Journal of The Korean Society of Agricultural Engineers
/
v.58
no.2
/
pp.11-20
/
2016
Korea has 17,500 irrigation dams and facing variety of causes that jeopardize dam safety. With limited resources available to manage large inventory, a portfolio risk analysis application method for numerous irrigation dam safety is essential. The purpose of this study is to find an optimum way to adopt the risk analysis to the large number of irrigation dams in Korea and to propose the portfolio risk analysis process for irrigation dams. In this study, the necessity of the risk analysis for reservoirs safety has been suggested and a phased process using pre-screening and screening methodology has been proposed. This proposed procedure will help to effectively introduce the risk analysis for reservoirs safety in Korea.
This study was performed to understand the morphological and ecological characteristics of Peridinium bipes var. occultatum Lindem., which is the organism responsible for freshwater red tides in Sangsa dam and Miryang dam reservoirs. The samples were collected from April to July 2004 when the freshwater red tides occurred. In the study, we were able to differentiate P. bipes var. occultatum from P. bipes, a closely related species, by its smaller antapical horn size. In Miryang dam reservoir the red tide occurred only within the area of the upstream, but it was well developed in all of the water area in Sangsa dam reservoir. In 2004 average LTSI (Lake Trophic Status Index; Yang and Dickman, 1993) of Miryang dam reservoir was 3.53 of mesotrophic state and Sangsa dam reservoir was 8.59 of eutrophic state. It was determined, through culture experiments under various conditions that vitamins, trace elements, phosphorus and nitrogen were important contributing factors to the growth of P. bipes var. occultatum. A rapid toxic effect of P. bipes var. occultatum on aquatic organisms such of Daphnia magna and Oryzias latipes was not identified in this study.
Park, Sung Kyung;Lim, Cheong Ryong;Han, Jae Hwan;Chung, Won Ho
Journal of agriculture & life science
/
v.52
no.6
/
pp.139-153
/
2018
This study analyzes the economic effect of rehabilitation and upgrading of reservoirs as a prevented method against natural disasters under recent abnormal weather conditions and dam-break. For the analysis, we divide the purpose of rehabilitation and upgrading of reservoirs into the stable supply of rural water under uncertain weather conditions and the prevention of collapse due to the aging of the reservoir. We measure the economic effect of rehabilitation and upgrading of reservoirs by estimating the resident's willingness-to-pay for the project through Contingent Valuation Method(CVM). The result shows that distributions of willingness-to-pay to prevent natural disasters and dam-break are similar to each other. About 66% of the residents in sample regions are willing to pay for the project. The resident's willingness-to-pay to protect natural disasters and dam-break are 32,250 to 46,147 won and 28,427 to 47,308 won respectively on average for all sample regions. The comparison of willingness-to-pay by type of regions shows that paddy field areas are the highest followed by facility cultivation areas and urban areas. In addition, total expected value of the projects calculated based on the resident's willingness-to-pay for paddy field areas and facility cultivation areas are much larger than actual project costs. This implies that rural residents are fully aware of the importance of the project to prevent natural disasters and dam-break and are willing to pay for additional costs if needed.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
1999.10c
/
pp.550-555
/
1999
yongdam multipurpose is under construction to divert a part fo Geum riverlfow to Mankyung watershed and to supply the domestic water to the Chunju region and produce the hydro-electricity. Generally construction of dam by the method of inther-region water transfer affects the quantity and quality of water inthe down streams and reservoirs. The impact of operation plan of Yondgam dam on the quantity and quality of water in the Guem river and Daechung dam was investigated .It was recommended that the discharge of water transfer from one watershed to another should be minimized as much as possible.
Proceedings of the Korea Water Resources Association Conference
/
2007.05a
/
pp.31-39
/
2007
In this study we developed a turbidity management system to support the operation for effective turbid water management. The decision-making system includes various models for prediction of turbid water inflow, effective reservoir operation using the selective withdrawal facility, analysis of turbid water discharge in the downstream. The system is supported by the intensive monitoring devices installed in the upstream rivers, reservoirs, and downstream rivers. SWAT and HSPF models were constructed to predict turbid water flows in the Imha and Andong catchments. CE-QUAL-W2 models were constructed for turbid water behavior prediction, and various analyses were conducted to examine the effects of the selective withdrawal operation for efficient high turbid water discharge, turbid water distribution under differing amount and locations of turbid water discharge. A 1-dimensional dynamic water quality model was built using Ko-Riv1 for simulation of turbidity propagation in the downstream of the reservoirs, and 2-dimensional models were developed to investigate the mixing phenomena of two waters discharged from the Andong and Imha reservoirs with different temperature and turbidity conditions during joint dam operation for reducing the impacts of turbid water.
