• Title/Summary/Keyword: Delay causes

Search Result 502, Processing Time 0.027 seconds

Bio-inspired Node Selection and Multi-channel Transmission Algorithm in Wireless Sensor Networks (무선 센서망에서 생체시스템 기반의 전송노드 선택 및 다중 채널 전송 알고리즘)

  • Son, Jae Hyun;Yang, Yoon-Gi;Byun, Hee-Jung
    • Journal of Internet Computing and Services
    • /
    • v.15 no.5
    • /
    • pp.1-7
    • /
    • 2014
  • WireWireless sensor networks(WSNs) are generally comprised of densely deployed sensor nodes, which causes highly redundant sensor data transmission and energy waste. Many studies have focused on energy saving in WSNs. However, delay problem also should be taken into consideration for mission-critical applications. In this paper, we propose a BISA (Bio-Inspired Scheduling Algorithm) to reduce the energy consumption and delay for WSNs inspired by biological systems. BISA investigates energy-efficient routing path and minimizes the energy consumption and delay using multi-channel for data transmission. Through simulations, we observe that the BISA archives energy efficiency and delay guarantees.

Relationship among Degree of Time-delay, Input Variables, and Model Predictability in the Development Process of Non-linear Ecological Model in a River Ecosystem (비선형 시계열 하천생태모형 개발과정 중 시간지연단계와 입력변수, 모형 예측성 간 관계평가)

  • Jeong, Kwang-Seuk;Kim, Dong-Kyun;Yoon, Ju-Duk;La, Geung-Hwan;Kim, Hyun-Woo;Joo, Gea-Jae
    • Korean Journal of Ecology and Environment
    • /
    • v.43 no.1
    • /
    • pp.161-167
    • /
    • 2010
  • In this study, we implemented an experimental approach of ecological model development in order to emphasize the importance of input variable selection with respect to time-delayed arrangement between input and output variables. Time-series modeling requires relevant input variable selection for the prediction of a specific output variable (e.g. density of a species). Inadequate variable utility for input often causes increase of model construction time and low efficiency of developed model when applied to real world representation. Therefore, for future prediction, researchers have to decide number of time-delay (e.g. months, weeks or days; t-n) to predict a certain phenomenon at current time t. We prepared a total of 3,900 equation models produced by Time-Series Optimized Genetic Programming (TSOGP) algorithm, for the prediction of monthly averaged density of a potamic phytoplankton species Stephanodiscus hantzschii, considering future prediction from 0- (no future prediction) to 12-months ahead (interval by 1 month; 300 equations per each month-delay). From the investigation of model structure, input variable selectivity was obviously affected by the time-delay arrangement, and the model predictability was related with the type of input variables. From the results, we can conclude that, although Machine Learning (ML) algorithms which have popularly been used in Ecological Informatics (EI) provide high performance in future prediction of ecological entities, the efficiency of models would be lowered unless relevant input variables are selectively used.

A Study on the RSVP_Proxy for Micro Mobility (마이크로 이동성 위한 RSVP_Proxy에 관한 연구)

  • 박승균;오영환
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.28 no.9B
    • /
    • pp.774-782
    • /
    • 2003
  • Generally, in the Mobile IP technologies, the use of RSVP(Resource ReSerVation Protocol) is recommended in order to provide a mobile node real-time service. However, the handoff of a mobile node increases the registration delay, RSVP reservation delay and signalling overhead in the Mobile IP and RSVP interworking. Specially, the resource reservation on the path between a mobile node and a correspondent node is the duplicated reservation and then causes unnecessary creation of the signalling overhead and waste of the resource, since the majority of the path before handoff and after handoff is same. If the radius of a cell providing a wireless interface to a mobile node is small, the number of handoff will increase and also signalling overhead and duplicated resource reservation will increase. In this paper, we proposed the integration model of Cellular IP and RSVP with RSVP proxy scheme. Here, Cellular IP protocol minimizes registration delay, transfer delay, and loss by handoff in micro cell network, the RS VP proxy that minimizes the duplication of resource reservation prevents the path for RSVP session from change using the address for reservation of a mobile node. Proposed scheme was evaluated in comparison with the existing Mobile IP and RSVP interworking scheme using the probability of resource reservation fail to the radius of a cell and the handoff rate.

