• 제목/요약/키워드: Decision-making Hierarchy

검색결과 388건 처리시간 0.027초

A case study on the selection process of cutoff wall for ground-water using VE/LCC analysis (VE/LCC 기법을 활용한 차수공법 선정사례 연구)

  • Cho Yong-Wan;Chang Jun-Ho;Kim Jin-Man;Ha Jae-In
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.279-291
    • /
    • 2006
  • This study shows decision-making process for selection of cutoff wall on a wastewater treatment project. There are 10 different cut-off wall methods So, we examine the site to gather information for find appropriate methods. After using that information, 10 cutoff wall methods are reviewed for analysis. Through brainstorming, four alternatives are selected for design VE item. Following the standard VE process, we established performance criteria and evaluated function score(F) using questionnaire. The questionnaires, brainstorming and AHP method for weighting on performance criteria and evaluate function score increased the reliability of this selection process. Water Jet method, one of four methods, has the best function score(F=92.71) and the lease construction cost(as cost index 1,000). The value score also highest as 92.7, so we select the method. The result is value innovation type In addition, the authors try to calculate the environmental burden in selection process using LCA. We cannot conduct the full LCA as defined ISO, so perform Simple LCA In LCA result, the cut-off grouting has the least environmental burden as index 9.09E+01 and Water Jet method has following as the second. To selection best method to specific area and purpose, design VE/LCG process used as useful tool and it is needed to develop integrated method that evaluate VEILCC and LCA as one-set process.

  • PDF

Evaluation of Inland Inundation Risk in Urban Area using Fuzzy AHP (Fuzzy AHP 기법을 이용한 도시지역의 내수침수위험도 평가)

  • Shin, Ji Yae;Park, Yei Jun;Kim, Tae-Woong
    • Journal of Korea Water Resources Association
    • /
    • 제47권9호
    • /
    • pp.789-799
    • /
    • 2014
  • This study presented how to evaluate the inland inundation risk considering the characteristics of inland flood. Fuzzy AHP (Analytic Hierarchy Process), which can deal with the uncertainty or ambiguousness of the decision-making process, was used to estimate the inundation risk. The criteria used for inland inundation risk include the physical index, social index and inland flood. Each index contains three detailed indicators then total nine indicators were employed in this study. The inundation risk evaluation was carried out for each node (manhole) within the drainage system, not to the administrative extent, which enabled us to point out nodes with high risk. The proposed Fuzzy AHP was applied to Geoje district in Busan. The results indicated that the junction of Oncheoncheon and Geojecheon has high risk which is consistent with the fact that this junction has already experienced floods in the past. The proposed method can be used for evaluating inland inundation risk and preparing flood prevention plans in inland flood-prone urban areas.

VTS Task Assessment using AHP (AHP를 활용한 VTS업무 중요도 평가)

  • Kim, Joo-Sung;Jung, Cho-Young;Kim, Kwang-il
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 한국항해항만학회 2018년도 추계학술대회
    • /
    • pp.261-262
    • /
    • 2018
  • The tasks of Vessel Traffic Services are classified according to the content of the information provided. Since the establishment of the first Vessel Traffic Service center in 1993 at Phohang harbour, it has been steadily developed and its work domain and scope have been expanded. In this paper, the importance and workload of Vessel Traffic Service operators were analyzed according to classification of the tasks. In order to measure the importance and workload, questionnaires were conducted for the operators nationwide, and conclusions were drawn using the multi-criteria decision making process. The relationship between the importance of tasks and the workload might be used as the weights for setting the service areas in the future. Furthermore, it is expected to be used as the data of changable sector operation based on the relationship between importance and workload.

  • PDF

HABs Research Project Management Model (적조연구프로젝트 관리모형에 관한 연구)

  • 어윤양;김창완;이현규
    • The Journal of Fisheries Business Administration
    • /
    • 제34권2호
    • /
    • pp.165-183
    • /
    • 2003
  • The effect of red tide on the marine ecological system is so severe that many researches on the diverse subjects related to it have been conducted. Notwithstanding the enormous efforts and inputs the results of the past researches show no clear ways to deal with the HAB problems. As many researches are being conducted, the efficient and appropriate research project management systems as one of the critical factors for successful research are also needed as well as the fund and the capabilities of the researchers. It is assumed that the development of the evaluation and management systems for red tide research projects is so important and critical to enhance the researches and to utilize efficiently the physical and human resources for research. In this respect this study aims to present the evaluation and management scheme for the red tide researches that can not only decide the priority of the research subjects and tell the desirable research directions, but also support to develop the useful managerial policies and guidelines for the policy maker. The main subjects dealt with in this study are as follows : the characteristics of the HAB researches, the basic attributes and criterion of the research evaluation systems, the structure and design of the evaluation systems, and the development of the managerial policies by the type of the evaluation system. The conceptual scheme developed in this study is expected to be applied to the related areas and can suggest to the policy makers so many implications for identifying and setting the proper policy objects and management techniques. This study has a couple of weak points. It suggests only the conceptual scheme but not the applications so that the researches focusing on the applications in practical perspectives are needed to follow.

