• Title/Summary/Keyword: Database management system

Search Result 2,449, Processing Time 0.034 seconds

On the Implementation of Failure Diagnosis System for Naphtha Reforming Process (나프타 개질공정을 위한 이상 진단시스템의 구현)

  • Cha, Un-Ok
    • Journal of Korean Society for Quality Management
    • /
    • v.20 no.1
    • /
    • pp.91-100
    • /
    • 1992
  • A diagnosis system for naphtha reforming process has been designed and implemented using expert system building technique. The system is composed of knowledge base, inference engine, user interface, database and database interface. The concept and the method of this system may be applied to development of other systems for the reforming process.

  • PDF

Database Modeling and Environmental Information for a Radioactive Waste Repository Site

  • Park S. M.;Rhee C. G.;Park J. B.;Lee H. J.;Kim Chang Lak
    • Nuclear Engineering and Technology
    • /
    • v.36 no.3
    • /
    • pp.263-275
    • /
    • 2004
  • For the safe management of nuclear facilities, including a radioactive waste repository, data about the facility site and the surrounding environment must be collected and managed systematically. This is particularly true for a radwaste repository, which has to be institutionally controlled for a long period after closure. The objectives of this study are (1) to establish a systematical management plan for information about a radwaste repository site and its environment, and (2) to design a database management program for this information, based on the Relative Database Management System (RDBMS). The spatial data are designed by the geodatabase, which is a new object, based on the RDBMS, to manage spatial information related to the database. To meet this requirement, a new program called 'Site Information and Total Environmental data management System (SITES)' is being developed. The scope that produced from the first step of the present study for development of the SITES is introduced. The database is designed to combine spatial and attribute data, and is designed for the establishment of the Geographic Information System (GIS). The hardware and software systems are designed with consideration given to the total data management of the items within the radioactive environment.

Management of oral and maxillofacial radiological images (Dr. Image를 이용한 구강악안면방사선과 의료영상 관리)

  • Kim Eun-Kyung
    • Imaging Science in Dentistry
    • /
    • v.32 no.3
    • /
    • pp.129-134
    • /
    • 2002
  • Purpose : To implement the database system of oral and maxillofacial radiological images using a commercial medical image management software with personally developed classification code. Materials and methods : The image database was built using a slightly modified commercial medical image management software, Dr. Image v.2.1 (Bit Computer Co., Korea). The function of wild card '*' was added to the search function of this program. Diagnosis classification codes were written as the number at the first three digits, and radiographic technique classification codes as the alphabet right after the diagnosis code. 449 radiological films of 218 cases from January, 2000 to December, 2000, which had been specially stored for the demonstration and education at Dept. of OMF Radiology of Dankook University Dental Hospital, were scanned with each patient information. Results: Cases could be efficiently accessed and analyzed by using the classification code. Search and statistics results were easily obtained according to sex, age, disease diagnosis and radiographic technique. Conclusion : Efficient image management was possible with this image database system. Application of this system to other departments or personal image management can be made possible by utilizing the appropriate classification code system.

  • PDF

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

Construction the Full-Text Database and Development a Integrated Management System of Research Output at a Research Library (전문도서관의 연구산출물 원문데이터베이스 구축 및 통합관리시스템 구현)

  • Yoo, An-Na;Oh, Jeong-Hoon
    • Journal of Information Management
    • /
    • v.34 no.1
    • /
    • pp.59-75
    • /
    • 2003
  • This study described about development the integrated management system for research reports and construction full text database of KAERI reports. This system enables centralization of various information related to reports by connecting with management information system. The advantages of this study are consistency of database between digital library and MIS, reduction of budget and manpower and increase of research productivity.

