• Title/Summary/Keyword: Delay cost

Search Result 821, Processing Time 0.032 seconds

Handoff Protocol for Improving Multicast Session Delay In Mobile Networks (이동네트워크에서 멀티캐스트 세션지연을 개선하기 위한 핸드오프 프로토콜)

  • Kwon, Sang-Do;Kim, Kyung-Jun;Kim, Cheol-Won
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.6
    • /
    • pp.1382-1390
    • /
    • 2010
  • A multicast session protocol in wireless networks reduces the session delay of multicast delivery caused by moving of mobile host. A hand-off scheme, called MSDR (multicast session delay reduction), in mobile networks is proposed. MSDR protocol that minimizes the delay of a session re-establishment uses the basic unicast routing function of the IETF mobile IP and the DFA (designated foreign agent) to provide multicast services for mobile hosts. Proposed MSDR protocol allows the mobile hosts to continuously receive packets when they move across the basic sets during hand-off. Discrete-event simulation carried out for performance evaluation of MSDR protocol, and simulation results indicated that our scheme can offer a better performance of multicast session delay reduction in terms of signalling cost than that of IETF.

Analysis of Delay Distribution and Rate Control over Burst-Error Wireless Channels

  • Lee, Joon-Goo;Lee, Hyung-Keuk;Lee, Sang-Hoon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.5A
    • /
    • pp.355-362
    • /
    • 2009
  • In real-time communication services, delay constraints are among the most important QoS (Quality of Service) factors. In particular, it is difficult to guarantee the delay requirement over wireless channels, since they exhibit dynamic time-varying behavior and even severe burst-errors during periods of deep fading. Channel throughput may be increased, but at the cost of the additional delays when ARQ (Automatic Repeat Request) schemes are used. For real-time communication services, it is very essential to predict data deliverability. This paper derives the delay distribution and the successful delivery probability within a given delay budget using a priori channel model and a posteriori information from the perspective of queueing theory. The Gilbert-Elliot burst-noise channel is employed as an a Priori channel model, where a two-state Markov-modulated Bernoulli process $(MMBP_2)$ is used. for a posteriori information, the channel parameters, the queue-length and the initial channel state are assumed to be given. The numerical derivation is verified and analyzed via Monte Carlo simulations. This numerical derivation is then applied to a rate control scheme for real-time video transmission, where an optimal encoding rate is determined based on the future channel capacity and the distortion of the reconstructed pictures.

Performance Analysis of Coordinated Cognitive Radio Networks under Fixed-Rate Traffic with Hard Delay Constraints

  • Castellanos-Lopez, S. Lirio;Cruz-Perez, Felipe A.;Rivero-Angeles, Mario E.;Hernandez-Valdez, Genaro
    • Journal of Communications and Networks
    • /
    • v.16 no.2
    • /
    • pp.130-139
    • /
    • 2014
  • Due to the unpredictable nature of channel availability, carrying delay-sensitive traffic in cognitive radio networks (CRNs) is very challenging. Spectrum leasing of radio resources has been proposed in the so called coordinated CRNs to improve the quality of service (QoS) experienced by secondary users (SUs). In this paper, the performance of coordinated CRNs under fixed-rate with hard-delay-constraints traffic is analyzed. For the adequate and fair performance comparison, call admission control strategies with fractional channel reservation to prioritize ongoing secondary calls over new ones are considered. Maximum Erlang capacity is obtained by optimizing the number of reserved channels. Numerical results reveal that system performance strongly depends on the value of the mean secondary service time relative to the mean primary service time. Additionally, numerical results show that, in CRNs without spectrum leasing, there exists a critical utilization factor of the primary resources from which it is not longer possible to guarantee the required QoS of SUs and, therefore, services with hard delay constraints cannot be even supported in CRNs. Thus, spectrum leasing can be essential for CRN operators to provide the QoS demanded by fixed-rate applications with hard delay constraints. Finally, the cost per capacity Erlang as function of both the utilization factor of the primary resources and the maximum allowed number of simultaneously rented channels is evaluated.

A COMPARATIVE STUDY OF DELAYS FACTORS IN PROJECT COMPLETION IN LIBYA AND UK CONSTRUCTION INDUSTRY

  • Shebob, A;Dawood, N; Xu, Q
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.614-620
    • /
    • 2011
  • Delays in completing construction projects have significant financial and social impact to all parties involved in the construction process and in particular in developing countries. This is very evident in most construction projects in Libya and in both public and private sectors. The research study was initiated by Libyan Government and the main aim of the project is to develop a new strategy in reducing the impact of delay factors. In order to achieve this, a number of objectives have been set-to conduct a comprehensive literature survey, to conduct a comparative study of the delay factors in project completion in both Libya and UK using semi structured questionnaire and finally, to identify and analyse the causes of delay and ranked them using frequency of occurrence and severity. The critical causes of delay for construction projects were quite different between Libya and UK. For the former, the most critical causes of delay in Libyan construction industry were low skills of manpower, changes in the scope of the project, slowness in giving instruction and poor qualification of consultant, while for the latter they were financial problems, bad weather conditions on the job site and change in the scope of project. Statistical experiments including Paired Samples T-Test, was run to test the significance of the survey data in both countries Libya and UK. The statistical results confirmed the collected data from the survey were significant.