  • PDF

Research on the Attributions of Digital Game Using AHP (AHP를 활용한 디지털 게임의 속성에 관한 연구)

  • Kwon, Yong-Man
    • Journal of Digital Convergence
    • /
    • 제14권7호
    • /
    • pp.431-437
    • /
    • 2016
  • Since the game is industrialized in the 1970s, efforts to study attributions throughout the definition of the game has been continued. This study analyzed the importance of 7 attributions including rule, goal, conflict, activity, decision-making, voluntary, art that were collectively organized by Katie Salen & Eric Zimmerman using AHP. For this, we analyzed the data after subjected to pair-wise comparison survey through the gaming industry experts, and the result was confirmed that match the analysis model comparing with the survey of game players. In this analysis of the importance, Goal(24%) is the greatest important in the seven factors mentioned above. Art(16%),Voluntary(15%), Rule(13%) followed after it. So, We can find out which attributes are considered important in the game development process through this Research.

Weight Evaluation of Risk Factors for Early Construction Stage (초기 건설공사 리스크인자의 중요도 산정)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • 제5권2호
    • /
    • pp.115-122
    • /
    • 2004
  • This study identifies various risk factors associated with activities of early construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The Common risks are identified and classified by considering various aspects of the early construction stage such as financial, political, constructional aspects, etc. The risks for Earth works and Foundation works are identified in detail by surveying technical specifications, relevant claim cases and interviewing with experts. These risks are classified based on the Wok Breakdown Structure(WBS) of the early construction stage. The WBS presented in this study classifies the works of early construction stage into four categories; excavation, sheeting works, foundation works, footing works. This study suggests a risk analysis method using fuzzy theory for construction projects. Construction risks are generally evaluated as vague linguistic value by subjective decision making. Fuzzy theory is a proper method to quantify vague conditions of construction activities. Therefore, this study utilizes fuzzy theory to analyse construction risks. The weight of risks is estimated by reflecting the interrelationship among risk factors from absolute weights obtained by fuzzy measure into the relative weights by Analytical Hierarchy Process(AHP). The interrelationship is estimated by Sugeno-fuzzy measure.

Knowledge Management in an Iranian Health organization: Investigation of Critical Success Factors

  • Hojabri, Roozbeh;Eftekhar, Farrokh;Sharifi, Moslem;Hatamian, Alireza
    • The Journal of Industrial Distribution & Business
    • /
    • 제5권4호
    • /
    • pp.31-42
    • /
    • 2014
  • Purpose - According to the applied studies knowledge, management implementation can improve organizational performance. The main objective of this study is to develop an understanding of critical success factors that enhance the successful implementation of knowledge management. Research design, data, and methodology - This study used Analytical Hierarchy Procedure (AHP), which is a multi-criteria decision making model that works on fuzzy logic. Using this method, researchers can find the proportion of success due to the contribution of the critical success factors (CSFs). Results - The results show that more than 70% of respondents indicate the possibility of success in knowledge management implementation. Further, the results show that top management support has the greatest relationship with the success of knowledge management implementation. This was followed by information technology, performance measurement, and culture, which had a high relation with knowledge management success. Process and activities have a moderate positive relation, while education and training has a low relation with success. Because of an inappropriate p-value, knowledge management strategies show no relation to the success of knowledge management in the Iranian health Industry. Conclusions - This study was conducted because of a critical issue in the Iranian health industry that indicated that a significant portion of the workforce would retire in 5 to 10 years. Most highly experienced and knowledge oriented employees would become eligible for retirement. Therefore, knowledge management is presented as a complete solution in the Iranian health sector.

Analysis of Waterfront Utilization Index Using Multi Criteria Decision Making (다기준의사결정을 이용한 친수공간 이용지수 분석)

