• Title/Summary/Keyword: Decommissioning of nuclear power plants

Search Result 81, Processing Time 0.029 seconds

A Study on Annual Release Objectives and Annual Release Limits of Gaseous Effluents During Decommissioning of Nuclear Power Plants (원전 해체 시 기체상 유출물의 연간 방출관리치 및 방출한도치에 관한 연구)

  • Lee, Seung-Hee;Hwang, Won-Tae;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.17 no.3
    • /
    • pp.299-311
    • /
    • 2019
  • Decommissioning is a critical issue in Korea. Although compared with the operation of nuclear power plants the release of radioactive materials during decommissioning is not expected to be significant, residents should always be protected from radiation exposure. To manage this effectively, Annual Release Objectives (ARO) and Annual Release Limits (ARL) were derived from dose standards in the NSSC Notice and dose limit for the public. Based on meteorological data for the three years from 2008 to 2010 in the Shin Kori nuclear power plant site, atmospheric dispersion and ground deposition factors of gaseous effluent were evaluated using the XOQDOQ computer code. The exposure dose was evaluated using the ENDOS-G computer code. Because of differences in radiological sensitivity according to age groups, the results of Annual Release Objectives (ARO) and Annual Release Limits (ARL) showed significant differences depending on the radionuclides. The evaluation methodology of this study will provide meaningful information for radioactive effluent management for decommissioning of nuclear power plants.

Magnesium potassium phosphate cements to immobilize radioactive concrete wastes generated by decommissioning of nuclear power plants

  • Pyo, Jae-Young;Um, Wooyong;Heo, Jong
    • Nuclear Engineering and Technology
    • /
    • v.53 no.7
    • /
    • pp.2261-2267
    • /
    • 2021
  • This paper evaluates the efficacy of magnesium potassium phosphate cements (MKPCs) as waste forms for the solidification of radioactive concrete powder wastes produced by the decommissioning of nuclear power plants. MKPC specimens that contained up to 50 wt% of simulated concrete powder wastes (SCPWs) were evaluated. We measured the porosity and compressive strength of the MKPC specimens, observing them using scanning electron microscopy and X-ray diffraction. The addition of SCPWs reduced the porosity and increased the compressive strength of the MKPC specimens. Struvite-K crystals were well-synthesized, and no additional crystal phase was formed. After thermal cycling and after immersion, MKPC specimens with 50 wt% SCPWs satisfied the waste-acceptance criteria (WAC) for compressive strength. Semi-dynamic leaching tests were performed using the ANS 16.1 method; the leachability indices of Cs, Co, and Sr were 11.45, 17.63, and 15.66, respectively, which also satisfy the WAC. Thus, MKPCs can provide stable matrices to immobilize radioactive concrete wastes generated by the decommissioning of nuclear power plants.

Calculation of preliminary site-specific DCGLs for nuclear power plant decommissioning using hybrid scenarios

  • Seo, Hyung-Woo;Sohn, Wook
    • Nuclear Engineering and Technology
    • /
    • v.51 no.4
    • /
    • pp.1098-1108
    • /
    • 2019
  • Korea's first commercial nuclear power plant at Kori site was permanently shut down in 2017 and is currently in transition stage. Preparatory activities for decommissioning such as historical site assessment, characterization, and dismantling design are being actively carried out for successful D&D (Dismantling and Decontamination) at Kori site. The ultimate goal of decommissioning will be to ensure the safety of workers and residents that may arise during the decommissioning of nuclear facilities and, thereby finally returning the site to its original status in accordance with the release criteria. Upon completion of decommissioning, the resident's safety at a site released will be assessed from the evaluation of dose caused by radionuclides expected to be present or detected at the site. Although the U.S. commercial nuclear power plants with decommissioning experience use different site release criteria, most of them are 0.25 mSv/y. In Korea, both the unrestricted and restricted release criteria have been set to 0.1 mSv/y by the Nuclear Safety and Security Commission. However, since the dose is difficult to measure, measurable concentration guideline levels for residual radionuclides that result in dose equivalent to the site release criteria should be derived. For this derivation, site reuse scenario, selection of potential radionuclides, and systematic methodology should be developed in planning stage of Kori site decommissioning. In this paper, for calculation of a preliminary site-specific Derived Concentration Guideline Levels (DCGLs) for the Nuclear Power Plant site, a novel approach has been developed which can fully reflect practical reuse plans of the Kori site by taking into account multiple site reuse scenarios sequentially, thereby striking a remarkable distinction with conventional approaches which considers only a single site scenario.

