• 제목/요약/키워드: Data Breakdown Structure

검색결과 109건 처리시간 0.026초

건설공사 설계도서매뉴얼의 전자화 절차구성 및 실무 적용효과 분석 (Procedure Development for Organizing Electronic Technical Manual of Construction Design Information and Applicability Analysis for Practical Project)

  • 강인석;문현석;곽중민
    • 한국철도학회논문집
    • /
    • 제10권2호
    • /
    • pp.103-111
    • /
    • 2007
  • The existing design materials by document type are restricted in searching and acquiring necessary design information because the materials consist of huge information and various document types. This study suggests a methodology to develop an electronic technical manual that can manage construction design materials by XML-base integrated information system. Electronic technical manual for design materials can provide visualized information through various multimedia tools such as multi-link, virtual reality and animation. Using an integrated electronic manual for construction project can prevent to miss necessary design information. The results of this study includes a data flow diagram to develop an interactive electronic technical manual (IETM) for construction design information. Finally the study suggests some scenarios for practical use and quantitative analysis of application effect analysis by AHP method.

BIM 기반 3차원 모델 라이브러리를 통한 모듈러 교각의 정보모델링 (Information Modeling of Modular Bridge Pier using BIM Based 3D-Model Library)

  • 조제헌;김동욱;이광명;남상혁
    • 한국BIM학회 논문집
    • /
    • 제3권4호
    • /
    • pp.11-18
    • /
    • 2013
  • Modular technology has become a major issue of the construction industries to enhance their productivity. Modular bridge construction generally requires the collaboration between the contractor, designer, fabricator and constructor. Therefore, a readily accessible information model based on BIM technology should be provided for their communication during a construction project life-cycle. In this study, BIM based 3D information modeling was carried out for the modular bridge pier. First, the product breakdown structure (PBS) and level of detail (LOD) of the pier were defined. Based on them, 3D models were created by using parametric modeling method. In addition, database was constructed for the exchange of geometry and property data of 3D models. Finally, application areas of 3D information model were suggested, including the quantity estimation and the 4D simulation.

원자력연구개발 목표관리시스템 개발 (A study on the development of the nuclear R&D performance monitoring system)

  • 박준원;최현호;원병출
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.217-220
    • /
    • 1996
  • This study presents a R&D performance monitoring system (RDMS) that is applicable for managing nuclear program in KAERI. The prime goal of RDMS is to furnish project manager with reliable and accurate information on status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. In this study, the work breakdown structure (WBS) as the governing factor for integration of scope, schedule, resource data was derived, and the above parameters were loaded personal computer. A RDMS is comprised of about 12,000 R&D activities of the 16 goverment-led projects. The Primavera software was used to monitor the progress, evaluate the performance and analyze the resource distribution to activities.

  • PDF

우주 발사 시스템 개발에 있어서의 SE 관리기법 적용 (Application of SE Management Techniques for Space Launch System Development)

  • 조미옥;조병규;오범석;박정주;조광래
    • 시스템엔지니어링학술지
    • /
    • 제1권1호
    • /
    • pp.53-60
    • /
    • 2005
  • System engineering(SE) management techniques applied for space launch system development are introduced to assess the current status and address the effectiveness of these techniques. Management plans and guides are prepared for the work breakdown structure, data, configuration, interface control, quality assurance, procurement, reliability, risk and verification/validat ion. Further improvement is required for the system engineering management plan(SEMP) to merge the international cooperation into current engineering management system.

  • PDF

작업분류체계(WBS)를 이용한 안전해체공사 시스템 개발에 관한 연구 (A Study on the Development of Safety Demolition Work System by using Work Breakdown Structure)

  • 김광서;양극영;이용수;윤여완;김천학
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제2권3호
    • /
    • pp.176-187
    • /
    • 1998
  • The Dismantlement and Construction of the buildings have the characteristic of floating change with repetition within a Time Schedule which has fixed resources, that is, Manpower, Materials and Equipments, and involve many disaster factors in performing each processes. But as these factors are variable, a work supervisor should be able to understand data analysed distinctive factors of each activities systematically, organizationally, and scientifically, and diagrammatic information media so that he can control any complex and situation beyond forecast. Thus this study is intended to be a barometer of weighing if the existing process schedule has taken security into consideration by making the characteristics of organization and action of Work package per process in a building field with more factors like these into a network system and is intended to minimize construction disasters by systematizing this into a Transformational Network.

