• Title/Summary/Keyword: Decision Cost

Search Result 1,968, Processing Time 0.034 seconds

Changes and Challenges in the Concept of Industrial Accident Insurance in Korea (산업재해 인정 형태 변화와 보상체계 합리화 연구)

  • Kim, Jin-Soo;Ra, Ji-Hun;Lee, Seong-Young
    • Korean Journal of Social Welfare
    • /
    • v.59 no.3
    • /
    • pp.59-73
    • /
    • 2007
  • The compensation system in industrial accident insurance is systemized with "either receiving all or no benefits at all" according to "admited or denied as an industrial accident". Therefore, they are centered on the decision as "industrial accident" or "non-industrial accident", but judging between the two is very complicated, and has inherent conflicting factors. In the early stage of industrialization, industrial accident compensation was based on the indemnity liability for employer's faults. In order to be compensated any damage, the injured worker should prove that the accident was not due to his or her faults. However it was very difficult for injured worker or his or her family to prove the employer's faults, so it was almost impossible to get compensation. Thereafter industrialization progress and improvement of workers' political status lead to conversion from principle of liability with employer's faults to principle of liability without employer's faults. In addition to that, coverage of industrial accident compensation was also expanded. This improvement strengthened the benefit payment principle of "All or Nothing". Even though the "All or Nothing" principle provokes tremendous criticism, the reason why it's difficult for industrialized countries to adopt partial compensation system, is that partial compensation system worsens the administrative hardship, therefore industrialized countries overcome the restrictions of the "All or Nothing" principle with making balance in provisions for any risk to some extent. However, in Korea because the general compensation system for covering medical cost and income loss from accidents, is not equipped, it could be possible to cause acute conflicts with regard to coverage of industrial accidents. Therefore it is required to improve the industrial accident insurance with the acceptance of the significance and logic of discriminated compensation, and create the integrated compensation system in the long run.

  • PDF

Management Efficiency of the Full-time and Part-time Oak Mushroom Farms using DEA models (DEA 모형을 이용한 주업과 겸업 표고재배 임가의 경영효율성 비교 분석)

  • Lee, Seong-Youn;Jeon, Jun-Heon;Won, Hyun-Kyu;Lee, Jung-Min
    • Journal of Korean Society of Forest Science
    • /
    • v.103 no.4
    • /
    • pp.639-645
    • /
    • 2014
  • This study was conducted to evaluate the management efficiency of oak mushroom farms in Korea using the Data Envelopment Analysis (DEA), which is one of the non-parametric estimation methods. The data that was analyzed in this study was from the result of 2013 survey entitled "Standard Diagnostic Table for Oak Mushroom Management", which was conducted from March 2012 to October 2012. This survey was based on the inputs and outputs of 20 oak mushroom farms. Specifically, this study analyzed the technical efficiency, pure-technical efficiency and scale efficiency using CCR and BCC model of the DEA methods. Furthermore, this study compares the management efficiency between the full time oak mushroom production farms and part time oak mushroom production farms. Results showed that mean value for the technical efficiency was 0.655 which is considered as inefficient in general. For the pure-technical efficiency and scale efficiency, the mean values were 0.830 and 0.747, respectively which showed that inefficiency in the management was observed in the mushroom farms. Results also showed that there were seven farms with a total efficiency of 1, namely Decision Making Unit(DMU)2, DMU5, DMU6, DMU8, DMU10, DMU15 and DMU20. The management efficiency of DMU7 specifically the inputs for production was analyzed and compared to DMU5 and DMU6 and results showed that the DMU7 had an excessive inoculation and site development cost. Lastly, it was also observed that the full time mushroom production farms were more efficient as compared to the part time mushroom farms because of the lower scale efficiency value or smaller area for mushroom production allotted in the part time farms.

