• 제목/요약/키워드: Delay Damages

검색결과 61건 처리시간 0.026초

Time delay study for semi-active control of coupled adjacent structures using MR damper

  • Katebi, Javad;Zadeh, Samira Mohammady
    • Structural Engineering and Mechanics
    • /
    • 제58권6호
    • /
    • pp.1127-1143
    • /
    • 2016
  • The pounding phenomenon in adjacent structures happens in severing earthquakes that can cause great damages. Connecting neighboring structures with active and semi-active control devices is an effective method to avoid mutual colliding between neighboring buildings. One of the most important issues in control systems is applying online control force. There will be a time delay if the prose of producing control force does not perform on time. This paper proposed a time-delay compensation method in coupled structures control, with semi-active Magnetorheological (MR) damper. This method based on Newmark's integration is adopted to mitigate the time-delay effect. In this study, Lyapunov's direct approach is employed to compute demanded voltage for MR dampers. Using Lyapunov's direct algorithm guarantees the system stability to design a controller based on feedback. Because of the strong nonlinearity of MR dampers, the equation of motion of coupled structures becomes an involved equation, and it is impossible to solve it with the common time step methods. In present paper modified Newmark-Beta integration based on the instantaneous optimal control algorithm, used to solve the involved equation. In this method, the response of a coupled system estimated base on optimal control force. Two MDOF structures with different degrees of freedom are finally considered as a numeric example. The numerical results show, the Newmark compensation is an efficient method to decrease the negative effect of time delay in coupled systems; furthermore, instantaneous optimal control algorithm can estimate the response of structures suitable.

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

젯팅 디스펜서 변위확대장치의 응답지연 개선 연구 (Improvement for Response Delays of Displacement Magnifier in Jetting Dispenser)

  • 하명우;이광희;홍승민;이철희
    • 한국소음진동공학회논문집
    • /
    • 제26권5호
    • /
    • pp.546-551
    • /
    • 2016
  • The objective of this study is to investigate the response delays between piezo-stack actuator and the displacement magnifier of jetting dispenser and to reduce its falling time in terms of displacement optimization. The dispenser is driven by the dual piezo-stack actuators with a hinge lever mechanism to precisely control flow rate of the working fluid (3000 cP). It is commonly found that piezo actuator-driven jetting dispensers involving viscous working fluids have displacement optimization problem for ideal performance. The response delay of the system is caused by the phenomenon that the displacement magnifier cannot exactly follow the motion of the piezo actuators. The response delay may lower the performance of the system due to the inaccurate discharge of working fluid or even damages to the system itself due to inharmonious motion of piezo actuators with lever system. To reduce its response delay, a new displacement profile obtained from displacement optimization is suggested; its performance is tested through finite element analysis; and experiments are carried out to verify the performance of the obtained displacement profile.

지연시차에 따른 발파진동의 주파수 특성 예측 (Prediction of Principal Frequency of Ground Vibration from Delayed Blasting)

  • 정두성;강추원;고진석;장호민;류복현
    • 터널과지하공간
    • /
    • 제20권2호
    • /
    • pp.112-118
    • /
    • 2010
  • 도심지 발파와 같이 인체나 구조물에 직접적인 영향을 미칠 수 있는 발파 작업 시에는 지반진동의 영향성 평가 작업이 필수적으로 선행되어야 한다. 이로 인해 주파수가 지반진동의 특성에 관하여 미치는 영향과 피해여부를 판단하는 중요한 요소로 인식되고 있다. 주파수의 영향에 대해서 많은 연구가 이뤄지고 있지만, 이러한 연구들은 지반진동의 발생과 전파에 있어서 지연시차에 따른 주파수 특성을 연구한 것은 아니었다. 따라서 본 연구에서는 Langefors의 시차이론에 근거한 단일공 파형에 의한 중첩모델링으로 얻어진 지연시차를 통하여 지반 진동의 간섭에 있어 보강과 상쇄간섭이 반복되는 각각의 지연시차에 따른 주파수의 관계를 고찰하였다.

Factors Affecting Timely Completion of Construction Projects in Nepal

  • ;이영대;김수용
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.254-257
    • /
    • 2003
  • It is common to experience delays during construction projects. Delays can ca use substantial damages to an owner as well as contractors and is the sources of frequent disputes and claims. Many studies have been carried out to assess the causes of delays in construction projects. They are found to be almost similar, except some prevailed local condition. Most of the common construction delay factors are attributed to design faults, incompetent contractor, lack of team accountability etc. To minimize or eliminate the delay we have to follow the recognized fundamental principles of management such as: cost-time relationship, time priority, accountability, rewards, innovative thinking etc. The root causes of delays found out in this paper are not so much different than other previous study. If the implementing agencies properly followed the, fundamental management principles and some other related corrections as recommended in the paper, much construction delays can be avoided.

