• Title/Summary/Keyword: Delay Risk

Search Result 291, Processing Time 0.024 seconds

Analysis of Train Operation Obstacle Using Number of Failures and Delay Time of Electric Door System (전기식 도어시스템의 고장건수 및 지연시간을 활용한 열차운행장애 분석)

  • Lee, Bon Hyung;Kim, Doo-Hyun;Kim, Sung-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.1
    • /
    • pp.12-17
    • /
    • 2020
  • This paper analyzes functions of component parts of D-Urban Railway's door system along with operation obstacle risks on frequency(the number of occurrences/year) and severity(delay time/the number of occurrences). Based on this, the paper presents improvements and current system's problems after obstacle risks of EMU and door system are appled. The obstacle of door system causes corrosion of main parts such as DCU due to heat problem of operation environment, problems of maintenance methods and deterioration. DCUs on PCBs with more than 50% pattern corrosion cause problems. Even though the number of door system's obstacle occurrences for the last 5 years is 42, along with 104 minutes of operation obstacle, EMU operation obstacle risk is low(Level 1), which indicates there is limit in matrix of railway risks presented by the standard of railway safety management system. Therefore, it is necessary to have railway risk matrix suitable for the field. Finally, the paper deducts the obstacle risks through frequency and severity. Since 2017 when the risks of EMU and door system's obstacle, that of EMU has been 24(47% reduced) and that of door system has been average 9.5 per year(23% reduced).

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

  • Shebob, Abdulhamid;Dawood, Nashwan;Shah, Raj K.
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.17-29
    • /
    • 2012
  • Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.

The Effects of Decision Making Delay on Experienced Emotion for Internet Shopping and Internet Shopping Mall Satisfaction (인터넷 쇼핑 중 구매결정 연기가 쇼핑감정과 쇼핑몰 만족도에 미치는 영향)

  • Kim, Hanna
    • Asia Marketing Journal
    • /
    • v.10 no.1
    • /
    • pp.133-160
    • /
    • 2008
  • The purpose of this study was to identify the effects of the delay reasons in consumer decision making on experienced emotion and shopping mall satisfaction under the Internet shopping environment. A survey was conducted for this study and 500 answer sheets were analyzed using structural equation modeling. The results are as follows: First, performance risk, financial risk, and social risk significantly have a positive effect on negative emotions for Internet shopping. Second, performance risk has a significant negative effect on positive emotions for Internet shopping. Third, social risk and procedural uncertainty significantly have a positive effect on positive emotions and this shows these reasons are related to pleasure and fun. Forth, needs uncertainty has a negative effect on negative emotions for Internet shopping. Finally, positive and negative emotions that consumer experienced for Internet shopping affect Internet shopping mall satisfaction.

  • PDF

Analysis of Train Delay in Daejeon Metro (대전도시철도의 열차 지연운행 분석연구)

  • Kwon, Young-Seok;Lee, Jin-Sun
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.1
    • /
    • pp.50-57
    • /
    • 2017
  • This study investigated the causes and problems of train operation impediments through the statistics analysis of 8 years'internal data of Daejeon Metropolitan Express Transit. By evaluating the risks regarding the system, equipment, and parts of high risk group, this study measured the Risk Index Severity, and applied the $5{\times}5$ Risk Assessment Matrix which is a method of risk management to calculate the scale of risk to analyze the safety level and allowance range. As a result, the car sector, the most serious risk, followed by machinery and equipment sector showed that the inherent risk. In particular, the door broken and the door rail signaling and control devices due to defects of the vehicle is high, but also the severity, and frequency are showing very frequent additional potential accidents. PSD also had defects in the machinery sector appeared to be the most dangerous of the PSD poor safety gates, it was found that the glass also involve the risk of mishandling and breakage of the PSD. This study intended to contribute to the transportation benefits through the safety and stable operation of Metropolitan Express Transit.

Investigating delay factors in construction industry: A Korean perspective

  • Acharya, Nirmal Kumar;Im, Hae-Man;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.177-190
    • /
    • 2006
  • Construction projects are facing delay problems. Delays in construction have been immense effect on performance or satisfactory delivery of the project. Delays have been causing project cost overrun as well as it is a source of dispute hence damaging the relationship between the project participants. The purpose of this study was to explore the causes of delay risk through a field survey study. Data were collected from construction professionals working in owner, consultant and contractor organizations. All together 208 questionnaire instruments were used and analyzed by employing statistical tools (SPSS computer program). 19 delay factors were identified by this study, out of which following factors were critical: Frequent interruptions from public (local people, pressure group etc.), changed site condition, failure to provide required construction site, unrealistic project time estimation and design errors.

