• Title/Summary/Keyword: Defense project

Search Result 247, Processing Time 0.033 seconds

Analysis of defense procurement agency Study on the appropriate brokerage fee and effectiveness (군수품 무역대리점의 효과성과 적정 중개수수료에 관한 연구)

  • Jeong, Suk-Jae;Kim, Jun Han
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.7
    • /
    • pp.184-190
    • /
    • 2020
  • In this study, two analyses were conducted in relation to the defense procurement agency. The first was a questionnaire survey conducted by defense business personnel to quantitatively measure the effectiveness of the defense procurement agency's utilization. In the second, the appropriate standard for brokerage fees was developed, the actual work of the defense procurement agency in overseas sales was surveyed, and the brokerage profit of the general product was applied to the defense procurement agency's brokerage profit data. Using the defense procurement agency was 1.07 times more effective than not using it, and the appropriate brokerage fee varied according to the project size. For medium / small projects, 5.1 ~ 8.7% of the total project cost is an appropriate brokerage fee, compared to 1.2 ~ 1.8% for big-scale projects. The government's appropriate brokerage fee is not fixed, but is elastically applied according to the size of the total project cost, and it is appropriate to analyze the characteristics of the project and identify and adjust the required activity cost in advance.

A study on the Improvement Direction of Design Phase Entry Criteria Review for Naval Surface Ships & Onboard Weapon Systems R&D Project (함정 및 함정탑재 무기체계 연구개발사업의 설계단계 진입조건 검토 개선 방향)

  • Kwang Yong Hwang;Dong Myung Seol;Bong Wan Choi
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.19 no.1
    • /
    • pp.79-90
    • /
    • 2023
  • In principle, R&D of general weapons systems are led by companies or government-funded organizations. In terms of project execution, the defense R&D planning system was reorganized to conduct SE-based project management by integrating the naval ship project execution procedure into the general weapon system R&D procedure. The development progress was confirmed according to the guide for SE application of DAPA, and a technical review meeting was proposed to enter into the each next phase in the R&D process. This paper focuses on improvement for technical review in terms of technical management based on system engineering for R&D mounted weapon systems and the naval surface ship project in preliminary design and detailed design. So, the improvement direction for reviewing the entry criteria for the R&D weapons systems of the naval ship and mounted weapons is proposed.

A Study on Cost Risk Estimation applying Joint Cost-Schedule Probability Distribution Model (비용과 일정의 결합확률 분포를 적용한 위험비용추정에 관한 연구)

  • Kim, Dong-Kyu;Kang, Sung-Jin;Han, Gyu-Sik
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.5
    • /
    • pp.850-858
    • /
    • 2011
  • The risk analysis plays an important role in weapon system acquisition project due to uncertainties in the acquisition process. But in domestic, studies on risk analysis are insufficient and risk cost is not included in acquisition budget in policy. Therefore, in this study, we suggest a method that measures risk or success probability of project using the stochastic model. In particular, in order to calculate the success probability, we apply the joint probability distribution model of cost and schedule that are critical factors influencing the project risk. And also we verify the applicability of this model in Korean defence industry environment through case studies.

A Study on the Improvements of Planning Issues for Korean Military Hospitals (군병원건축의 시설개선을 위한 실태조사 및 개선방향에 관한 연구)

  • Choi, Kwangseok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.17 no.3
    • /
    • pp.7-16
    • /
    • 2011
  • This study is a part of the architectural planning to meet the military healthcare development project according to the Korea national defense reform 2020. At this time, it is intended to identify the overall issues and to set the improvement directions of military hospital planning. Literature reviews, such as military healthcare development project, Korea national defense reform 2020, etc., and case studies for the advanced foreign military hospitals and several Korean private hospitals is analyzed. And also, field surveys, such as questionnaire collections for patients and workers, interviews with surgeons and department officials, and observation survey were conducted in order to be realistic improvement suggestions for military hospital planning issues.