  • PDF

건설공사 공기연장사유 관리모델 (An Administration Model for Causation of the Schedule Delays in Construction Projects)

  • 김종한;김경래
    • 한국건설관리학회논문집
    • /
    • 제8권3호
    • /
    • pp.125-133
    • /
    • 2007
  • 건설공사 계약에서 공기연장 시에는 계약당사자의 귀책에 따라 지체상금의 부과 내지는 연장비용을 지급토록 규정하고 있으나, 그 이행에 있어 당사자의 정량적 귀책구분 등 분석결과에 의해 전형적으로 이행되는 경우는 거의 없다고 할 수 있다. 결국 이는 수행참여자의 계약적 의무이행에 대한 책임회피이며, 향후 잠재된 공기연장클레임 등 더 많은 시간과 비용을 지불해야 하는 분쟁으로 비화될 것은 자명하다 할 것이다. 그 원인으로는 현행의 CPM 네트워크공정표에 의한 공정관리 방법 이 수동적이고 사후적 인 관리로서 공기 연장이 발생한 후, 그 사유 및 기간의 책임분석을 통한 관리로 그 한계성으로 인하여 연장예방 및 클레임해결이 불가능한 것이다. 따라서 본 연구에서는 현행 계약자들의 공정관리 수준을 고려하고, 공기연장의 핵심이라 할 수 있는 연장사유에 대한 사전관리를 통한 프로세스 접근방식(Process Approach)의 공기연장사유 관리모델을 제시하여 프로젝트 수행 당사자의 책임의식 고취와 책임관리, 사전관리, 증거관리를 능동적으로 수행 가능할 수 있게 하여, 공기 연장예방 및 당사자의 원만한 클레임해결을 위한 관리기준 모델을 제시하는 것이다.

이동 페이딩 채널하의 멀티 스텝 채널 예측기를 이용한 적응 OFDM 시스템의 성능개선 (Performance Improvement on Adaptive OFDM System with a Multi-Step Channel Predictor over Mobile Fading Channels)

  • 안현준;김현동;최상호
    • 한국통신학회논문지
    • /
    • 제31권12A호
    • /
    • pp.1182-1188
    • /
    • 2006
  • 적응 변조 OFDM(Orthogonal Frequency Division Multiplexing) 전송 기법은 각 부반송파의 채널 상태에 따라 변조방식을 적절히 변화시켜 무선 채널의 다중 경로 페이딩에 의해 의한 영향을 최소화하여 시스템의 성능을 증가시키는 방식이다. 시스템이 적응적으로 전송하기위해서는 단말기에서 각 부반송파(subcarrier)별 채널 상태 정보 (Channel State Information : CSI)를 되먹임 채널을 통해 실시간으로 기지국으로 전송해 주어야한다. 하지만, 단말기에서 데이터를 처리할 때 걸리는 시간과, 단말기에서 기지국으로 CSI를 되먹임(feedback) 할 때 걸리는 시간으로 인한 되먹임 지연(feedback delay) d가 발생하게 된다. 이 되먹임 지연은 CSI 정보의 불일치를 발생시켜 적응 OFDM 시스템의 성능저하를 일으킨다. 본 논문에서는 CSI의 되먹임 지연 $d(\geq2)$를 적절히 보상하는 주파수 축 멀티 스탭 채널 예측기를 제안하고 이를 적응 전송 OFDM 시스템에 적용하고 모의실험을 통하여 기존의 OFDM 시스템, 기존의 채널 예측방식과의 성능을 MSE(mean square error), 비트오율(bit error rate : BER) 및 채널용량을 바탕으로 비교한다.

