• 제목/요약/키워드: Decommissioning project

검색결과 37건 처리시간 0.021초

Development of a multi criteria decision analysis framework for the assessment of integrated waste management options for irradiated graphite

  • Abrahamsen-Mills, Liam;Wareing, Alan;Fowler, Linda;Jarvis, Richard;Norris, Simon;Banford, Anthony
    • Nuclear Engineering and Technology
    • /
    • 제53권4호
    • /
    • pp.1224-1235
    • /
    • 2021
  • An integrated waste management approach for irradiated graphite was developed during the European Commission project 'Treatment and Disposal of Irradiated Graphite and other Carbonaceous Waste'. This included the identification of potential options for the management of irradiated graphite, taking account of storage, retrieval, treatment and disposal methods. This paper describes how these options can be assessed using multi-criteria decision analysis (MCDA) for a case study relating to a generic power reactor. Criteria have been defined to account for safety, environmental, economic and socio-political factors, including radiological impact, resource usage, economic costs and risks. The impact of each option against each criterion has been assessed using data from the project and the wider literature. A linear additive approach has been used to convert the calculated impacts to scores. To account for the relative importance of the criteria, example weightings were allocated. This application has shown that MCDA approaches can be used to support complex decisions regarding irradiated graphite management, accounting for a wide range of criteria. Use of this approach by individual countries or organisations will need to account for the specific options, scores, weightings and constraints that apply, based on their national strategies, regulatory requirements and public acceptability.

연구로 2호기 동위원소생산시설 해체활동 평가 (Evaluation on the Dismantling Activities of the KRR-2 Radioisotope Production Facilities)

  • 박승국;천은영;박진호
    • 한국방사성폐기물학회:학술대회논문집
    • /
    • 한국방사성폐기물학회 2003년도 가을 학술논문집
    • /
    • pp.671-675
    • /
    • 2003
  • 연구로 1,2호기 해체 사업이 본격적으로 착수하게 됨에 따라 2001년 8월부터 2002년 12월까지 연구로 2호기 부속시설인 동위원소 생산시설을 제염 및 해체하였다. 이 시설은 동위원소 생산용 콘크리트 핫셀, 납 핫셀 및 실험실로 구성되어 있다. 제염ㆍ해체의 대상물은 흄후드, 실험대, 씽크 및 오염된 내부 시설물이다. 안전한 해체 활동을 위해서 각종 지침서 및 절차서가 수립되었다. 해체 활동을 위해 총 20,933 man-hour의 인력이 소요되었고, 드릴링 머신 등 여러 장비가 투입되었다. 실험실에서의 최대 오염도는 유리성 오염도가 $\beta$ : 9.24 Bq/$\textrm{cm}^2$이였고, 고착성 오염도는 350,000 cpm이였다. 해체폐기물은 콘크리트류, 목재류 및 철재류 등으로 총 62.146 Ton이고, 작업자들의 피폭량은 0.33 mam-mSv로 나타났다.

  • PDF

연구로 안전 해체를 위한 스케쥴링 최적화 (Scheduling Optimization for Safety Decommissioning of Research Reactor)

  • 김태성;박희성;이종환;장성호;김상호
    • 대한안전경영과학회지
    • /
    • 제8권3호
    • /
    • pp.67-75
    • /
    • 2006
  • Scheduling of dismantling old research reactor need to consider time, cost and safety for the worker. The biggest issue when dismantling facility for research reactor is safety for the worker and cost. Large portion of a budget is spending for the labor cost. To save labor cost for the worker, reducing a lead time is inevitable. Several algorithms applied to reduce read time, and safety considered as the most important factor for this project. This research presents three different dismantling scheduling scenarios. Best scenario shows the specific scheduling for worker and machine, so that it could save time and cost.

연구로 2호기 방사화 수조 콘크리트의 재고량 평가에 관한 연구 (A Study on the Inventory Estimation for the Activated Bioshield Concrete of KRR-2)

  • 홍상범;서범경;조동건;정경환;문제권
    • Journal of Radiation Protection and Research
    • /
    • 제37권4호
    • /
    • pp.202-207
    • /
    • 2012
  • 방사능재고량 평가는 해체과정에서 요구되는 계획 수립, 비용 평가, 위해도 평가, 폐기물관리 및 잔류방사능 조사 등에 중요한 영향을 준다. 연구로 2호기 해체사업은 2009년 완료하였고, 해체과정에서 많은 양의 방사화 콘크리트가 발생되었다. 연구로 수조 콘크리트는 연구로 운영과정에서 발생된 중성자와 상호작용에 의해 콘크리트 내 극미량으로 존재하는 불순물이 방사화되어 다양한 핵종이($^3H$, $^{14}C$, $^{55}Fe$, $^{60}Co$ $^{63}Ni$, $^{134}Cs$, $^{152}Eu$$^{154}Eu$) 검출되었다. 본 논문에서는 연구로 방사화 콘크리트에 대한 핵종 재고량을 계산하기 위해 MCNP5, ORIGEN2.1를 조합하여 평가하였고, 계산 결과는 측정된 결과와 비교평가를 수행하였다. 연구로 2호기 수조 콘크리트의 경우 연구로 운전정지 후 12년 동안 안전격리 기간을 거쳐 해체가 착수되었으며, 해체시점에서 $^3H$, $^{55}Fe$, $^{60}Co$$^{152}Eu$ 방사능이 전체방사능의 99.8%를 차지하였다. 운전기간 및 냉각기간에 따른 방사화 재고량의 영향을 분석하였다.