Research on RAM-C-based Cost Estimation Methods for the Supply of Military Depot Maintenance PBL Project (군직 창정비 수리부속 보급 PBL 사업을 위한 RAM-C 기반 비용 예측 방안 연구)

  • Junho Park;Chie Hoon Song
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.5
    • /
    • pp.855-866
    • /
    • 2023
  • With the rapid advancement and sophistication of defense weapon systems, the government, military, and the defense industry have conducted various innovative attempts to improve the efficiency of post-logistics support(PLS). The Ministry of Defense has mandated RAM-C(Reliability, Availability, and Maintainability-Cost) analysis as a requirement according to revised Total Life Cycle System Management Code of Practice in May 2022. Especially, for the project budget forecast of new PBL(Performance Based Logistics) business contacts, RAM-C is recognized as an obligatory factor. However, relevant entities have not officially provided guidelines or manuals for RAM-C analysis, and each defense contractor conducts RAM-C analysis with different standards and methods to win PBL-related business contract. Hence, this study aims to contribute to the generalization of the analysis procedure by presenting a cost analysis case based on RAM-C for the supply of military depot maintenance PBL project. This study presents formulas and procedures to determine requirements of military depot maintenance PBL project for repair parts supply. Moreover, a sensitivity analysis was conducted to find the optimal cost/utilization ratio. During the process, a correlation was found between supply delay and total cost of ownership as well as between cost variability and utilization rate. The analysis results are expected to provide an important basis for the conceptualization of the cost analysis for the supply of military depot maintenance PBL project and are capable of proposing the optimal utilization rate in relation to cost.

A Case Study of SE and EVMS Techniques Application on Surion Helicopter R&D Program (수리온헬기 개발사업에서 시스템 엔지니어링 및 사업성과관리 기법 적용 사례연구)

  • Byun, Hyung Kyun;Lee, Sang Woo
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.1
    • /
    • pp.51-62
    • /
    • 2012
  • The System Engineering(SE) and the Earned Value Management System(EVMS), as parts of the scientific project management methodology, have been applied to Surion Helicopter R&D Program. The concept and application process of SE methodology, requirements management and applications output by DOORS program are described in this study. The concept and application process of EVMS, analysis results of schedule/cost variance for Surion RF equipment are also discussed in this study. Though the Surion R&D program is still on-going, it is found that the measures of effectiveness of SE and EVMS applications are verified.

Application of Systems Engineering in SURION R&D Project (수리온 체계개발에서의 시스템엔지니어링 적용사례)

  • Kim, Jin Hoon;Rhee, Dong Wook
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.1
    • /
    • pp.81-86
    • /
    • 2014
  • Systems Engineering application focused on requirement definition and management for SURION System Development Project is described in this paper. To perform the development process effectively based on systems engineering processes; Requirements Definition, Design Review, Configuration Management, Quality Assurance, Data Management, are applied in this project. In this processes, the Stakeholder's Requirements are transferred to Specifications verified with design reviews, prototyping inspections, and integration tests. All engineering data, especially verification plan & results are recorded, and traced to each requirements of system specification in Surion database. Therefore, it could be assured that all requirements of specification are evaluated and verified successfully in Surion Project.

Methodology for Establishment of Operational Concept for Speed-Up of Defense Robot and Improvement Direction of the Defense Acquisition System (국방로봇 신속 전력화를 위한 운용개념 수립 방법론 및 획득체계 개선방향)

  • Eom, Hongseob
    • The Journal of Korea Robotics Society
    • /
    • v.13 no.3
    • /
    • pp.182-189
    • /
    • 2018
  • The purpose of this paper is to suggest the methodology for the establishment of operational concept for speed-up of defense robot and improvement direction of the defense acquisition system for the defense robot. In order to achieve this goal, the current defense acquisition system was analyzed into long-term planning, mid-term programming, and project execution stages. And I suggest the methodology for the establishment of operational concept for speed-up of defense robot and direction of development of the defense robot acquisition system considering the characteristics of the robot in terms of core technologies of robot, robot ecosystem and effectiveness-based-robot-design, respectively. Based on the methodology for establishment of the operational concept of defense robot and development direction of the defense acquisition system presented in this study, it will be possible to design efficiently the defense robot in the future.