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

A Study on the Design Value Analysis Methodology for Bridge Structure Using Reliability Analysis (신뢰성 해석을 이용한 교량구조물의 설계VA기법 연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Suk-Won;Jung, Jun-Hwa;Kim, Seong-Il
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.114-125
    • /
    • 2009
  • In this study, a design value analysis technique that considered stochastic LCC and stochastic performance evaluation was proposed, and by introducing the concept of reliability analysis, a decision making that secured reliability was supported. The results of this study, which was carried out according to the above objectives and methods, are summarized as follows: 1) The design value analysis procedures and value state function, improved in order to carry out a reliable analysis when evaluating alternate proposals that were extracted after the function definition was complete, were formalized, and in order to secure consistency and efficiency for value evaluation procedures, an evaluation index scheme was proposed; 2) Database collection and analysis were done for a bridge's LCC analysis. As for the collection scope of data, literature of previous research done on a bridge's LCC analysis was used as the basis for analysis, and for securing reliability regarding analysis results and dealing with uncertainty of collected data, the MCS technique was applied; 3) Weights and evaluation ranks for performance evaluation of each of the alternate proposals, as well as LCC analysis model, analysis period, discount rate, user expense, safety inspection and safety diagnosis expense conditions for LCC analysis were proposed. Lastly, a feasibility study was done and conclusion was made about "OO grand bridge and connecting road construction work execution design" project centered on value analysis execution case.

A COMPARATIVE STUDY OF CAUSES AND EFFECTS OF PROJECT DELAYS AND DISRUPTIONS IN CONSTRUCTION PROJECTS IN THE SOUTH AFRICAN CONSTRUCTION INDUSTRY

  • Oshungade, Oluwaseun O.;Kruger, Deon
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.13-25
    • /
    • 2017
  • Construction projects have been observed to have problems of project delays and disruptions and the South African construction industry is not an exception. This research identified causes and effects of project delay and disruption through a desktop study. Subsequently, a questionnaire was designed and used to conduct a survey to obtain the views of the three main construction project participants - clients, consultants, and contractors. The questionnaire contains 48 causes and 13 effects of project delay and disruption identified from the desktop study. This research identified sixteen most important causes of project delay and disruption and five most important effects of delay and disruption. Sixteen most important causes were: (1) strikes, (2) rework due to errors during construction, (3) shortage of materials in market, (4) suspension of work by the client, (5) poor communication between the parties, (6) ineffective planning and scheduling of project, (7) delays in issuing working drawings, (8) mistakes and discrepancies in design documents, (9) shortage of labours and equipment, (10) delay in decision making process by the client, (11) unforeseen ground conditions, (12) unclear and inadequate details in drawing, (13) inadequate contractor's experience, (14) delay in approving changes in the scope of works, (15) delay in material delivery and (16) unacceptable quality of materials. The five major effects include: (1) create stress on contractors, (2) cost overrun, (3) time overrun, (4) poor quality of work due to rush, and (5) disputes. Furthermore, the result of this research was compared with the result of previous studies conducted in other regions of Africa in terms of causes and effects of project delay and disruption. The research concludes that numerous causes and effects of delay and disruption are limited to South African construction projects based on the comparison. The causes limited to South African construction projects include: (1) strikes, (2) suspension of work by the client (3) mistakes and discrepancies in design documents (4) delay in approving changes in the scope of works and (5) unacceptable quality of materials, while the two major effects limited to South African construction projects includes: (1) create stress on contractors and (2) poor quality of work. In conclusion, some recommendations were made in order to minimise the causes of delay and disruption identified.

Comparison of The Importance of Evaluation Items for Landscape Performance and Sustainability Using Analytic Network Process (ANP) (ANP기법을 이용한 조경성능 및 친환경 평가항목 중요도 비교)

  • Ryu, Myeung-Ji;Lee, Hyung-Sook
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.47 no.6
    • /
    • pp.45-52
    • /
    • 2019
  • As international criteria and standards are required in the fields of design and construction, landscape performance must also be considered not only for the value of the landscape but also for providing quality assurance and sustainability. Given the lack of research on landscape performance, the present research was purposed to analyze the importance of potential assessment categories and items using an analytical network process. A list of assessment items, which is composed of 20 items and 6 categories, was derived through a literature review and a preliminary survey of 11 landscape professionals. An ANP model was established and a survey was conducted among 30 landscape practitioners to determine the weight of priorities considering the criteria. The results of ANP showed that the categories of site selection, preservation and health, and convenience had high priorities while materials had the lowest importance score. For the assessment items, a monitoring plan was the highest importance, followed by cultural/ historic preservation, management cost reduction, and natural ground areas. Despite the difficulties in quantifying landscape achievements, most respondents agreed that there needs to be an evaluation system for landscape performance in order to assure the quality and sustainability of landscape development. More research and discussion are needed to develop an assessment system for landscape performance that is applicable to Korean context.