Regression Technique-based Productivity Estimation conducting Construction Delay Factor Analysis on Interior Works in High-rise Building Construction (공기지연요소분석을 이용한 회귀분석 기반 초고층 내부공사의 생산성 예측)

  • Kim, Hyun-mi;Kim, Tae-Hyung;Shin, Young-Keun;Kim, Young-Suk;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.191-192
    • /
    • 2011
  • The construction projects contain a lot of variables and risk affecting productivity. The duration of the project must be recognized important as for quality, unit cost and safety. There is need for improving work efficiency by investigating relationship of works to prevent delay. This study focuses on analysing the delay factors of steel staircase system to suggest regression model that enables construction productivity estimation. The position of the observers and construction delay factors were expressed by the independent variable of the regression model and productivity was expressed by a dependent variable. This paper suggests quantitative productivity and it is expected that will be helpful estimating application in construction new technologies.

  • PDF

Predictable Risk Factors for Adjacent Segment Degeneration After Lumbar Fusion

  • Hyun, Seung-Jae;Kim, Young-Baeg;Hong, Hyun-Jong;Kwon, Jeong-Taik;Suk, Jong-Sik;Min, Byung-Kook
    • Journal of Korean Neurosurgical Society
    • /
    • v.41 no.2
    • /
    • pp.88-94
    • /
    • 2007
  • Objective : The aim of this study is to investigate predictable risk factors for radiologic degeneration of adjacent segment after lumbar fusion and preoperative radiologic features of patients who underwent additional surgery with adjacent segment degeneration. Methods : Between January 1995 and December 2002, 201 patients who underwent lumbar fusion for degenerative conditions of lumbar spine were evaluated. We studied radiologic features, the method of operation, the length of fusion, age, sex, osteoporosis, and body mass index. Special attention was focused on, preoperative radiologic features of patients who required additional surgery were studied to detect risk factors for clinical deterioration. Results : Follow-up period ranged from 3 to 11 years. In our study, 61 [30%] patients developed adjacent segment degeneration, and 15 [7%] patients required additional surgery for neurologic deterioration. Age, the postoperative delay, facet volume, motion range, laminar inclination, facet tropism, and preexisting disc degeneration of adjacent segment considered as possible risk factors. Among these, laminar inclination and preexisting disc degeneration of adjacent segment were significantly correlated with clinical deterioration. Conclusion : The radiologic degeneration of adjacent segment after lumbar fusion can be predicted in terms of each preoperative radiologic factor, age and the postoperative delay. Laminar inclination and preexisting disc degeneration of adjacent segment have shown as strong risk factors for neurologic deterioration. Thus, careful consideration is warranted when these risk factors are present.

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

A Checklist for Assessment of Risks Involved in IT Service Project Contract (IT 서비스 프로젝트 계약서 위험 요인 평가 체크리스트)

  • Jeong, Eun Joo;Jeong, Seung Ryul
    • Journal of Internet Computing and Services
    • /
    • v.15 no.4
    • /
    • pp.57-65
    • /
    • 2014
  • Risk factors are the reason behind cost overruns and delays in long-term large-scale IT service projects. Major risks originate from the integration of complex IT system components, including software, hardware, and solutions; the competitive bidding process; the turnkey and firm-fixed price nature of contracts; and the project execution environment. We have identified several risk factors such as delay in acceptance, low quality of deliverables, delay in payment, adding and changing requirements and scope, unclear definition of roles and responsibilities of the buyer and supplier, and unclear procedures of change and quality management during the project execution phase. One needs to manage risks proactively before signing the contract. In order to weed out or lower the risk factors well in advance, we need to identify and remove risk factors contained in contract clauses and attached contract documents. We propose a checklist for assessing IT service project contracts. To validate the checklist's utility, we applied it to an IT service project in the finance industry. The results show that the checklist is effective in identifying and removing risk factors pertaining to IT service projects.