  • Kim, Byeong-Chan;Kim, Man-Sik;Maeng, Bong-Jae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 한국수자원학회 2011년도 학술발표회
    • /
    • pp.195-195
    • /
    • 2011
  • 국가하천의 주변지역을 체계적이고 계획적으로 조성 이용하여 난개발을 방지하고 지속가능한 발전을 도모하며, 그에 따른 이익을 하천의 정비 및 관리 등에 활용함으로써 공공복리의 증진에 기여함을 목적으로 하는 친수구역활용에 관한 특별법이 곧 시행될 예정이다. 친수는 단순히 하천 보전과 상대되는 수변이용의 측면이 아니라 하천의 경관, 생태계, 물 등 전체적인 하천공간에서 이루어지는 인간의 활동과 심리적 만족감으로 해석할 수 있다. 이러한 친수활동 유형을 정립하기 위하여 전문가 및 실무자들의 도움으로 설문지를 작성하고, 조사하였다. 또한 평가 항목간의 중요도를 합리적으로 부여하고자 전문가 집단 활용을 통한 다기준의사결정 기법 중 계층분석과정 AHP(Analytic Hierarchy Process)와 이의 일반적인 형태인 ANP(Analytic Network Process) 기법을 이용하여 비교 분석하여 보았다. AHP는 의사결정의 목표 또는 평가기준이 다수이며 복합적인 경우, 다수의 속성들을 계층적으로 분류하여 각 속성의 중요도를 파악함으로써 최적 대안을 선정하는 기법으로 다수의 목표, 다수의 평가기준, 다수의 의사결정주체가 포함되어 있는 의사결정 문제를 계층화하여 해결한다. 그러나 의사결정 문제는 대부분 요소들 간의 수평적 상호작용과 수직종속성이 존재하기 때문에 단순히 계층적 구조만으로는 설명할 수 없는 경우가 있다. ANP는 AHP 분석을 확장한 개념으로 평가 요소가 계층구조를 가지고 있으면서 각 평가 요소간 네트워크 구조를 가지는 경우에 해당한다. 즉, 시스템 분석, 통합 및 조정을 위한 방법으로 요소들 간의 비선형 관계를 모델화하는 복잡한 의사결정에 적용이 가능하다. ANP는 AHP의 기본 공리인 독립성이 유지되지 않을 때도 적용할 수 있는 의사결정 방법이기 때문이다. AHP와 ANP 분석을 위해 평가기준은 하천특성, 생태환경특성, 인문환경특성, 경관, 유지관리 등으로 분류하였으며, 세부평가항목은 하천의 물리 생태학적 특성, 개발여건과 관련된 특성, 경관의 이용가치, 유지관리 용이성 등 20여 개로 나누었다. AHP와 ANP를 이용하여 친수공간 이용지수 가중치를 산정한 결과, 두 기법은 큰 차이를 보이지 않았다. 그러나 ANP를 이용하여 가중치를 결정하는 방법은 최종 결정의 공정성이나 신뢰성을 확보하는데 기여를 하는 것으로 나타났다.

  • PDF

A Study on the Ranking Strategy for the Product Improvement of the K Series Tank using AHP, Scoring Method, and TOPSIS (AHP와 평점법 및 TOPSIS를 활용한 K계열 전차 성능개량 우선순위에 대한 연구)

  • Na, Jae-Hyun;Park, Chan-Hyeon;Kim, Dong-Gil
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • 제16권5호
    • /
    • pp.899-908
    • /
    • 2021
  • Since the modern weapon system is composed of a complex system, it is quite difficult to derive the priority of performance improvement factors. In addition, research on the method for prioritizing quantitative performance improvement factors considering the opinions of stakeholders is insufficient. In this study, in order to quantitatively derive the priorities of performance improvement factors for K1 tanks and K2 tanks, a survey was conducted with experts with experience in tank development, and the preface data was analyzed using AHP, scoring method, and TOPSIS methods. As a result, priorities were quantitatively derived. The results of this study are expected to be used as decision-making indicators for stakeholders in the future weapon system development and performance improvement stage.

Investigation into the Effectiveness on Customized Remodeling - Focusing on apartment houses completed during remodeling - (맞춤형 리모델링에 대한 실효성 검증 연구 - 리모델링을 추진중, 완공한 공동주택을 중심으로 -)

  • Yoon, Hyang-Seung;Kim, Gi-Soo
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • 제34권7호
    • /
    • pp.3-12
    • /
    • 2018
  • The present remodeling makes almost no difference from rebuilding as all the building materials are removed remaining frame structure only. And, in case of vertical extension of building, higher construction cost and safety problem occur. The Ministry of Land, Transport and Maritime Affairs, therefore, recommends customized remodeling that can be made in light of the resident' needs such as parking lot, elevator, bathroom, and room for the alternative of remodeling of vertical extension of building. The purpose of this study is to present real data that can be referred to the constructor's decision making before starting the remodeling, by investigating and analyzing the weight and importance between evaluation factors for customized remodeling at the completed time of remodeling. Accordingly, the factors were divided into environmental factor, social factor, and economical factor, and the survey was performed for the residents living in remodeling houses. In addition, for the professionals, AHP (Analytic Hierarchy Process) has been carried out for the priority in the customized remodeling. For environmental factor, the level of importance made difference from that before remodeling, except parking level. For social factor, every item, including psychological satisfaction and community satisfaction, made difference. For economical factor, the recognition level of importance in rent made difference, except sale price of the factor for price satisfaction. In case of the factor for cost satisfaction, it was checked that construction cost and administration cost both could be considered important. As a result of AHP, the most importantly emphasized item was construction cost, and sale price, administration cost, residence structure, and parking lot were followed by priority in order. This study could contribute to reliably settle down customized remodeling by giving reasonable and substantial help from the analysis of the differences in the customized remodeling items before/after the remodeling.