A Study on Developing North Korean Agricultural Information Management System

  • Song Tao;Kim Kye-Hyun
    • Spatial Information Research
    • /
    • v.13 no.4 s.35
    • /
    • pp.365-372
    • /
    • 2005
  • In North Korea, there has been the considerable loss of human lives every year due to the deficiency of foods. Thus, in order to reduce such damages, a research project should be launched to provide various information for cooperation with North Korean government, and to develop proper agricultural information management system. Therefore, this research is mainly to develop North Korean Agricultural Information Management System (NKAIMS), which can collect, manage and analyze agricultural information and water resources utilization status of North Korea, and further support to make relevant decisions and establish the agricultural land-use plans. This research has three phases. The major outcome of the first phase is collecting the agricultural and water resources utilization data such as soils, rivers, streams, collective farms, etc., designing and building database, and developing integrated management system considering the users' requirements. The main work of the second phase is improving and reinforcing database such as adding the information of dams, land-over data, bridges, tunnels, satellite images, etc., inspecting and renewing such as importing detail attribute information of reservoirs, and improving system for more conveniently using. The third phase will be to supplement more useful functions such as statistic analysis, continually inspecting and improving database, and developing web-based system. The product of this research supports collecting and analyzing relevant data to facilitate easier agricultural activities and support effective decision making for food production in the preparation of unification. Moreover, through designing database considering sharing information and system expendability, it can support systematic data usability of agricultural information and save cost for data management.

  • PDF

The Cost of Child Rearing for Wrongful Conception (원치 않은 임신에 대한 아이의 부양비)

  • Bong, Young-Jun
    • The Korean Society of Law and Medicine
    • /
    • v.12 no.2
    • /
    • pp.219-263
    • /
    • 2011
  • "Wrongful conception" is a medical malpractice claim in which the plaintiff is the parent of a normal, healthy infant whose conception was unplanned and unwanted. Medical malpractice in wrongful conception can be the result of a failure to provide informed consent to a patient, failure to properly perform a surgery, or a physician's negligent handling of a patient's problems. In the concrete, wrongful conception cases fall into two categories; those involving pre-conception negligence, such as a failed contraceptive, sterilization or failing of the controlling of embryo-number on the IVF, and those involving post-conception negligence, such as a failure to diagnose a pregnancy or to perform an abortion procedure. In addition, Medical malpractice can be the result of a failure to provide informed consent to a patient. When bad results occur by medical malpractice or failure to provide informed consent to a patient, the range of recovery of damages is decided by a traditional civil liability law. However the calculation of damages for wrongful conception is not easy because the high value of life is included in that case. So many courts opinions in foreign country and Seoul High Court decision in 1996 allow damages for the pregnancy, birthing process and sterilization costs, but refuses to allow damages for child rearing expenses. As to the range of recovery of damages for wrongful conception, one approach says that to allow damages in a suit such as this would mean that the physician would have to pay for the fun, joy and affection which plaintiff will have in the rearing and educating of the plaintiff's baby. To allow such damages would be against the dignity of the baby based on article 10 of the Constitution. However another approach says that damages are recoverable for all expenses related to child birth as well as for child rearing costs. Because the damages that the parents should bear a burden to the tort damage done is not a baby itself but child rearing costs. In other words, although the baby is healthy or not, economic burden of the parents can not be disregard. And denial of compensation for costs of child rearing may invalidate the role of liability law, grant the physician with a exemption certificate of liability. As a result, the medical field of procreation can be easily isolated from a liability of reparation. Therefore, on the liability law like the other medical malpractice action, parents who became pregnant or gave a birth by physician, wrongfully performed sterilization operation, etc. should be compensated for all damages relevant to unplanned and unwanted conception or birth as well as costs of child rearing.