Development of an information reference system using reconstruction models of nuclear power plants

  • Harazono, Yuki;Kimura, Taro;Ishii, Hirotake;Shimoda, Hiroshi;Kouda, Yuya
    • Nuclear Engineering and Technology
    • /
    • v.50 no.4
    • /
    • pp.606-612
    • /
    • 2018
  • Many nuclear power plants in Japan are approaching the end of their planned operational life spans. They must be decommissioned safely in the near future. Using augmented reality (AR), workers can intuitively understand information related to decommissioning work. Three-dimensional (work-site) reconstruction models of dismantling fields are useful for workers to observe the conditions of dismantling field situations without visiting the actual fields. This study, based on AR and work-site reconstruction models, developed and evaluated an information reference system. The evaluation consists of questionnaires and interview surveys administered to six nuclear power plant workers who used this system, along with a scenario. Results highlight the possibility of reducing time and mitigating mistakes in dismantling fields. Results also show the ease of referring to information in dismantling fields. Nevertheless, it is apparently difficult for workers to build reconstruction models of dismantling fields independently.

UK Civil Nuclear Decommissioning, a Blueprint for Korea's Nuclear Decommissioning Future?: Part I - Nuclear Legacy, Strategies, and the NDA

  • Foster, Richard I.;Park, June Kyung;Lee, Keunyoung;Seo, Bum-Kyoung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.19 no.3
    • /
    • pp.387-419
    • /
    • 2021
  • The challenges facing companies and institutions surrounding civil nuclear decommissioning are diverse and many, none more so than those faced in the United Kingdom. The UK's Generation I nuclear power plants and early research facilities have left a 'Nuclear Legacy' which is in urgent need of management and clean-up. Sellafield is quite possibly the most ill-famed nuclear site in the UK. This complex and challenging site houses much of what is left from the early days of nuclear research in the UK, including early nuclear reactors (Windscale Piles, Calder Hall, and the Windscale Advanced Gas Cooled Reactor) and the UK's early nuclear weapons programme. Such a legacy now requires careful management and planning to safely deal with it. This task falls on the shoulders of the Nuclear Decommissioning Authority (NDA). Through a mix of prompt and delayed decommissioning strategies, key developments in R&D, and the implementation of site licenced companies to enact decommissioning activities, the NDA aims to safety, and in a timely manner, deal with the UK's nuclear legacy. Such approaches have the potential to influence and shape other such approaches to nuclear decommissioning activities globally, including in Korea.

Fire Protection Regulations for Ensuring Fire Safety during Decommissioning Nuclear Power Plants in Korea (해체원전 화재안전 확보를 위한 화재방호 규정 고찰)

  • Kim, Jung-Wun;Park, Chan-Geun
    • Fire Science and Engineering
    • /
    • v.34 no.3
    • /
    • pp.134-140
    • /
    • 2020
  • Nuclear power plants (NPPs) in Korea are required to be maintained using a defense in-depth approach to prevent leakage of radioactive substances outside the plant and allow safe shutdown in the event of a fire. Periodic testing must be conducted to ensure that the fire protection facilities perform as required by the laws for various nuclear reactor types. In June 2017, for the first time in Korea, a nuclear plant, Kori Unit 1, was permanently shut down. It was prepared for decommissioning in accordance with the fire protection regulations imposed by the regulatory body. However, a standard protocol is necessary for systematically establishing the fire protection program for decommissioning of NPPs in the future. Therefore, the nuclear legal systems of countries with many operating nuclear power plants, such as the United States, Japan, Canada, and various European countries, were reviewed and guidelines for establishing a fire protection program for decommissioning NPPs was suggested; the fire protection requirements stated by Reg Guide 1.191 (Decommissioning fire protection program for NPPs during decommissioning and permanent shutdown) were used as a model. Suggestions for establishing legal regulations to optimize fire protection programs and secure basic technology for decommissioning NPPs were also made.

Development of Operational Technology and Integrated Measurement Information Management System for the Radioactivity Measurement Device (방사능 측정장치 운영 기술 및 측정정보 통합관리 시스템 개발)

  • Dong-Sik Jin;Kyeong-Ryeong Kim;Jae-Geun Lee
    • Journal of radiological science and technology
    • /
    • v.47 no.3
    • /
    • pp.183-195
    • /
    • 2024
  • Additional functional upgrades to the large-area compton camera (LACC) measurement device that can provide characteristics evaluation information (nuclear species and radioactivity) and two-dimensional or three-dimensional distribution imaging information of radioactive materials existing in surface or internal of concrete structures are required in terms of work stability and efficiency in order to apply to actual decommissioning sites such as nuclear power plants or medical cyclotron facilities by using this measurement device. To this purpose, the technology that allows radiation workers to intuitively and visually check the distribution of radioactive materials in advance by matching the two-dimensional distribution imaging information of radioactive materials obtained through the LACC measurement device and visual imaging of the measurement zone (10 m × 5 m) was developed. In addition, the separate system that can automatically adjust the position (height) in units of the measurement area size (0.7 m × 0.3 m × 0.8 m) of the LACC measurement device was developed and the integrated management system for characteristics evaluation information and two-dimensional or three-dimensional distribution imaging information obtained per unit of measurement for radioactive materials was developed. These functional upgrades related to LACC measurement device can improve work efficiency and safety when measuring radioactivity of concrete structures and enable the establishment of appropriate decommissioning strategies using radioactivity measurement information for decommissioning nuclear power plants or medical cyclotron facilities.