• 제목/요약/키워드: Decision making support tool

검색결과 132건 처리시간 0.031초

Application of ecological interface design in nuclear power plant (NPP) operator support system

  • Anokhin, Alexey;Ivkin, Alexey;Dorokhovich, Sergey
    • Nuclear Engineering and Technology
    • /
    • 제50권4호
    • /
    • pp.619-626
    • /
    • 2018
  • Most publications confirm that an ecological interface is a very efficient tool to supporting operators in recognition of complex and unusual situations and in decision-making. The present article describes the experience of implementation of an ecological interface concept for visualization of material balance in a drum separator of RBMK-type NPPs. Functional analysis of the domain area was carried out and revealed main factors and contributors to the balance. The proposed ecological display was designed to facilitate execution of the most complicated cognitive operations, such as comparison, summarizing, prediction, etc. The experimental series carried out at NPPs demonstrated considerable reduction of operators' mental load, time of reaction, and error rate.

가상 기업을 위한 네트워크 기반 가상 생산 시스템에 관한 연구 (A Study on th Networked Virtual Manufacturing System for Virtual Enterprises)

  • 공상훈;한영근;이교일
    • 산업공학
    • /
    • 제13권4호
    • /
    • pp.639-645
    • /
    • 2000
  • Virtual manufacturing systems that perform production activities ahead of real production in virtual world can reduce time and cost to develop, design, plan, and manage new products. In this paper, a virtual manufacturing system is constructed as a tool to support decision making by using VRML and Java. The basic structure of the virtual manufacturing system and the operation models are also presented. The developed system helps any related persons to share design and manufacturing information, and to perform their tasks collaboratively through Internet. The other function of the system is to monitor operation status in real time.

  • PDF

타임스케줄을 이용한 임플란트 수술의 지연 개선 (Prevention of delay in implant services using time schedule)

  • 박지연
    • 대한치과의료관리학회지
    • /
    • 제10권1호
    • /
    • pp.1-8
    • /
    • 2022
  • This study introduces research on the quality of medical services, optimization of medical services, dental medical services, implant medical services, and time schedules, as well as the effective process of dental implant medical services, which is expensive and requires a long treatment period. For improvement, it is suggested to evaluate using a time schedule. In this method, a time schedule is prepared in which each step, starting from the patients appointment until the completion of the treatment process, is allotted a certain time. This schedule was finalized in consultation with the employees. When performing all implant operations, the starting time of each item was checked to evaluate the degree of compliance and to understand any reasons for delay in each step. After identifying the causes for delay at each step, suitable steps to rectify the drawbacks were developed, and an optimal plan for patient management was determined. Changes in waiting time and human resource utilization were shown as concrete data, suggesting that such a schedule is meaningful as a decision-making support tool.

A New Route Guidance Method Considering Pedestrian Level of Service using Multi-Criteria Decision Making Technique

  • Joo, Yong-Jin;Kim, Soo-Ho
    • Spatial Information Research
    • /
    • 제19권1호
    • /
    • pp.83-91
    • /
    • 2011
  • The route finding analysis is an essential geo-related decision support tool in a LBS(Location based Services) and previous researches related to route guidance have been mainly focused on route guidances for vehicles. However, due to the recent spread of personal computing devices such as PDA, PMP and smart phone, route guidance for pedestrians have been increasingly in demand. The pedestrian route guidance is different from vehicle route guidance because pedestrians are affected more surrounding environment than vehicles. Therefore, pedestrian path finding needs considerations of factors affecting walking. This paper aimed to extract factors affecting walking and charting the factors for application factors affecting walking to pedestrian path finding. In this paper, we found various factors about environment of road for pedestrian and extract the factors affecting walking. Factors affecting walking consist of 4 categories traffic, sidewalk, network, safety facility. We calculated weights about each factor using analytic hierarchy process (AHP). Based on weights we calculated scores about each factor's attribute. The weight is maximum score of factor. These scores of factor are used to optimal pedestrian path finding as path finding cost with distance, accessibility.