Improved Cluster-Based Routing Protocol Using Paired-header of Cluster in The Mobile Ad-Hoc Network (모바일 애드혹 네트워크에서 클러스터의 페어 헤드 노드를 이용한 향상된 CBRP)

  • Kim, ChangJin;Kim, Wu Woan;Jang, Sangdong
    • Journal of Korea Multimedia Society
    • /
    • v.16 no.1
    • /
    • pp.56-66
    • /
    • 2013
  • In MANET, the frequent movement of nodes causes the dynamic network topology changes. Therefore, it is required that the routing protocol should be very stable to effectively respond the changes of the network changes. Moreover, the existing cluster-based routing protocol, that is the hybrid approach, has routing delay due to the re-electing of the cluster header. In addition, the routing table of CBRP has all only one hop distant neighbor nodes. PCBRP, proposed in this paper, ties two clusters in one paired cluster to make longer radius. Then the headers of the paired cluster manage and operate corresponding member nodes. In the current CBRP, when the cluster header leaves out the cluster, the delay, due to the re-electing a header, should be occurred. However, in PCBRP, another cluster header of the paired cluster plays the role instead of the left cluster header. This method reduces the routing delay. Concurrently, PCBRP reduces the delay when they route nodes in the paired cluster internally.

Analysis and Evaluation of the Distributed Control Braking System of Long Freight Car Brakes (장대화물열차의 분산제어 제동 시 연결기에 발생하는 충격력 해석 및 분석)

  • Cho, Byung Jin;Lee, Jeong Jun;Shim, Jae Seok;Koo, Jeong Seo;Mun, Hyung Seok
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.18 no.2
    • /
    • pp.65-72
    • /
    • 2019
  • In long freight trains, there is a brake time delay in neighboring freight cars, which causes damage and fractures in the couplers, especially at their knuckle. A problem in the couplers of the cars can cause derailment and damages of human life and property. In this study, maximum forces on the couplers are studied when a long freight car brakes with the brake delay time and coupler gap. We make a dynamic model of 50 freight cars and couplers, applying contact between the couplers and a characteristic curve to express the force and displacement of the buffers using SIMPACK, which is a multi-body dynamics program. We use EN 14531-2, which is a standard of freight car brakes, to verify the dynamic model. Then, we compare the analyzed impact force with the coupler knuckle standard after applying the two carriages of a locomotive in the model based on the dispersed double head control system. The result shows that all coupler gap conditions satisfy the infinite lifetime of the material when the brake delay time is 0.1 second.

Estimating System for Responsible Days of Schedule Delay for Construction Projects through Time Impact Analysis (건설공사 공기지연 영향분석을 통한 책임일수 산정체계 구축방안)

  • Kang, Leen-Seok;Kwon, Jung-Hee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.685-694
    • /
    • 2008
  • Recently, construction projects are being gradually changed to large projects with complicated work processes. As a result, claims are increasing as well. Of these, the claims by delayed construction duration are given much weight in the general construction claims. To solve this problem, researches to estimate damages due to delay are carried out in research institutes by analyzing the causes of schedule delay. A system to easily estimate responsible days by analyzing the complicated processes needs for project manager. This study suggests a methodology based on the time impact analysis method, which can utilize the consequential analytical method with the consideration of reduced construction period. The suggested methodology is verified by comparing with actual data of case study by the computerized system for estimating the responsible days.

Compromised compensation: evaluating the fitness costs of tolerance responses in plants facing herbivore-induced delayed germination and intraspecific competition

  • Jeong-Min Kim;Min-Soo Choi;Juhee Lee;Yong-Chan Cho; Youngsung Joo
    • Journal of Ecology and Environment
    • /
    • v.48 no.3
    • /
    • pp.308-318
    • /
    • 2024
  • Background: Many plants compensate for the damage caused by herbivorous insects through tolerance responses. Besides directly causing plant tissue loss and seed production reduction, herbivory causes phenological changes in the host plant. However, little is known about the fitness costs of phenological changes caused by tolerance responses to herbivorous attacks. Results: The girdling beetle Phytoecia rufiventris caused a short-term decrease in the number of flowers of the host plant Erigeron annuus. However, accelerated growth restored the number of flowers, but after a 2-week delay. With an objective to examine whether the tolerance response with such a delay fully compensates the fitness, we experimentally reproduced a 2-week delay in germination under greenhouse and field settings. Under both conditions, intraspecific competition resulted in serious defects in the growth and reproduction of E. annuus plants which of germination was delayed. However, delayed germination (DG) resulted in better growth when competition and herbivory were eliminated from the field. Thus, we showed that the tolerance response to restore reproductive production does not fully compensate for the fitness loss caused by insect attack; rather, the delay in seed production in attacked plants leads to DG and subsequent inferiority in intraspecific competition. Conclusions: Our results imply that compensation for floral production after an herbivore attack does not fully restore offspring fitness in the presence of intraspecific competition and herbivory. Assessing the ecological consequences of defense traits in an appropriate layer of interaction is critical to interpreting adaptive values.