  • PDF

Receding Horizon $H_{\infty}$ Predictive Control for Linear State-delay Systems

  • Lee, Young-Sam
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.2081-2086
    • /
    • 2005
  • This paper proposes the receding horizon $H_{\infty}$ predictive control (RHHPC) for systems with a state-delay. We first proposes a new cost function for a finite horizon dynamic game problem. The proposed cost function includes two terminal weighting terns, each of which is parameterized by a positive definite matrix, called a terminal weighting matrix. Secondly, we derive the RHHPC from the solution to the finite dynamic game problem. Thirdly, we propose an LMI condition under which the saddle point value satisfies the well-known nonincreasing monotonicity. Finally, we shows the asymptotic stability and $H_{\infty}$-norm boundedness of the closed-loop system controlled by the proposed RHHPC. Through a numerical example, we show that the proposed RHHC is stabilizing and satisfies the infinite horizon $H_{\infty}$-norm bound.

  • PDF

Damping Control of the HB step motor using the BACK-EMF signal (역기전력을 이용한 HB스텝 모터 의 댐핑 제어)

  • Chun, Seong-Ho;Huh, Uk-Youl;Lee, Seung-Hoo
    • Proceedings of the KIEE Conference
    • /
    • 1989.07a
    • /
    • pp.75-78
    • /
    • 1989
  • In this paper, A last time delay damper is presented for HB ( HyBrid ) step motor, which has large oscillation characteristics.The design objective is to develop a cost-effective and good-performance damper that would be applyed to HB step motor / driver system without the addition of transducer that would add a weight, size and cost to the system. The Back EMF signal which is recovered from current and voltage signal is used for the measuring the rotor position. It would be possible to get more accurate delay time for the motor driver system. It is proved that the maximum overshoot can be reduced to 13% at stopping through experiment.

  • PDF

A Cost-Effective Rate Control for Streaming Video for Wireless Portable Devices

  • Hong, Youn-Sik;Park, Hee-Min
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.5 no.6
    • /
    • pp.1147-1165
    • /
    • 2011
  • We present a simple and cost effective rate control scheme for streaming video over a wireless channel by using the information of mobile devices' buffer level. To prevent buffer fullness and emptiness at receivers, the server should be able to adjust sending rate according to receivers' buffer status. We propose methods to adjust sending rate based on the buffer level and discrete derivative of the buffer occupancy. To be compatible with existing network protocols, we provide methods to adjust sending rate by changing the inter-packet delay (IPD) at the server side. At every round-trip time, adjustments of sending rate are made in order to achieve responsiveness to sudden changes of buffer availabilities. A series of simulations and the prototype system showed that the proposed methods did not cause buffer overflows and it can maintain smoother rate control and react to bandwidth changes promptly.

An Analysis on Relations between Design Errors Detected during BIM-based Design Validation and the Impacts Using Logistic Regression (로지스틱 회귀분석을 이용한 BIM 설계 검토에 의하여 발견된 설계 오류와 그 영향도간의 관계 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.264-265
    • /
    • 2017
  • This paper aims to analyze relations between design errors prevented by building information modeling (BIM)-based design validation and their impacts in order to identify critical consideration factors for successfully implementing BIM-based design validation in the architecture, engineering, and construction (AEC) projects. More than 800 design errors detected by BIM-based design validation in two BIM-based projects in South Korea are categorized according to its causes and work types. The relations between causes and work types of design errors and project delay, cost overrun, low quality, and rework generation that can be caused by the errors are analyzed through conducting logistic regression. Characteristics of each design error are analyzed by conducting face-to-face interviews with practitioners in the two BIM-based projects. As the results, the impacts of design error causes on predicting project delay, cost overrun, low quality, and rework generation were the highest.

  • PDF

Optimum QoS Classes in Interworking of Next Generation Networks

  • Khoshnevis, Behrouz;Khalaj, Babak H.
    • Journal of Communications and Networks
    • /
    • v.9 no.4
    • /
    • pp.438-445
    • /
    • 2007
  • In this paper, we consider the problem of optimum selection of quality-of-service(QoS) classes in interworking between the networks in a next-generation-network(NGN) environment. After introducing the delay-cost and loss-cost characteristics, we discuss the time-invariant(TI) and time-variant(TV) scenarios. For the TI case, we show that under nearly lossless transmission condition, each network can make its own optimization regardless of other networks. For the TV case, we present sufficient conditions under which the optimum QoS class of each network can be considered fixed with respect to time without considerable degradation in the optimization target. Therefore, under the conditions presented in this paper, the QoS of a flow in each network can be determined solely by considering the characteristics of that network and this QoS class can be held fixed during the flow period.

Distributor's Reliable Price and Inventory Policy for Decaying Items under Permissible Delay in Payments and freight Discount Cost in a Supply Chain (신용거래와 수송비의 할인을 허용하는 공급사슬에서 퇴화성제품에 대한 신뢰성있는 재고 및 가격정책)

  • Shinn Seong-Whan
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.2
    • /
    • pp.155-167
    • /
    • 2006
  • 본 논문은 제품공급자, 중간분배자 그리고 고객으로 구성된 2 단계 공급사슬에서 공급자가 수요 증대를 목적으로 중간분배자에게 일정기간 동안 제품대금에 대한 지불연기를 허용하는 상황을 고려하여 중간분배자의 신뢰성있는 판매가격 및 재고보충정책을 결정하는 문제를 다루었다. 문제 분석을 위하여 고려하는 제품은 시간에 따라 일정률로 퇴화한다는 가정과 함께 수송량에 따라 할인되는 수송비를 고려하여 모형을 수립하였고, 중간분배자의 수익 증대를 위한 경제적 판매가격 및 재고보충정책 결정을 위한 해법을 개발하였다.