  • PDF

A Study on Medical Fee System of the convalescent hospital -Focused on the case of patient group adjustment - (요양병원 수가제도에 대한 소고 -환자군 조정 판결을 중심으로 -)

  • Kwon, Hye Ok
    • The Korean Society of Law and Medicine
    • /
    • v.18 no.2
    • /
    • pp.195-218
    • /
    • 2017
  • The increase in medical expenses for convalescent hospitals is increasing abnormally, which puts enormous burden on the National health insurance finances. This is a phenomenon that has been associated with the social phenomenon of rapid aging. The fact that the convalescent hospitals are paid the fixed amount per day for hospitalization became the incentive for some hospitals to use the patients as means of making money. And these hospitals intend to get regular care or take medicines at other hospitals in order to reduce medical expenses, even when the medical fee is paid. In order to prevent such financial leaks, the Health Insurance Review and Assessment Service adjusted the patient group for inpatients in a hospital with the above behavior, and then cut the cost of medical care benefits. However, Above decision was canceled by the court on the grounds that there was no basis rule. However, based on the above case, I think that it can be an opportunity to draw up the problem and to improve of the Medical Fee System of hospital. The modified medical fee system can strengthen the medical function of the convalescent hospital. In addition, it seems reasonable to exclude admission for "physically disabled group". Even if admission is allowed for the physically disabled group due to social needs, it should be excluded from the National health insurance for the fianacial soundness and the sustainability of the system.

  • PDF

농식품안전 정책방향

  • Jo, Jang-Yong
    • 한국환경농학회:학술대회논문집
    • /
    • 2009.07a
    • /
    • pp.3-18
    • /
    • 2009
  • It is difficult for consumers to satisfy high safety request with post-management method such as inspection and surveillance, as various changes in-and-out of the country associated with food safety. In terms of food safety problems related to foods, it is crucial to recognize public health and consumer protection and construct pre-preventive Food Control System. A joint committee, FAO/WHO made the following consultations to the National Food Safety System. ${\circ}$ Approach entirely from farm to table ${\circ}$ Get ready for Risk Analysis System ${\circ}$ Secure transparency ${\circ}$ Establish the optimal policy by evaluating the effect of regulation When it comes to summarizing the consultation, it would be accumulated as two key words; "Efficiency" and "Credibility". Whereas the problem of efficiency focuses on precaution rather than post-management, it requires policy option to maximize consumer's benefit by evaluating the cost for the Food Safety Management and its benefit. Also, analyzing risk's character and amount, demanding an optimal means, and introducing scientific analysis system put much value on the stakeholder's communications are procedure's security which can satisfy both "Efficiency" and "Credibility" simultaneously. Especially, it is emphasized here that Risk Assessment need to be separated from Risk Management. This action is a valid means of credibility security throughout improving transparency. A number of nations and organizations have reformed the method of food management passing through reflection and examination of the prior National Food Safety Management since BSE occurred in Britain, 1996. FSA; Food Standard Agency, AFFSA, EFSA, BfR, and FSC are Risk Assessment Organization functionally separated from Risk Management Organization, JECFA, JMCFA, JMPR, JEMRA in Codex charge Risk Assessment internationally. In case of advanced countries excluding several those such as The U.S. and so forth, though these Risk Assessment Organizations are either separated functionally within Risk Management Organization or operated as apart organ, common factors are in which it has independence as Science Base. While securing independence of Risk Assessment Function, it is a tendency Risk Management should be functionally unified into efficiency as well. Though Germany constructs integral Risk Management System of diverse ways according to social and political conditions of each country such as GFOCP, DVFA, SNFA, CFIS and AQIS, there is a key word in the center, "Securing efficiency of Food Safety Management". However our nation has a representative plural;diversified system with The U.S., we took a step forward for unification as empowering policy's generalization;adjustment and Risk Assessment Function by means of enacting the "Food Safety Fundamental Law" in 2008 and establishing the "Food Safety Policy Commission" with private and governmental sectors in the Prime Minister's office. Even though the unification of Risk Management hereby increased, there is the lack of strengthening function of Risk Assessment and securing independence. It needs to be required for the professional committee in Food Safety Policy Commission to develop as a exclusive office of Risk Assessment by separating from a policy decision. Administrative Branches should reinforce feeble functions such as fundamental investigation;research for carrying out Risk Assessment with securing efficiency throughout reassessment of prior Risk Management Means.

  • PDF