End-to-End Method for Improving TCP Performance for MANET (MANET용 TCP의 성능 개선을 위한 단-대-단 방법)

  • Yim Jaegeol
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.42 no.2 s.302
    • /
    • pp.1-10
    • /
    • 2005
  • The current implementation of TCP for the Internet is not efficient when used for Mobile Ad hoc Networks (MANENTs). This is because TCP assumes that all packet losses are caused by congestion, whereas transmission errors are a main reason for packet losses in wireless networks. To remedy this situation and increase performance, we propose an end-to-end method of using propagation delays and the differences between propagation delays to distinguish the causes for packet losses. The proposed method has two characteristics: Firstly, it is energy-efficient because this solution is only initiated when a packet loss is detected. Secondly, our approach considers only the one way propagation delay and is more accurate in determining causes for packet losses than existing methods which consider round trip time. Petri net models of the proposed TCP and of the standard TCP have been built and simulations have been performed on them. Our simulation results show that the proposed approach increases throughput and reduces propagation delay compared with standard TCP.

Design of Multi-Phase Shift Controller for Valveless PZT Pump (밸브리스 압전펌프 연동구동 제어기 설계)

  • 조정대;박경민;노종호;함영복;유진산
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.1282-1285
    • /
    • 2004
  • The high voltage driving system with multi-phase shifter including piezoelectric actuators comprised a driving power unit for outputting the driving power by converting input alternate current into direct current, a frequency shifting unit for supplying the direct current power and shifting or generating a frequency, a high-voltage amplification unit for amplifying the input signal outputted from the driving power unit and the frequency shifting unit into a high-voltage signal, and a phase shifting unit for shifting the phase difference of the amplified signal applied to the high-voltage amplification unit and driving plural piezoelectric actuators sequentially. The results that the operating voltage was stable, the voltage loss ratio was low and the response velocity was fast could be obtained. An experiment on performance of the high voltage driving system with multi-phase shifter designed and manufactured as above described was conducted by using a piezoelectric pump having 3 sheets of round unimorph piezoelectric actuators laminated respectively in a rectangular case. It sucks any fluid by causing the first piezoelectric actuator to shift from the inlet porter side, the phase delay of 60$^{\circ}$ causes the second piezoelectric actuator to begin to shift, and the phase delay of 120$^{\circ}$ causes the third piezoelectric actuator to begin to shift. As a result of measuring each change in the outlet flow rate of the piezoelectric pump, it was shown that the frequency-flow rate characteristic, the voltage-flow characteristic, and the load pressure-flow rate characteristic were improved.

  • PDF

Delayed use of Operating Rooms in a University Hospital (한 대학병원의 수술실 이용 지연요인과 개선방안에 관한 연구)

  • Kim, Kyung-Ae;Yu, Seung-Hum;Kim, In-Sook;Sohn, Tae-Yong;Park, Eun-Cheol
    • Korea Journal of Hospital Management
    • /
    • v.7 no.3
    • /
    • pp.44-62
    • /
    • 2002
  • Advanced surgical technology demands more precise, meticulous, and time-consuming procedures. In addition, the patient's preference of tertiary health providers makes over crowding of the University Hospitals. Therefore, it has been necessary to maximize utilization of the operating room of such hospitals to accommodate these requirements. This study, targeting 1,302 surgical cases performed in 22 operating rooms at a university hospital in Seoul from October 8 to November 1, 2001, analyzed reasons for delay, and factors that caused delayed use of operating rooms. This study also assessed that the rate of operating room use would increase if the sources for possible reform were improved. 1. Among total of 1,302 cases of surgery, the incidence of surgeries in which there were no time delays and no factors for delay were discovered is 71.4% or 930 cases: the incidence in which surgeries were delayed was 28.6% or 372 cases. 2. As results of logistic regression for delay, procedures involving women were delayed 1.4 times more frequently than those of men. Compared to Department A, Department B was 1.8 times more likely to be delayed, and Department H was 0.4 times less likely to be delayed. Regional anesthesia was 2.4 times more likely to be delayed than general anesthesia, and surgeries that PCA was applied were 0.6 times less likely to be delayed than those when it was not. Surgeries performed on the Thursday were 1.7 times more likely to be delayed than those performed on the Monday. Compared to surgeries performed between 07:00-07:59, those performed between 08:00-08:29 were 4.3 times higher. 3. The reasons for delay were related to surgeon, surgical department, patient, anesthesia, administrative system, sick ward, and support services. Among these, 5,755 minutes for 276 delayed cases could be resolved easily, and resolving delays of 3,320 minutes for 131 cases would be more difficult. Among the causes for delay that could be improved, delays due to patient's transfer and surgeon's factor were the most common, 21.6% and 17.4% respectively. 4. If resolvable delays are improved, pre-anesthesia room is administered, and regional anesthesia and PCA are done ahead of time, use of emergency operating rooms will increase, we can increase overall utilization by 4.09%, we will save 744 minutes a day, we can reduce the time the operation room is used after 4 PM by 35%, and we can resolve the operation cancellations due to insufficient operating rooms. For the increase in the use of operating rooms, we need to maximally decrease the delays that could be improved, by allocating block time based on used totals hours of elective cases, giving accurate information on surgery schedule, voluntary cooperation by staff participating in surgeries in reducing delay time, and the hospital management's will to improve delay.

  • PDF