장대화물열차의 분산제어 제동 시 연결기에 발생하는 충격력 해석 및 분석 (Analysis and Evaluation of the Distributed Control Braking System of Long Freight Car Brakes)

  • 조병진;이정준;심재석;구정서;문형석
    • 한국기계가공학회지
    • /
    • 제18권2호
    • /
    • pp.65-72
    • /
    • 2019
  • In long freight trains, there is a brake time delay in neighboring freight cars, which causes damage and fractures in the couplers, especially at their knuckle. A problem in the couplers of the cars can cause derailment and damages of human life and property. In this study, maximum forces on the couplers are studied when a long freight car brakes with the brake delay time and coupler gap. We make a dynamic model of 50 freight cars and couplers, applying contact between the couplers and a characteristic curve to express the force and displacement of the buffers using SIMPACK, which is a multi-body dynamics program. We use EN 14531-2, which is a standard of freight car brakes, to verify the dynamic model. Then, we compare the analyzed impact force with the coupler knuckle standard after applying the two carriages of a locomotive in the model based on the dispersed double head control system. The result shows that all coupler gap conditions satisfy the infinite lifetime of the material when the brake delay time is 0.1 second.

건설공사 공기지연 영향분석을 통한 책임일수 산정체계 구축방안 (Estimating System for Responsible Days of Schedule Delay for Construction Projects through Time Impact Analysis)

  • 강인석;권중희
    • 대한토목학회논문집
    • /
    • 제28권5D호
    • /
    • pp.685-694
    • /
    • 2008
  • 최근의 건설공사는 복잡한 공정으로 이루어진 대형공사가 점차 증가되고 있다. 이에 따라 클레임 발생 빈도가 증가하고 있으며 이 중에서 공기지연을 사유로 한 클레임은 가장 많은 비중을 차지하고 있다. 이를 해결하기 위하여 공기지연사유를 분석하여 책임일수를 산정하는 기법들이 국내외에서 다양하게 연구되고 있으며, 복잡한 지연 분석과정을 자동화하여 책임일수 산정결과를 손쉽게 도출할 수 있는 시스템 개발도 요구되고 있다. 본 연구에서는 신뢰성이 있는 시간경과에 따른 분석방법을 기반으로 결과론적 분석방법과 단축일수를 고려한 방법론을 도출하였다. 이를 바탕으로 책임일수 산정 시스템을 구축하고 사례 데이터를 적용하여 실제 분석정보와 비교함으로써 활용성을 검증하였다.

정기용선계약에서 반선지연에 의한 선주의 상실수익과 손해배상청구 (Shipowner's Lost Profit and Its Claim resulted from Delay in Redelivery under Time Charter)

  • 한낙현;정준식
    • 한국항만경제학회지
    • /
    • 제23권3호
    • /
    • pp.29-51
    • /
    • 2007
  • Achilleas호 사건은 정기용선계약에서 용선자의 반선지연에 의한 선주의 상실수익과 그 손해배상청구와 관련된 사안이다. 이 사건에서 중재판정부는 정기용선계약상의 반선지연이, (1) 다음의 계약에 대한 지연, (2) 드라이독에 대한 지연, (3) 본선의 매매에 대한 지연 등을 초래할 수 있다고 말하고, 이들이 반선지연에 대한 위험이라는 것을 해운업에 종사하는 자에게는 이미 인식되고 있으며, 또 시장이 항상 변동한다는 것도 알려져 있는 사실이라는 것을 인정하였다. 그리고 손해의 범위가 예상한 것보다 컸다는 사실은 손해배상청구상에 문제가 되지 않으며, 선주가 주장하는 손해의 종류가 추가사항의 체결 시에 당사자에 의한 계약위반으로부터 발생한 것이기 때문에 선주의 주요한 청구는 '통상손해'에 해당한다고 하여 중재인 다수결로 이것을 인정하였다. 이것에 비해 용선자는 지금까지 반선지연에 대해 상실수익이 인정된 선례는 없기 때문에 일반적으로 알려진 손해배상액의 산정기준은 동 원칙의 '통상손해'에 기초하여 반선해야 할 일자로부터 실제로 반선된 일자까지의 시장용선료와 계약용선료와의 차액을 근거로 해야 한다는 것이다. 따라서 상실수익이 손해배상액으로서 인정되기 위해서는 동 원칙의 '특별손해'를 근거로 용선자가 계약체결 시에 스케줄대로 반선하는 것이 중요하다는 취지의 통지를 받고 반선지연에 의한 손해에 대해 책임을 진다는 것을 인식하고 있었던 것이 필요하다고 주장하여 상소하였다. 본 연구에서는 정기용선계약에서 반선지연에 의한 선주의 상실수익과 그 손해배상청구와 관련된 지금까지의 여러 판례를 분석한 후, 특히 Achilleas호 사건 판결내용을 중심으로 그 함축된 의미를 고찰하는데 목적을 두고 있다.

  • PDF