DESIGN AND IMPLEMENTATION OF MULTIMEDIA MATADATA MANAGEMENT SYSTEM FOR HETEROGENOUS SOURCES

  • Park, Seong-Kyu;Lee, Yang-Koo;Chai, Duck-Jin;Kim, Hi-Seok;Ryu, Keun-Ho
    • Proceedings of the KSRS Conference
    • /
    • 2008.10a
    • /
    • pp.398-401
    • /
    • 2008
  • With the advance of internet and computer processing technique, users can easily access and use the multimedia contents involving the various pictures, videos and audios information. And users request more convenient and accurate multimedia services. In these environments, it is difficulties to integrate and manage metadata standards because there are various standards in multimedia applications according to types of services and data formats individually. In this paper, we design and implement the multimedia metadata management system for integrating from heterogeneous sources. In our system, we managed heterogeneous metadata by integrating to unified schema using mapping table. Through proposed system, users can search multimedia data easily without considering variety of application services.

  • PDF

Comparison of Database Models for Developing a Pavement Performance Analysis System

  • Choi Jae-ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.79-86
    • /
    • 2004
  • One of the most difficult tasks in pavement management information systems is establishing the links between performance measures of a structure and the design and construction inputs. In-situ pavement performance can be considered a response variable to many project input variables, such as design, construction, and traffic loading effects. If we are to fully understand the component of pavement performance and specify the inputs through design and construction specifications to achieve that performance we must develop quantitative relationship between input and response variables through a scientific, fully integrated Pavement Performance Analysis System (PPAS). Hence, the objective of this study is to design a database model required for developing an effective database template that will allow analysis of pavement performance measures based on design and construction information linked by location. In order to select the most appropriate database model, a conceptual database model (Entity Relationship Model) and dimensional model, which is believed to be the most effective modeling technique for data warehouse project, are designed and compared. It is believed that other state highway agencies could adopt the proposed design strategy for implementing a PPAS at the discretion of the state highway agencies.

A Study on the Analysis and Methods to Improve the Management System for Building Energy Database (국가 건물에너지통합관리시스템의 데이터 품질 분석 및 개선방안 연구)

  • Kim, Sung-Min;Yoon, Jong-Don;Kwon, Oh-In;Shin, Sung-Eun
    • Journal of Energy Engineering
    • /
    • v.25 no.1
    • /
    • pp.131-144
    • /
    • 2016
  • Damage occur frequently around the world on climate change and the main cause of greenhouse gas emissions regulation is growing. To this end, the government has built integrated management system for national building energy. The building energy information is total 6.8 million complex. Integrated management system for national building energy database are matched building registers information and energy information of the supply agencies. However, the matching process has its limitations so advanced work is in progress continuously. This study analyzed integrated management system for national building energy database quality and limitations and deduce improvement plan to increase system reliability and availability. The existing database matching average rate is 85.6%. 58.2% of the total non-matching data type has no building information. To ensure the ease of new database matching and the accuracy of the existing database matching, address standarization and building properties system are needed between building information and energy information. Also, The system construction is required to include information on other energy sources like petroleum energy which has high proportion of non-urban areas and small residential areas and renewable energy which has high potential in development and utilization.

Development of Relational Database Management System for Agricultural Non-point Source Pollution Control (관계형 데이터베이스를 이용한 농업비점 자료 관리 시스템 개발)

  • Park, Jihoon;Kang, Moon Seong;Song, Inhong;Hwang, Soon Ho;Song, Jung-Hun;Jun, Sang Min
    • Journal of Korean Society of Rural Planning
    • /
    • v.19 no.4
    • /
    • pp.319-327
    • /
    • 2013
  • The objective of this research was to develop a relational database management system(RDBMS) to collect, manage and analyze data on agricultural non-point source(NPS) pollution. The system consists of the relational database for agricultural NPS data and data process modules. The data process modules were composed of four sub-modules for data input, management, analysis, and output. The data collected from the watershed of the upper Cheongmi stream and Geunsam-Ri were used in this study. The database was constructed using Apache Derby with meteorological, hydrological, water quality, and soil characteristics. Agricultural NPS-Data Management System(ANPS-DMS) was developed using Oracle Java. The system developed in this study can deal with a variety of agricultural NPS data and is expected to provide an appropriate data management tool for agricultural NPS studies.

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.