Journal of The Korean Society of Agricultural Engineers
/
v.64
no.5
/
pp.17-26
/
2022
In this study, in order to establish the criteria for evaluation of importance by the type of facility specialized for agricultural reservoirs, an expert group consisting of a total of 167 members who were in management, or specialized in the fields of design, research, and diagnosis were organized, and the importance for facilities was set with application of the AHP technique. The importance of dam body, spillway, and intake structure composing a reservoir were set at 59%, 24%, and 17%, and the importance of dam crest, upstream slope, and downstream slope constituting a dam body was set at 32%, 31%, and 37%, respectively. In addition, the importance of approach channel, regulated channel, chute channel, and stilling basin consisting a spillway was set at 15%, 44%, 26%, and 15%, and the importance of inclined conduit and outlet conduit consisting an intake structure was set at 35% and 65%, respectively. The safety grade of the reservoirs evaluated by applying the newly presented importance values in this study showed the rearrangement of the grades with a change of 11% compared to the previous grades. In this way, the newly established criteria are expected to be utilized as basic data with strategic importance in reservoir safety management and disaster prevention as well as the operation of systems in the future.
Journal of The Korean Society of Agricultural Engineers
/
v.50
no.3
/
pp.51-58
/
2008
Ninety five percent of the agricultural reservoirs were constructed by earth or rock. There are 18,000 agricultural dams and reservoirs in Korea. Therefore, it is easy to evaluate or identify their problems. Reservoirs should be repaired before too late. It is required to guarantee the proper functions of the existing agricultural dams and reservoirs in time to minimize the damage. In this study, in order to evaluate degradation of agricultural reservoir, grasps the safety of reservoir choosing for agriculture of 25 reservoirs which are distributed in Chungbuk region rural and analyzed using possibility as reservoir of agricultural usage. The degradation was evaluated by a compilation of the result where embankment and structure were separately handled, measured and then multiplied scores for each categories. By activating this research, current status of agricultural reservoir and degradation status will be easily measured. In addition, the research could be also used as a tool for an effective control or maintenance.
Magazine of the Korean Society of Agricultural Engineers
/
v.24
no.1
/
pp.44-52
/
1982
Recently, estuary reserovoirs have been actively constructed in Korea and also in Japan there are a large number of estuary reservoirs constructed. But most of the estuary reservoirs are located at the downstream of a river where geographical condition is best for the construction of an enclosing dam. And an effective utilization of water from the estuary reservoir seems to be difficult even if estuary reservoirs are considered to be the water resources the most available for their watershed. Studies on estuary reservoirs so far have been mainly concentrated on the physical and engineering problems of the dam construction itself. The purpose of the present study is to review the estuary reservoir planning in connection with the water resources development and to study a basis of the planning. First, the levels of water use in Korea and Japan were compared with those of other countries in the world. And then, some representative reservoirs were selected to study the roles of a reservoir and water-using conditions in the watershed. Based on the study, a survey was given on the relation between a dam construction upstream and an estuary reservoir construction downstream of a river. Finally, a comprehensive examination was made of the bases of estuary reservoir planning. (1) The estuary reservoir planning is deeply related to the plan for water use develo- pment in the watershed. After the upstream water resources were fully developed up to the most, water reso- urces development by an estuary reservoir should be started. (2) If an estuary lake has a capacity big enough, it can store flood discharge of the watershed without any loss and become a basic facility that will bring about the maxi- mum use of water from the watershed. (3) Estuary reservoirs store water used in the upstream watershed, so recycling of water use is attained by the reservoir. Water in the estuary lake is difficult to be fresh water in its long run. Therefore, estuary reservoir should be located at a place where polluted water is purified and refused. All the planning should be based on the assumption that water in the estuary lake is not fresh but polluted after a long time. (4) The estuary lake can only supply water to the lower basin directly. But the upstream area is benefited from the estuary lake by exchange of irrigation water sources between the lower and the upper area. So a large-scale exchange plan between new and existing water resources is important. By constructing estuary reservoirs and the exchange of water sources between upper and lower areas, the reasonable maximum use of water from the whole watershed is at- tained. (5) The big problem coming from the water resources development by an enclosing estuary is salt water intrusion into the lake. To maintain the estuary lake salt-free, multi-purpose use of the lake should be avoided. It is necessary to take such fundamental measures as abolition of back flow operation of gate, and the closing of the fish port and the fish ladder. The results mentioned above were found in this study and these results of this study could be used for the adequate planning of estuary reservoirs in connection with the maximum water use of the watershed.
Ethiopia is branded as the Water Tower of Africa because of its abundant inland water bodies that may be used sustainably to boost the economy. This review article's goal is to examine the current status and future potential of Ethiopia's fisheries, with a special focus on reservoirs. There are 200 known fish species (194 native, 40 endemic, and 11 exotic) in in Ethiopia's inland water. Ethiopia's fish production has increased by a factor of more than five in the past three decades (3,500 tons in 1983 to 15,681 tons in 2000 and 18,058 tons in 2010). However, fish produced in reservoirs is too low (8,059 t/year). The current fish harvests from reservoirs are significantly below the predicted potential yield, accounting for only 35% of the calculated fish production capacity. In this review, 14 potential reserves were revealed. A total of 48 fish species have been reported in these, of which 26 species (or around 54%) are present in Alwero reservoir. 19 of the 48 species that have been officially recognized belong to the Cyprinidae family and made up nearly 40% of the fish population in Ethiopian reservoirs. There has been, however, a decline in the productivity of Ethiopia's reservoir fish. Hence, actively start fishing in the numerous reservoirs that have been neglected yet, link the potential of fisheries and the benefits of the fish farming supply chain, let's begin building several other reservoirs similar to the Grand Ethiopian Renaissance Dam and beginning mechanized-based fish harvesting.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.