활동기준 경영기법에 의한 전사적 자원관리에 관한 연구 (Study on Enterprise Resources Planning by Activity Based Management Method)

  • 이장형
    • 경영과정보연구
    • /
    • 제2권
    • /
    • pp.209-235
    • /
    • 1998
  • Traditional cost system is distorted due to the using unit-based measure. It is being criticized that it do a poor job of attributing the expenses of support resources to the production and sales of individual product. Activity Based Cost System expend the range of second-stage cost assignment drivers beyond the traditional measures of labor and machine times, units produced, and material quantities to allow for drivers that measure the amount of batch-level, product-sustaining, and facility-sustaining activities performed. It is a resources consumption model of organization, not just a more complex cost accounting of cost allocation system. This paper proposes a enterprise resource planning by activity based management. To effective performance system for company that want to be setting competitive levels, the information systems must support a fast moving, rapidly changing. Activity based management is a process of accumulating and tracing cost and performance da to a firm's activities and providing feedback of actual results against the planned cost to initiate corrective action where required. Therefore this system provides a highly powerful decision-making tool. To construct this system, we need Enterprise Resource Planning System. Since ERP is designed around the idea that rapid change and a degree of unhandled change is normal, it allows driving the customer's rapidly needs much deeper through the business cycle.

  • PDF

DEVELOPMENT OF A WEB-BASED COST AND DURATION MANAGEMENT SYSTEM FOR MEGA-PROJECTS

  • Chang-Taek Hyun;Run-Zhi Jin;Myoung-Jin Son;Seung-Yoon Shin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.510-515
    • /
    • 2011
  • Urban renewal projects, in the form of mega-projects, are being actively implemented both nationally and internationally to revitalize inactive cities. These programs, however, are difficult to manage efficiently due to their need for a large budget over a long period of time and due to conflicts with stockholders. Moreover, existing cost and duration management systems are structured with emphasis on the design and construction stage of unit projects, thus limiting their application to long-term mega-projects that are integrated with various facilities. To solve these problems, this study developed a web-based system that can collectively manage the cost and duration of mega-projects at a program level. The unit modules included in the system--CBS organization, construction cost and duration prediction, and total cost and duration prediction--can support decision-making at the early stage of the program. Furthermore, the modules, which include contract management, execution management, change management, and program progress management, support the program operations for its successful accomplishment. The web-based cost and duration management system developed in this study is expected to be used as a valuable tool that supports the successful accomplishment of mega-projects through their efficient management throughout their life cycle.

  • PDF

확률론적 기법을 이용한 터널 지보시스템의 신뢰성 평가 (Reliability Assessment of Tunnel Support Systems Using a Probability-Based Method)

  • 박도현;박의섭;송원경;류동우
    • 터널과지하공간
    • /
    • 제20권1호
    • /
    • pp.39-48
    • /
    • 2010
  • 본 연구에서는 확률론적 기법을 토대로 터널 지보시스템의 신뢰성을 평가할 수 있는 프로그램을 개발하였다. 개발된 프로그램은 솔버로서 FLAC2D를 사용하며 수치해석과 확률론적 해석의 전 과정을 자동적으로 처리할 수 있다. 지반을 모델링한 수치해석시 상당한 계산시간이 소요되므로 시뮬레이션 기법을 적용하여 터널 지보시스템의 신뢰성을 확률론적으로 평가하는 것은 현실적으로 불가능하다. 따라서 본 연구에서는 샘플의 수를 시뮬레이션 기법에 비해 상당히 줄일 수 있어 확률론적 해석을 하는 데 효율적인 점추정법을 사용하였다. 본 연구에서 개발한 프로그램을 터널 프로젝트에 적용하여 결정론적 접근법에 의한 결과와 비교 분석하였다. 이로부터 확률론적 접근법은 파괴확률을 토대로 터널 지보시스템의 신뢰성을 정량적으로 평가할 수 있고 터널 지보설계시 의사결정의 도구로서 활용될 수 있다는 것을 확인하였다.