  • PDF

컨테이너 터미널 장비의 RAM 향상을 위한 관리 시스템 (Management System for Improving RAM of Equipment in Container Terminals)

  • 윤원영;김귀래;하영주;손범신;김혜정
    • 산업공학
    • /
    • 제19권3호
    • /
    • pp.245-254
    • /
    • 2006
  • Equipments in container terminal have a lot of parts, and an equipment breakdown affects the productivity of terminal. In this paper, we develop a maintenance management system for improving reliability, availability and maintainability of equipments in container terminals. The developed system consists of five modules : equipment structure module, equipment operation management module, maintenance control module, spare part control module and data analysis module. The system supports reliability engineers to manage and improve RAM of equipments in container terminals. For example, FMEA, failure state analysis and life distribution parameters estimation are easily or automatically done by the system. This system also provides optimal preventive maintenance intervals by simulation and optimal yearly PM schedules for equipments in container terminal are recommended.

Dielectric Characteristics of Magnetic Tunnel Junction

  • Kim, Hong-Seog
    • 공학논문집
    • /
    • 제6권2호
    • /
    • pp.33-38
    • /
    • 2004
  • To investigate the reliability of the MTJs on the roughness of insulating tunnel barrier, we prepared two MTJs with the different uniformity of barrier thickness. Namely, the one has uniform insulating barrier thickness; the other has non-uniform insulating barrier thickness as compared to different thing. As to depositing amorphous layer CoZrNb under the pinning layer IrMn, we achieved MTJ with uniform barrier thickness. Toinvestigate the reliability of the MTJs dependent on the bottom electrode, time-dependent dielectric breakdown (TDDB) measurements were carried out under constant voltage stress. The Weibull fit of out data shows clearly that $t_{BD}$ scales with the thickness uniformity of MTJs tunnel barrier. Assuming a linear dependence of log($t_{BD}$) on stress voltages, we obtained the lifetime of $10^4$years at a operating voltage of 0.4 V at MTJs comprising CoNbZr layers. This study shows that the reliabilityof new MTJs structure was improved due to the ultra smooth barrier, because the surface roughness of the bottom electrode influenced the uniformity of tunnel barrier.

  • PDF

Kinetics and Mechanism of the Aminolysis of Thiophenyl Acetates in Acetonitrile

  • 오혁근;양진희;이해황;이익춘
    • Bulletin of the Korean Chemical Society
    • /
    • 제20권12호
    • /
    • pp.1418-1420
    • /
    • 1999
  • Kinetics and mechanism of the aminolysis of Z-thiophenyl acetates with X-benzylamines are investigated in acetonitrile at 45.0 ℃. The magnitudes of Bronsted coefficients β$_x$ (=1.3~-1.6) and β$_z$ (= -2.1~-2.4) are all large and cross-interaction constant ρxz is relatively large and positive (0.90). These trends are consistent with the rate-limiting breakdown of a tetrahedral intermediate, $T^±$. The proposed mechanism is also supported by adherence of the rate data to the reactivity-selectivity principle (RSP). The kinetic isotope effects, $k_H/k_D$, are greater than unity (1.3-1.4) suggesting a possibility of hydrogen-bonded four-centered transition state. The activation parameters, ΔH$^≠$ and ΔS$^≠$, are consistent with this transition-state structure.

조건별 세부공종 시뮬레이션을 통한 아스팔트 포장공사의 생산성 분석 (Productivity Analysis for Asphalt Paving by Means of Simulation Technique for Site Conditions)

  • 김유진;이수민;노재윤;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.34-35
    • /
    • 2021
  • Currently, the Korean Smart Construction Corporation aims to stimulate overseas expansion of smart construction technology centered on Expressway development. In addition, the integrated classification system of construction information with Work Breakdown Structure(WBS) is currently being established in Korea, but its application to the construction industry is limited. In this study, data generation using simulation is carried out at the lowest level of WBS presented by the Korea Expressway Corporation, and detailed process productivity is predicted by site conditions.

  • PDF

A Case Study on Assessing the Productivity of a BIM team in a Construction Company

  • Huang, Chien-Hsun;Hsieh, Shang-Hsien
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.259-262
    • /
    • 2015
  • Due to the labor-intensiveness, high investment cost, long execution time, frequent change orders, and many stakeholders in a BIM project, a BIM manager is bound to face a lot of risks to make decisions in cost managing process. Since the productivity of a BIM team will affect the execution cost, this study investigates a simple method of assessing the productivity of a BIM team using the working timesheet records of the team. In this research, the productivity of a BIM team is defined as the effective working floor area (in square meters) of BIM uses per labor-time (in man-months) spent by the team. After the applicability of this method is tested by regression analysis using data from 5 real BIM projects in the construction phase, it is found that the simple productivity definition adopted in the method, although easy-to-implement, does not produce a statistically constant productivity value. More research is therefore needed in the future to devise better indicator(s) for assessing the productivity of a BIM team.

  • PDF