffic signal phases are divided. And it also gives upper bounds of traffic flows to be passed in the unsignalized and the signalized system, which can be effectively used whenever an intersection is designed.

  • PDF