공공건설사업의 발주방식 선정 및 성과평가 모델 (Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects)

  • 유일한;김경래
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.41-47
    • /
    • 2007
  • 최적 발주방식을 선정하는 것은 해당 사업의 성공적 수행을 위한 것이며, 이는 곧 사업의 목표를 달성시키는 것이다. 또한 사업특성에 적합한 발주방식의 선정과 사업의 성과는 밀접한 연관성을 갖는다. 이러한 취지에서 재정경제부는 2007년 10월 국가계약법시행령 개정을 통해 "기술제안입찰", "설계공모${\cdot}$기술제안입찰"이라는 발주제도를 새로이 도입하였다. 다양해진 발주제도를 효율적으로 운영할 수 있도록 하기 위해 본 연구는 공공건설사업의 특성을 정량적, 정성적으로 평가하여 해당 사업에 가장 적합한 발주방식을 선정할 수 있도록 하는 발주방식 선정모델을 제시하였다. 그리고 발주방식 성과평가 모델을 함께 제시하여 발주방식 선정 및 운영의 결과를 후속 사업의 피드백 할 수 있도록 하였다. 이와 같은 표준적인 모델은 공공발주기관의 의사결정을 지원하는 도구로 활용될 수 있을 것이다.

  • PDF

지형정보시스템을 활용한 생태학적인 폐광지역 재개발 계획 및 관리 (A Strategic Plan and Management for Ecological Abandoned Mine Land (AML) Reuse Using GIS)

  • 이주영;한무영;양중석;최재영
    • 한국지하수토양환경학회지:지하수토양환경
    • /
    • 제13권5호
    • /
    • pp.1-7
    • /
    • 2008
  • 폐광지역은 경제적 측면에서 낙후된 지역이며, 무엇보다도 폐광개발로 인한 주변생태계 파괴는 우려할만한 수준에 이르고 있다. 폐광산은 지형적인 관점에서 접근성이 용이하지 않으며 그곳에서 유출되는 폐광배수는 하천과 지하수로 유입되어서 지역 주민들 건강에 위협을 주고 있는 실정이다. 특히 강원도 일부 지역에서는 이러한 현상으로 지역주민들이 고통을 겪고 있으며 무엇보다도 폐광후의 경제적 낙후현상이 심해지고 있는 실정이다. 기술적인 폐광지역 복원은 이미 많은 기술보고서와 논문을 통해 알려져 있다. 하지만 많은 기술적인 노하우가 축적되어 있어도 계획단계와 관리단계가 제대로 되지 않으면 경제적 손실 뿐만 아니라 지역주민의 불만을 오히려 유발시킬 수 있다. 따라서 본 연구의 목적은 폐광지역의 생태학적 재이용 측면을 고려하여 효율적인 계획과 관리 모델을 제시하고자 한다. 특히 지형정보시스템(Geographic Information System)의 정책결정단계에 적용함으로써 경제적 가치, 환경적 가치 그리고 공익적 가치 창출에 크게 이바지 할 수 있다.

비즈니스 프로세스 패밀리 모델을 이용한 비즈니스 프로세스 모델 자동 생성 도구 (An Automatic Business Process Model Generation Tool Using Business Process Family Models)

  • 홍민우;문미경;염근혁
    • 한국정보과학회논문지:소프트웨어및응용
    • /
    • 제35권8호
    • /
    • pp.479-492
    • /
    • 2008
  • 오늘날 소비자의 요구사항이 빠르고 다양한 형태로 변화함에 따라 기업의 자산인 비즈니스 프로세스도 이러한 변화에 민첩하게 대처할 수 있는 능력이 요구되고 있다. 이러한 요구를 만족시키기 위해서는 비즈니스 프로세스 모델의 생성 단계에서부터 발생할 수 있는 변화에 대하여 분석 및 표현이 가능한 핵심 자산이 존재해야 하며 이러한 핵심자산의 재사용을 통해 특성 변화를 만족하는 비즈니스 프로세스모델의 자동 생성이 가능해야 한다. 본 논문에서는 동일한 목적을 가지는 여러 비즈니스 프로세스 모델에 대하여 공통적인 특징을 공통성으로, 차별적인 특징을 가변성으로 분석하고 표현할 수 있는 비즈니스 프로세스 패밀리 모델을 설명한다. 그리고 비즈니스 프로세스 패밀리 모델의 공통성을 재사용하고 가변성에 대한 의사결정 정보를 반영하여 특정한 변화를 만족하는 비즈니스 프로세스 모델의 자동 생성을 지원하는 도구에 대하여 설명한다.