Evaluation of system design modifications for full system decontamination of Kori Unit 1

  • Kim, HakSoo;Kim, JeongJu;Kim, ChoRong
    • Nuclear Engineering and Technology
    • /
    • 제54권10호
    • /
    • pp.3949-3956
    • /
    • 2022
  • Kori Unit 1 is planning a system decontamination project to reduce radiation exposure of decommissioning workers, prevent the spread of contamination and down-grade the level of classification of radioactive waste. The system decontamination range for Kori Unit 1 will be the entire primary system, including RCS, CVCS and RHRS. Some system design modifications are required for the system decontamination operation. In this paper, major system design modifications were evaluated based on the conditions that system restoration is needed after completion of system decontamination. The major system design modifications are CIDF connection location to system, system decontamination operating pressure control, RCP seal water injection and formation of letdown flow. It was evaluated that there was no negative effect on the system due to the system design modifications. However, as the RCP seal water is injected into the system in the oxidation process, the concentration of the oxidizing agent is diluted. Therefore, the oxidizing agent injection and system decontamination operation procedures should be developed to address the dilution effect of the oxidizing agent. The system design modifications dealt in this paper will be finally confirmed through on-site investigation in the future, and if necessary, the system design modifications will be re-evaluated.

건설공사 공정별 건설폐기물 발생량 비교 및 폐기물 발생 원단위 산정에 관한 연구 (Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit)

  • 송태협;성진욱
    • 한국건설순환자원학회논문집
    • /
    • 제5권4호
    • /
    • pp.427-434
    • /
    • 2017
  • 건설폐기물의 발생은 해체단계와 신축단계로 구분할 수 있으며 대부분의 폐기물은 해체단계에서 발생하고 있다. 그러나 최근 국내 신축 건설공사가 연간 150조 규모로 확대됨에 따라 신축공사가 급격하게 증가하고 있다. 특히 건설폐기물 배출이 많은 건축공사의 규모가 100조를 초과함에 따라 신축현장에서의 건설폐기물 발생량에 대한 관리가 요구되고 있다. 신축현장은 해체공사 현장과 달리 발생된 폐기물을 성상별로 분리하여 배출이 가능하며, 상대적으로 이물질 함량이 적게 발생한다. 본 연구에서는 신축현장의 건설폐기물 성상별 발생량을 조사하고, 이를 바탕으로 건설폐기물 발생 원단위를 산정하고자 하였다. 또한 기존 발생 원단위가 콘크리트와 혼합폐기물 중심으로 되어 있어 합성수지, 폐목재, 폐보드류를 추가적인 항목으로 설정하여 원단위 설정을 하였다. 원단위 조사는 총 공사 기간별 발생하는 성상별 폐기물 조사를 실시하였다. 조사결과 신축건설현장은 초반 30%까지와 70% 이후의 공정에서 대부분의 폐기물이 배출되는 것으로 보사되었으며, 혼합건설폐기물의 비율이 45%로 높게 나타났다. 원단위 분석결과 본 연구에서 산출한 결과는 기존의 표준 품셈에 비하여 약 1.9배의 폐기물이 배출되는 것으로 나타났다.

계통 내 침적된 산화막 제거를 위한 과망간산/옥살산 기반의 화학제염 공정연구 (Study on Chemical Decontamination Process Based on Permanganic Acid-Oxalic Acid to Remove Oxide Layer Deposited in Primary System of Nuclear Power Plant)

  • 김초롱;김학수
    • 방사성폐기물학회지
    • /
    • 제17권1호
    • /
    • pp.15-28
    • /
    • 2019
  • 고리 1호기는 원전해체 계획에 따라 영구정지 이후 가능한 한 빠른 시일 내에 원자로냉각재계통의 화학제염을 수행할 계획으로, 계통제염 기술 확보를 위해 한수원에서는 2014년부터 '원전 해체설계를 위한 냉각재계통 및 기기제염 상용기술개발' 연구과제를 통해 화학제염기술을 개발하고 있다. 본 연구를 위해 Lab. 규모 계통제염 공정장치를 제작하였으며, 계통제염 대상의 주요재료인 STS304, 316, 410, Alloy600, SA508을 사용하여 화학제염 공정실험을 수행하였다. 화학제염 공정실험의 목적은 산화-환원공정의 최적시간, 최적제염제 및 공정횟수를 도출하기 위함이다. 화학제염 공정실험은 과망간산-옥살산 기반의 단위공정 및 연속공정 실험, 과망간산+질산-옥살산 기반의 연속공정 실험으로 나누어 수행하였다. 그 결과 단위공정실험을 통해 최적공정 시간인 산화공정 5시간, 환원공정 4시간을 도출하였으며, 연속공정실험을 통해 최적제염제와 공정횟수를 도출하였다. 최적제염제는 산화제의 경우 $200mg{\cdot}L^{-1}$ 과망간산 + $200mg{\cdot}L^{-1}$ 질산이고, 환원제는 $2000mg{\cdot}L^{-1}$ 옥살산이며, 공정횟수는 STS304와 SA508의 경우 2 cycle, Alloy600의 경우 3 cycle 이상 수행하는 것이 적절할 것으로 평가되었다.